Welcome!

News Feed Item

Gold Standard's First Drill Program at Pinion Confirming Historical Results and Finding New Gold Mineralized Zones

First five holes include oxidized intercepts of 39.6 m. of 1.01 g Au/t and 69.8 m. 0.89 g Au/t

VANCOUVER, BRITISH COLUMBIA -- (Marketwired) -- 06/25/14 -- Gold Standard Ventures Corp. (TSX VENTURE: GSV)(NYSE MKT: GSV) ("Gold Standard" or the "Company") today announced assay results of the first five drill holes from the Pinion Phase 1 drilling program at its 100%-owned Railroad-Pinion Project in Nevada's Carlin Trend. These results to date are meeting three key objectives of the drill program: verifying historical drill data, expanding the known limits of the gold mineralization and demonstrating the predictability of GSV's new geological model.

Drilling highlights include:

--  PIN14-01, a core hole, returned 69.8m of 0.89 g Au/t beginning
    essentially at surface, successfully twinning and verifying results from
    historical RC hole TCT-017 (68.6m of 0.92 Au/t).
--  PIN14-02, a 60m westerly RC step-out from the known limits of the Main
    Zone, returned 0.44 g Au/t over 15.2m, potentially opening the deposit
    in this direction.
--  PIN14-05, an RC hole, returned 1.01 g Au/t over 39.6m and a further 0.39
    g Au/t over 53.4m in a lower breccia zone which is potentially a major
    new target at Pinion.

The Phase 1 program consists of 13 vertical drill holes, eight of which have been completed (click the following link for Pinion Phase 1 drill hole map: http://goldstandardv.com/proposed-pinion-holes/). Assays are pending for holes PIN14-06 through PIN14-10. One RC hole (PIN14-10) and one core hole (PIN14-08) are currently in progress. In addition to the objectives noted above, the program will collect material for density and metallurgical testing in advance of an initial NI-43-101 resource estimation expected in late July.

Key Observations:

--  The targeted multilithic, dissolution collapse breccia host was
    intersected in all five drill holes. Gold mineralization is continuous
    and widespread within this highly permeable, silicified and oxidized
    breccia which is favorably sandwiched between relatively impermeable
    silty micrite of the overlying Mississippian Tripon Pass Formation and
    thick, bedded calcarenite of the underlying Devonian Devil's Gate
    Formation (click here for Pinion deposit cross section:
    http://goldstandardv.com/pinion-cross-section/).
--  Gold-bearing intercepts in PIN14-03 and PIN14-04 expanded mineralization
    60 meters to the west along a north-northeast-striking fault, adding to
    the evidence of an emerging connection between the historical North and
    Main Zones.
--  PIN14-05 intersected two separate intervals of oxidized gold
    mineralization in the North Zone. The lower gold intercept represents a
    new target, not identified by historic drilling, which lies along a
    northwest-striking fault. Immediately below the lower gold intercept,
    PIN14-05 intersected a quartz-sericite-pyrite altered, quartz porphyry
    dike-filled fault before ending in Chainman sandstone. The presence of
    Chainman sandstone indicates that additional, untested collapse breccia
    targets could exist at depth at the underlying Devil's Gate Formation
    contact-a typical occurrence on the Carlin Trend.

Drill results for the first five holes are as follows:

----------------------------------------------------------------------------
                                          Intercept   Thickness     Grade
Drill Hole  Method     Incl.    TD (m)       (m)         (m)      (g Au/t)
----------------------------------------------------------------------------
PIN14-01     Core       -90      96.3    1.5 - 71.3     69.8        0.89
----------------------------------------------------------------------------
                including                9.8 - 17.1      7.3        2.31
----------------------------------------------------------------------------
PIN14-02      RC        -90      68.6    18.3 - 33.5    15.2        0.44
----------------------------------------------------------------------------
PIN14-03      RC        -90      109.8   57.9 - 62.5     4.6        0.38
----------------------------------------------------------------------------
PIN14-04      RC        -90      99.1    39.6 - 57.9    18.3        0.30
----------------------------------------------------------------------------
                                           122.0 -
PIN14-05      RC        -90      391.8      161.6       39.6        1.01
----------------------------------------------------------------------------
                                           172.3 -
                                            173.8        1.5        0.56
----------------------------------------------------------------------------
                                           231.7 -
                                            285.1       53.4        0.39
----------------------------------------------------------------------------
                                           301.8 -
                                            304.9        3.1        0.39
----------------------------------------------------------------------------
                                           326.2 -
                                            329.3        3.1        0.24
----------------------------------------------------------------------------
(ii) Gold intervals reported in this table were calculated using a 0.20 g
Au/t cutoff. Weighted averaging has been used to calculate all reported
intervals. True widths are estimated at 85% of drilled thicknesses.

In addition to the drilling, current activities at the Pinion Deposit include the collection and interpretation of gravity data, detailed and district scale geologic mapping, relogging historic RC drill cuttings and cross section interpretation.

