Welcome!

News Feed Item

Minera IRL Receives Construction Permit to Build the Ollachea Gold Mine

LIMA, PERU -- (Marketwired) -- 06/30/14 -- Minera IRL Limited ("Minera IRL" or the "Company") (TSX:IRL)(AIM:MIRL)(BVLAC:MIRL), the Latin America gold mining company, is pleased to announce that the Peruvian Ministry of Mines and Energy has granted the Construction Permit to build the Ollachea Gold Mine. Following the approval of the Environmental and Social Impact Assessment in 2013, the Construction Permit was the final major government approval required to commence construction.

"We are delighted to have received approval of the Construction Permit for Ollachea and are looking forward to commencing development as soon as project financing is arranged, which we expect to conclude during the third quarter of 2014," said Courtney Chamberlain, Executive Chairman of Minera IRL.

"We wish to acknowledge the government authorities' outstanding attention to rapidly facilitating the permitting process," said Diego Benavides, President of Minera IRL S.A. "We also thank the Community of Ollachea, our true partners in the project, for their unwavering support."

The Ollachea Gold Project

The Ollachea orogenic gold deposit, located in southern Peru, was discovered by Minera IRL in late 2008 after acquiring the property from Rio Tinto in 2006. Since that time, the Company has completed more than 81,000 metres of surface diamond drilling in 208 holes, resulting in the delineation of significant gold mineral resources and reserves at Ollachea. The project has strong community support, as evidenced by a 30-year surface rights agreement.

In November 2012, the Company completed a Definitive Feasibility Study on the Minapampa deposit. The results of a subsequent optimization process were announced on 4 June 2014. These studies reported the details of a robust underground mining operation with Probable Mineral Reserves of 9.2 million tonnes grading 3.4 grams of gold per tonne of material ("g/t Au") containing 1.0 million ounces.

The Ollachea Gold Mine has scheduled production of 930,000 ounces over an initial nine-year mine life at an average site cash operating cost of $507 per ounce of gold produced.

The up-front capital cost is estimated at $177 million (including IGV, which is recoverable) with a total life-of-mine capital cost estimate of $220.0 million.

The table below indicates the key performance measures of the Ollachea Project utilizing a $1,300 per ounce gold price on a total project basis that is equity financed:


----------------------------------------------------------------------------
Parameter             Units                  Financial Results              
                              ----------------------------------------------
                                           2014 DFS Optimization            
                              ----------------------------------------------
                                Pre-tax                Post-tax             
----------------------------------------------------------------------------
Project cash flow       $M        492                    344                
----------------------------------------------------------------------------
NPV at 5% real          $M        326                    218                
----------------------------------------------------------------------------
NPV at 7% real          $M        277                    181                
----------------------------------------------------------------------------
NPV at 10% real         $M        217                    135                
----------------------------------------------------------------------------
IRR (real)              %         37.1                   28.2               
----------------------------------------------------------------------------
Payback               years       2.4                    3.1                
----------------------------------------------------------------------------
Notes:                                                                      
1. NPVs as at commencement of construction                                  
2. NPVs are based on mid-period discounting                                 
3. Before tax is before Special Mining Tax, Workers' Participation Profit of
8% and Income Taxes of 30%                                                  
4. Payback starts from the commencement of production                       
5. The financial results are on 100% Project basis and exclude the agreement
with the community for a 5% participation in Minera Kuri Kullu SA ("MKK") on
commencement of production and the $14.2 million remainder of the Second    
Additional Payment payable by MKK due to Rio Tinto in June 2016.            
6. Excludes the 1% gross smelter royalty granted to Macquarie Bank.         
7. Tax losses and capitalized expenditures available to offset taxes payable
include balances as of 31 December 2013 in the 2014 Update.                 
----------------------------------------------------------------------------

Exploration and resource infill drilling has defined Indicated Mineral Resources of 10.1 million tonnes grading 4.0 g/t Au containing 1.3 million ounces at a 2.0 g/t Au cut-off, plus Inferred Mineral Resources totalling 12.1 million tonnes grading 3.0 g/t Au containing 1.1 million ounces at a 2.0 g/t Au cut-off. Significant open-ended potential exists to increase mineral resources both along strike and at depth as evidenced by underground drilling results along the eastern extension of the Minapampa deposit (reported in the Press Release dated 2 April 2013).

Minera IRL Limited is a AIM, TSX and BVL listed precious metals mining, development and exploration company with operations in Latin America. Minera IRL is led by a management team with extensive operating experience in South America. In Peru, the Company operates the Corihuarmi Gold Mine and the advanced Ollachea Gold Project. The Company also has a 51% interest in the Don Nicolas joint venture in Argentina with CIMINAS. For more information, please visit www.minera-irl.com.

