Welcome!

News Feed Item

Paramount Gold and Silver Reports Positive New Resource Estimate for Its San Miguel Project, Mexico

Measured and indicated (M&I) gold resource ounces increase 76%; M&I silver resource ounces rise 44%; new model includes resources for prospective lower cost heap leach scenario in forthcoming PEA

WINNEMUCCA, NEVADA -- (Marketwired) -- 07/08/14 -- Paramount Gold and Silver Corp. (NYSE MKT:PZG)(TSX:PZG)(FRANKFURT:P6G)(WKN:A0HGKQ) ("Paramount") today released the results of a new resource estimate prepared by Mine Development Associates of Reno Nevada ("MDA") (www.mda.com) for Paramount's 100%-owned San Miguel Project in northern Mexico. The new resource model on which the estimate is based "represents a major step forward in the evolution of San Miguel from a raw exploration prospect to what is now a mature, high quality economic opportunity," said Paramount CEO Christopher Crupi.

In the new model, estimated global measured and indicated (M&I) contained ounces of gold increased a robust 76%, from 638,000 to 1,123,000. Estimated M&I contained ounces of silver rose 44%, from 53.6 million to 77.1 million. Inferred resources of gold and silver fell slightly as a portion of the inferred was converted to higher categories but the size of the total resource increased substantially. At a silver-to-gold ratio of 60, estimated M&I gold equivalent ounces total 2,408,000 at an estimated average gold equivalent grade of 1.71 g/T. For a detailed breakdown of tonnes and grade by category, please see the tables below.

The new resource estimate has incorporated the following:


--  Data from new core drilling completed within the resource areas since
    the last update. 
--  Geological re-modeling and re-estimation of the San Francisco bulk
    tonnage gold-silver deposit reflecting the recent success of heap leach
    metallurgical testing on this material. (See news release of May 27,
    2014). 
--  Review of resource classification parameters based on drill confirmation
    of the predictability of the resource model, which has enhanced
    confidence. 

The new estimate will be incorporated into an updated Preliminary Economic Assessment (PEA) expected next month, to be prepared by Metal Mining Consultants ("MMC") (www.metalminingconsultants.com) of Denver, Colorado. The first PEA for San Miguel was also completed by MMC and released on February 28, 2013. A PEA is a complete, integrated project design which estimates mining and processing methods and rates of production, capital and operating costs, cash flows at specified metal prices, rates of return, mine life and net present values at a proposed discount rate.

Resources at the high grade Don Ese underground deposit have increased substantially in the new estimate. Don Ese is located several hundred meters east of the Guadalupe deposit, which it closely resembles, and they probably sit within the same structure. Guadalupe is Coeur d'Alene's key development project at its neighboring Palmarejo mine complex.

The large, bulk-mineable San Francisco gold-silver deposit was re-modeled following successful metallurgical testing of its heap leach potential; measured plus indicated contained metal now stands at 126,000 ounces of gold and 3.4 million ounces of silver, plus a further 566,000 ounces of gold and 14.7 million ounces of silver in the inferred category. For a detailed breakdown of tonnes and grade by category, please see the tables below. The updated PEA is expected to include a heap leach component for San Francisco.

Crupi commented that the new resource model "represents a substantial achievement. We believe the quality of the San Miguel resource is now sufficient for a feasibility study and supports a strong, reliable valuation by potential partners. The next step is to revise the PEA from 2013 to include the larger resource and the heap leach scenario for lower grade material. We expect the results of this work to be highly encouraging for the project."

Detailed resource tables effective as at May 1, 2014 are as follows:


----------------------------------------------------------------------------
                Cut off                                                     
Area            Ageq g/t                                            Measured
                          ==================================================
                                Tonnes  Au g/T  Ag g/T     Au Oz       Ag Oz
============================================================================
Don Ese         90             599,000    2.88     254    55,000   4,898,000
La Union        25           1,175,000    2.08      18    78,000     691,000
San Miguel      25           3,271,000    1.11      66   117,000   6,933,000
San Antonio     25           1,209,000    0.04      60     1,000   2,319,000
San Francisco   9                    -       -       -         -           -
La Veronica     25                   -       -       -         -           -
MT/SC           25                   -       -       -         -           -
============================================================================
Total                        6,254,000    1.25      74   251,000  14,841,000
============================================================================
                                                                            