Mac Jackson, Gold Standard's Vice President of Exploration stated, "Our first drill holes at Pinion demonstrate the presence of a strong oxidized gold system that is very continuous and widespread in the collapse breccia host at the top of the Devil's Gate Formation. The new, deeper potential recognized in PIN14-05 is one of the types of targets we expect to identify as we integrate the geology through relogging, mapping and gravity work. We are very excited by our Phase 1 drill results to date and the exploration potential we see emerging at Pinion."

Sampling Methodology, Chain of Custody, Quality Control and Quality Assurance:

All sampling was conducted under the supervision of the Company's project geologists and the chain of custody from the drill to the sample preparation facility was continuously monitored. Core was cut at the company's facility in Elko, NV and one half was sent to the lab for analysis and the other half retained in the original core box. A blank, quarter core duplicate or certified reference material was inserted approximately every tenth sample. The samples are delivered to ALS Minerals preparation facility in Elko, NV. The samples are crushed and pulverized and sample pulps are shipped to ALS Minerals certified laboratory in Vancouver. Pulps are digested and analyzed for gold using fire assay fusion and an atomic absorption spectroscopy (AAS) finish on a 30 gram split. All other elements are determined by ICP analysis. Data verification of the analytical results includes a statistical analysis of the duplicates, standards and blanks that must pass certain parameters for acceptance to insure accurate and verifiable results.

The scientific and technical content and interpretations contained in this news release have been reviewed, verified and approved by Steven R. Koehler, Gold Standard's Manager of Projects, BSc. Geology and CPG-10216, a Qualified Person as defined by NI 43-101, Standards of Disclosure for Mineral Projects.

ABOUT GOLD STANDARD VENTURES - Gold Standard is an advanced stage gold exploration company focused on district scale discoveries in Nevada. The Company's flagship project, the Railroad-Pinion Gold Project, is located within the prolific Carlin Trend. The recent Pinion gold deposit acquisition offers GSV a potential near-term development option and further consolidates the Company's 115km2 premier land package in the Carlin Trend. Gold Standard is moving towards building NI 43-101 compliant gold resources at both the near surface, oxide-gold Pinion deposit and the classic Carlin style, North Bullion gold deposit in 2014.

Neither the TSXV nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) nor the NYSE MKT accepts responsibility for the adequacy or accuracy of this news release.

CAUTIONARY NOTE REGARDING FORWARD-LOOKING STATEMENTS

This news release contains forward-looking statements, which relate to future events or future performance and reflect management's current expectations and assumptions. Such forward-looking statements reflect management's current beliefs and are based on assumptions made by and information currently available to the Company. All statements, other than statements of historical fact, included herein including, without limitation, statements about our proposed financing are forward looking statements. By their nature, forward-looking statements involve known and unknown risks, uncertainties and other factors which may cause our actual results, performance or achievements, or other future events, to be materially different from any future results, performance or achievements expressed or implied by such forward-looking statements. Risk factors affecting the Company include, among others: the results from our exploration programs, global financial conditions and volatility of capital markets, uncertainty regarding the availability of additional capital, fluctuations in commodity prices; title matters; and the additional risks identified in our filings with Canadian securities regulators on SEDAR in Canada (available at www.sedar.com) and with the SEC on EDGAR (available at www.sec.gov/edgar.shtml). These forward-looking statements are made as of the date hereof and, except as required under applicable securities legislation, the Company does not assume any obligation to update or revise them to reflect new events or circumstances.

On behalf of the Board of Directors of Gold Standard,

"Jonathan Awde"

Jonathan Awde, President and Director

Contacts:
Jonathan Awde
President
Tel: 604-669-5702
Email: [email protected]
Website: www.goldstandardv.com

More Stories By Marketwired .

Copyright © 2009 Marketwired. All rights reserved. All the news releases provided by Marketwired are copyrighted. Any forms of copying other than an individual user's personal reference without express written permission is prohibited. Further distribution of these materials is strictly forbidden, including but not limited to, posting, emailing, faxing, archiving in a public database, redistributing via a computer network or in a printed form.