Qualified Persons

The preparation of the technical information contained herein was supervised by Courtney Chamberlain, Executive Chairman, BSc and MSc Metallurgical Engineering, a Fellow of the Australian Institute of Mining and Metallurgy (FAusIMM), who is recognized as a Qualified Person for the purposes of National Instrument 43-101, and who has reviewed and approved the technical information in this press release.

The preparation of geological and resource information contained herein was supervised by Donald McIver, VP Exploration of the Company, MSc Exploration and Economic Geology, a Fellow of the Australian Institute of Mining and Metallurgy (FAusIMM), as well as the Society of Economic Geologists (FSEG), who is recognized as a Qualified Person for the purposes of National Instrument 43-101, and who has reviewed and approved the resource information in this press release.

Non-IFRS Measures

"Site operating cash costs" and "total cash costs" are non-IFRS measures that do not have a standardized meaning prescribed by GAAP or IFRS and may not be comparable to other similarly titled measures of other gold mining companies.

"Site operating cash costs" include costs such as mining, processing and administration, but are exclusive of royalties, workers' profit participation cost, depreciation, amortization, reclamation, capital, development, exploration and other non-site costs (transport and refining of metals, and community and environmental). These costs are then divided by ounces produced to arrive at "site cash operating costs per ounce".

This measure may vary from one period to another due to operating efficiencies, waste-to-ore ratios, grade of ore processed and gold recovery rates in the period.

Management believes this information is useful to investors because this measure is considered to be a key indicator of a company's ability to generate operating earnings and cash flow from its mining operations. This data is furnished to provide additional information and is a non-GAAP and non-IFRS measure that does not have any standardized meaning prescribed by GAAP or IFRS. It should not be considered in isolation as a substitute for measures of performance prepared in accordance with IFRS, and is not necessarily indicative of operating costs presented under IFRS.

Contacts:
Minera IRL
Jeremy Link, Business Development
+1 (647) 692 5460

Canaccord Genuity Limited
(Nominated Adviser & Broker, London)
Neil Elliot
Emma Gabriel
+ 44 (0)20 7523 8000

finnCap (Co-broker, London)
Geoff Nash (Corporate Finance)
Matthew Robinson (Corporate Finance)
Elizabeth Johnson (Corporate Broking)
+ 44 (0)20 7600 1658

Buchanan (Financial PR, London)
Bobby Morse
Louise Mason
+44 (0)20 7466 5000

More Stories By Marketwired .

Copyright © 2009 Marketwired. All rights reserved. All the news releases provided by Marketwired are copyrighted. Any forms of copying other than an individual user's personal reference without express written permission is prohibited. Further distribution of these materials is strictly forbidden, including but not limited to, posting, emailing, faxing, archiving in a public database, redistributing via a computer network or in a printed form.