----------------------------------------------------------------------------
                Cut off                                                     
Area            Ageq g/t                                           Indicated
                          ==================================================
                                Tonnes  Au g/T  Ag g/T     Au Oz       Ag Oz
============================================================================
Don Ese         90           2,807,000    2.81     206   253,000  18,546,000
La Union        25           6,903,000    1.06      42   236,000   9,204,000
San Miguel      25           9,943,000    0.79      50   252,000  15,962,000
San Antonio     25           6,180,000    0.02      72     4,000  14,215,000
San Francisco   9           10,551,000    0.37      10   126,000   3,429,000
La Veronica     25             476,000    0.08      61     1,000     930,000
MT/SC           25                   -       -       -         -           -
============================================================================
Total                       36,860,000    0.74      53   872,000  62,286,000
============================================================================
                                                                            
----------------------------------------------------------------------------
                Cut off                                                     
Area            Ageq g/t                             Measured plus Indicated
                          ==================================================
                                Tonnes  Au g/T  Ag g/T     Au Oz       Ag Oz
============================================================================
Don Ese         90           3,406,000    2.82     214   308,000  23,444,000
La Union        25           8,078,000    1.21      38   314,000   9,895,000
San Miguel      25          13,214,000    0.87      54   369,000  22,895,000
San Antonio     25           7,389,000    0.02      70     5,000  16,534,000
San Francisco   9           10,551,000    0.37      10   126,000   3,429,000
La Veronica     25             476,000    0.08      61     1,000     930,000
MT/SC           25                   -       -       -         -           -
============================================================================
Total                       43,114,000    0.81      56 1,123,000  77,127,000
============================================================================
                                                                            
----------------------------------------------------------------------------
                Cut off                                                     
Area            Ageq g/t                                            Inferred
                          ==================================================
                                Tonnes  Au g/T  Ag g/T     Au Oz       Ag Oz
============================================================================
Don Ese         90           2,020,000    2.07     131   135,000   8,514,000
La Union        25           1,476,000    0.90      38    43,000   1,785,000
San Miguel      25           3,350,000    0.54      21    58,000   2,282,000
San Antonio     25           2,109,000    0.08      73     5,000   4,977,000
San Francisco   9           43,229,000    0.32       8   440,000  11,269,000
La Veronica     25           3,104,000    0.09      47     9,000   4,658,000
MT/SC           25           3,520,000    0.13      40    14,000   4,503,000
============================================================================
Total                       58,808,000    0.38      20   704,000  37,988,000
============================================================================

Key Parameters for Resource Estimation

The gold and silver resources at the San Miguel project were modeled and estimated by:


--  Determining statistical and geological criteria to establish gold and
    silver mineral domains; 
--  Interpreting gold and silver mineral-domain polygons on sets of vertical
    cross sections orientated perpendicular to the strike of the
    mineralization for each deposit area; 
--  Rectifying the mineral-domain interpretations for each deposit on a set
    of level plans; 
--  Analyzing the modeled mineralization geostatistically in order to aid in
    the selection of estimation and classification parameters; 
--  Interpolating grades into three-dimensional block models, using the gold
    and silver mineral- domains to control the estimations; and 
--  Undertaking various checks and interpolation iterations until optimal
    results were generated. 

Additionally, MDA estimated resources at higher cut-off grades, resulting in a substantial increase in the San Miguel resource grade without a significant reduction in total contained metal. The estimates based on higher cut-off grades are contained in the tables below. Potentially mineable grades will be established in the updated PEA.


----------------------------------------------------------------------------
Cutoff                              Measured & Indicated                    
(Ag Eq g/T)             Tonnes  g Ag/t         oz Ag    g Au/t         oz Au
============================================================================
25                  38,574,000      63    78,014,000      0.90     1,109,000
50                  21,119,000      97    66,355,000      1.43       974,100
75                  14,445,000     127    58,900,000      1.90       881,500
90                  12,167,000     142    55,420,000      2.15       839,300
120                  9,239,000     167    49,693,000      2.60       772,800
150                  7,443,000     189    45,216,000      3.00       717,300
============================================================================
                                                                            
----------------------------------------------------------------------------
Cutoff                                    Inferred                          
(g Ag-equiv/t)          Tonnes  g Ag/t         oz Ag    g Au/t         oz Au
============================================================================
25                  32,833,000      34    35,986,000      0.57       597,000
50                  13,628,000      58    25,317,000      0.95       419,000
75                   7,381,000      83    19,674,000      1.30       308,800
90                   5,224,000     102    17,162,000      1.52       256,200
120                  3,258,000     133    13,934,000      1.93       202,500
150                  2,342,000     156    11,761,000      2.28       171,800
============================================================================