Latest Stories
Enterprises have taken advantage of IoT to achieve important revenue and cost advantages. What is less apparent is how incumbent enterprises operating at scale have, following success with IoT, built analytic, operations management and software development capabilities – ranging from autonomous vehicles to manageable robotics installations. They have embraced these capabilities as if they were Silicon Valley startups. As a result, many firms employ new business models that place enormous impor...
SYS-CON Events announced today that TidalScale, a leading provider of systems and services, will exhibit at SYS-CON's 21st International Cloud Expo®, which will take place on Oct 31 - Nov 2, 2017, at the Santa Clara Convention Center in Santa Clara, CA. TidalScale has been involved in shaping the computing landscape. They've designed, developed and deployed some of the most important and successful systems and services in the history of the computing industry - internet, Ethernet, operating s...
When it comes to cloud computing, the ability to turn massive amounts of compute cores on and off on demand sounds attractive to IT staff, who need to manage peaks and valleys in user activity. With cloud bursting, the majority of the data can stay on premises while tapping into compute from public cloud providers, reducing risk and minimizing need to move large files. In his session at 18th Cloud Expo, Scott Jeschonek, Director of Product Management at Avere Systems, discussed the IT and busine...
Coca-Cola’s Google powered digital signage system lays the groundwork for a more valuable connection between Coke and its customers. Digital signs pair software with high-resolution displays so that a message can be changed instantly based on what the operator wants to communicate or sell. In their Day 3 Keynote at 21st Cloud Expo, Greg Chambers, Global Group Director, Digital Innovation, Coca-Cola, and Vidya Nagarajan, a Senior Product Manager at Google, will discuss how from store operations...
In his session at 21st Cloud Expo, James Henry, Co-CEO/CTO of Calgary Scientific Inc., will introduce you to the challenges, solutions and benefits of training AI systems to solve visual problems with an emphasis on improving AIs with continuous training in the field. He will explore applications in several industries and discuss technologies that allow the deployment of advanced visualization solutions to the cloud.
We all know that end users experience the Internet primarily with mobile devices. From an app development perspective, we know that successfully responding to the needs of mobile customers depends on rapid DevOps – failing fast, in short, until the right solution evolves in your customers' relationship to your business. Whether you’re decomposing an SOA monolith, or developing a new application cloud natively, it’s not a question of using microservices – not doing so will be a path to eventual b...
Nordstrom is transforming the way that they do business and the cloud is the key to enabling speed and hyper personalized customer experiences. In his session at 21st Cloud Expo, Ken Schow, VP of Engineering at Nordstrom, will discuss some of the key learnings and common pitfalls of large enterprises moving to the cloud. This includes strategies around choosing a cloud provider(s), architecture, and lessons learned. In addition, he’ll go over some of the best practices for structured team migrat...
As people view cloud as a preferred option to build IT systems, the size of the cloud-based system is getting bigger and more complex. As the system gets bigger, more people need to collaborate from design to management. As more people collaborate to create a bigger system, the need for a systematic approach to automate the process is required. Just as in software, cloud now needs DevOps. In this session, the audience can see how people can solve this issue with a visual model. Visual models ha...
SYS-CON Events announced today that Taica will exhibit at the Japan External Trade Organization (JETRO) Pavilion at SYS-CON's 21st International Cloud Expo®, which will take place on Oct 31 – Nov 2, 2017, at the Santa Clara Convention Center in Santa Clara, CA. Taica manufacturers Alpha-GEL brand silicone components and materials, which maintain outstanding performance over a wide temperature range -40C to +200C. For more information, visit http://www.taica.co.jp/english/.
SYS-CON Events announced today that MIRAI Inc. will exhibit at the Japan External Trade Organization (JETRO) Pavilion at SYS-CON's 21st International Cloud Expo®, which will take place on Oct 31 – Nov 2, 2017, at the Santa Clara Convention Center in Santa Clara, CA. MIRAI Inc. are IT consultants from the public sector whose mission is to solve social issues by technology and innovation and to create a meaningful future for people.
Recently, REAN Cloud built a digital concierge for a North Carolina hospital that had observed that most patient call button questions were repetitive. In addition, the paper-based process used to measure patient health metrics was laborious, not in real-time and sometimes error-prone. In their session at 21st Cloud Expo, Sean Finnerty, Executive Director, Practice Lead, Health Care & Life Science at REAN Cloud, and Dr. S.P.T. Krishnan, Principal Architect at REAN Cloud, will discuss how they bu...
As hybrid cloud becomes the de-facto standard mode of operation for most enterprises, new challenges arise on how to efficiently and economically share data across environments. In his session at 21st Cloud Expo, Dr. Allon Cohen, VP of Product at Elastifile, will explore new techniques and best practices that help enterprise IT benefit from the advantages of hybrid cloud environments by enabling data availability for both legacy enterprise and cloud-native mission critical applications. By rev...
Join IBM November 1 at 21st Cloud Expo at the Santa Clara Convention Center in Santa Clara, CA, and learn how IBM Watson can bring cognitive services and AI to intelligent, unmanned systems. Cognitive analysis impacts today’s systems with unparalleled ability that were previously available only to manned, back-end operations. Thanks to cloud processing, IBM Watson can bring cognitive services and AI to intelligent, unmanned systems. Imagine a robot vacuum that becomes your personal assistant tha...
The next XaaS is CICDaaS. Why? Because CICD saves developers a huge amount of time. CD is an especially great option for projects that require multiple and frequent contributions to be integrated. But… securing CICD best practices is an emerging, essential, yet little understood practice for DevOps teams and their Cloud Service Providers. The only way to get CICD to work in a highly secure environment takes collaboration, patience and persistence. Building CICD in the cloud requires rigorous ar...
SYS-CON Events announced today that Datera will exhibit at SYS-CON's 21st International Cloud Expo®, which will take place on Oct 31 – Nov 2, 2017, at the Santa Clara Convention Center in Santa Clara, CA. Datera offers a radically new approach to data management, where innovative software makes data infrastructure invisible, elastic and able to perform at the highest level. It eliminates hardware lock-in and gives IT organizations the choice to source x86 server nodes, with business model option...