Latest Stories
SYS-CON Events announced today that AppNeta, the leader in performance insight for business-critical web applications, will exhibit and present at SYS-CON's @DevOpsSummit at Cloud Expo New York, which will take place on June 7-9, 2016, at the Javits Center in New York City, NY. AppNeta is the only application performance monitoring (APM) company to provide solutions for all applications – applications you develop internally, business-critical SaaS applications you use and the networks that deli...
The cloud market growth today is largely in public clouds. While there is a lot of spend in IT departments in virtualization, these aren’t yet translating into a true “cloud” experience within the enterprise. What is stopping the growth of the “private cloud” market? In his general session at 18th Cloud Expo, Nara Rajagopalan, CEO of Accelerite, will explore the challenges in deploying, managing, and getting adoption for a private cloud within an enterprise. What are the key differences betwee...
In his session at 18th Cloud Expo, Bruce Swann, Senior Product Marketing Manager at Adobe, will discuss how the Adobe Marketing Cloud can help marketers embrace opportunities for personalized, relevant and real-time customer engagement across offline (direct mail, point of sale, call center) and digital (email, website, SMS, mobile apps, social networks, connected objects). Bruce Swann has more than 15 years of experience working with digital marketing disciplines like web analytics, social med...
SYS-CON Events announced today that ContentMX, the marketing technology and services company with a singular mission to increase engagement and drive more conversations for enterprise, channel and SMB technology marketers, has been named “Sponsor & Exhibitor Lounge Sponsor” of SYS-CON's 18th Cloud Expo, which will take place on June 7-9, 2016, at the Javits Center in New York City, New York. “CloudExpo is a great opportunity to start a conversation with new prospects, but what happens after the...
WebRTC is bringing significant change to the communications landscape that will bridge the worlds of web and telephony, making the Internet the new standard for communications. Cloud9 took the road less traveled and used WebRTC to create a downloadable enterprise-grade communications platform that is changing the communication dynamic in the financial sector. In his session at @ThingsExpo, Leo Papadopoulos, CTO of Cloud9, will discuss the importance of WebRTC and how it enables companies to fo...
As machines are increasingly connected to the internet, it’s becoming easier to discover the numerous ways Industrial IoT (IIoT) is helping to shape the business world. This is exactly why we have decided to take a closer look at this pervasive movement and to examine the desire to connect more things! Now if you need a refresher on IIoT and how it is changing the world, take a moment and listen to Greg Gorbach with ARC Advisory Group. Gorbach believes, "IIoT will significantly change the worl...
SYS-CON Events announced today Object Management Group® has been named “Media Sponsor” of SYS-CON's 18th International Cloud Expo, which will take place on June 7–9, 2016, at the Javits Center in New York City, NY, and the 19th International Cloud Expo, which will take place on November 1–3, 2016, at the Santa Clara Convention Center in Santa Clara, CA.
SYS-CON Events announced today the Docker Meets Kubernetes – Intro into the Kubernetes World, being held June 9, 2016, in conjunction with 18th Cloud Expo | @ThingsExpo, at the Javits Center in New York, NY. Register for 'Docker Meets Kubernetes Workshop' Here! This workshop led by Sebastian Scheele, co-founder of Loodse, introduces participants to Kubernetes (container orchestration). Through a combination of instructor-led presentations, demonstrations, and hands-on labs, participants learn ...
The IoT is changing the way enterprises conduct business. In his session at @ThingsExpo, Eric Hoffman, Vice President at EastBanc Technologies, discuss how businesses can gain an edge over competitors by empowering consumers to take control through IoT. We'll cite examples such as a Washington, D.C.-based sports club that leveraged IoT and the cloud to develop a comprehensive booking system. He'll also highlight how IoT can revitalize and restore outdated business models, making them profitable...
The IoTs will challenge the status quo of how IT and development organizations operate. Or will it? Certainly the fog layer of IoT requires special insights about data ontology, security and transactional integrity. But the developmental challenges are the same: People, Process and Platform. In his session at @ThingsExpo, Craig Sproule, CEO of Metavine, will demonstrate how to move beyond today's coding paradigm and share the must-have mindsets for removing complexity from the development proc...
Customer experience has become a competitive differentiator for companies, and it’s imperative that brands seamlessly connect the customer journey across all platforms. With the continued explosion of IoT, join us for a look at how to build a winning digital foundation in the connected era – today and in the future. In his session at @ThingsExpo, Chris Nguyen, Group Product Marketing Manager at Adobe, will discuss how to successfully leverage mobile, rapidly deploy content, capture real-time d...
In his session at 18th Cloud Expo, Andrew Cole, Director of Solutions Engineering at Peak 10, will discuss how the newest technology advances are reducing the cost and complexity of traditional business continuity and disaster recovery solutions. Attendees will: Learn why having a full disaster recovery strategy is more important now than ever before Explore the key drivers of a successful disaster recovery solution Achieve measurable operational and business value from a disaster recovery ...
The cloud era has reached the stage where it is no longer a question of whether a company should migrate, but when. Enterprises have embraced the outsourcing of where their various applications are stored and who manages them, saving significant investment along the way. Plus, the cloud has become a defining competitive edge. Companies that fail to successfully adapt risk failure. The media, of course, continues to extol the virtues of the cloud, including how easy it is to get there. Migrating...
As organizations shift towards IT-as-a-service models, the need for managing and protecting data residing across physical, virtual, and now cloud environments grows with it. Commvault can ensure protection, access and E-Discovery of your data – whether in a private cloud, a Service Provider delivered public cloud, or a hybrid cloud environment – across the heterogeneous enterprise. In his general session at 18th Cloud Expo, Randy De Meno, Chief Technologist - Windows Products and Microsoft Part...
SYS-CON Events announced today that Hanu Software will exhibit at SYS-CON's 18th International Cloud Expo®, which will take place on June 7-9, 2016, at the Javits Center in New York City, NY. Leveraging best-in-class people, processes, and technologies, Hanu provides high-quality, high-value software development and business process outsourcing services to independent software vendors (ISVs) and enterprises.