NI 43-101 Disclosure

The resource estimation disclosure in this news release has been reviewed and approved by Michael Gustin of MDA, a Qualified Person under the auspices of NI 43-101. Exploration activities at San Miguel were conducted by Paramount Gold de Mexico S.A de C.V personnel under the supervision of Glen van Treek, Exploration Vice President of the Company and Bill Threlkeld, a Qualified Person as defined by National Instrument 43-101, who have both reviewed and approved this press release. An ongoing quality control/quality assurance protocol was employed for the program including blank, duplicate and reference standards in every batch of assays. Cross-check analyses were conducted at a second external laboratory on 10% of the samples. Samples were assayed at ALS Chemex and Acme Laboratories, Vancouver, B.C., using fire assay atomic absorption methods for gold and aqua regia digestion ICP methods for other elements.

About Paramount

Paramount is a U.S.-based exploration and development company with multi-million ounce advanced stage precious metals projects in northern Mexico (San Miguel) and Nevada (Sleeper). Fully-funded exploration and engineering programs are now in progress at these two core projects which are expected to generate substantial additional value for our shareholders.

The San Miguel Project consists of over 142,000 hectares (over 353,000 acres) in the Palmarejo District of northwest Mexico, making Paramount the largest claim holder in this rapidly growing precious metals mining camp. The San Miguel Project is ideally situated near established, low cost production where the infrastructure already exists for early, cost-effective exploitation. A PEA for San Miguel was completed and announced on February 28, 2013.

The Sleeper Gold Project is located off a main highway about 25 miles from the town of Winnemucca. In 2010, Paramount acquired a 100% interest in the project including the original Sleeper high-grade open pit mine operated by Amax Gold from 1986 to 1996 as well as staked and purchased lands now totaling 2,570 claims and covering about 47,500 acres which stretch south down trend to Newmont's Sandman project. This acquisition is consistent with the Company's strategy of district-scale exploration near infrastructure in established mining camps. A PEA was completed for Sleeper and announced on July 30, 2012.

Cautionary Note to U.S. Investors Concerning Estimates of Indicated and Inferred Resources

This news release uses the terms "measured and indicated resources" and "inferred resources". We advise U.S. investors that while these terms are defined in, and permitted by, Canadian regulations, these terms are not defined terms under SEC Industry Guide 7 and not normally permitted to be used in reports and registration statements filed with the SEC. "Inferred resources" have a great amount of uncertainty as to their existence, and great uncertainty as to their economic and legal feasibility. It cannot be assumed that all or any part of an inferred mineral resource will ever be upgraded to a higher category. Under Canadian rules, estimates of inferred mineral resources may not form the basis of a feasibility study or prefeasibility studies, except in rare cases. The SEC normally only permits issuers to report mineralization that does not constitute SEC Industry Guide 7 compliant "reserves", as in-place tonnage and grade without reference to unit measures. U.S. investors are cautioned not to assume that any part or all of mineral deposits in this category will ever be converted into reserves. U.S. investors are cautioned not to assume that any part or all of an inferred resource exists or is economically or legally minable.

Safe Harbor for Forward-Looking Statements:

This release and related documents may include "forward-looking statements" including, but not limited to, statements related to the interpretation of drilling results and potential mineralization, future exploration work at the San Miguel Project and the expected results of this work, estimates of resources including expected volumes and grades and the economic projections included in the project's PEA. Forward-looking statements are statements that are not historical fact and are subject to a variety of risks and uncertainties which could cause actual events to differ materially from those reflected in the forward-looking statements including fluctuations in the price of gold, inability to complete drill programs on time and on budget, and future financing ability. Paramount's future expectations, beliefs, goals, plans or prospects constitute forward-looking statements within the meaning of the United States Private Securities Litigation Reform Act of 1995 and other applicable securities laws. Words such as "believes," "plans," "anticipates," "expects," "estimates" and similar expressions should also be considered to be forward-looking statements. There are a number of important factors that could cause actual results or events to differ materially from those indicated by such forward-looking statements, including, but not limited to: uncertainties involving interpretation of drilling results, environmental matters, lack of ability to obtain required permitting, equipment breakdown or disruptions, and the other factors described in Paramount's Annual Report on Form 10-K for the year ended June 30, 2013 and its most recent quarterly reports filed with the SEC.

Except as required by applicable law, Paramount disclaims any intention or obligation to update any forward-looking statements as a result of developments occurring after the date of this document.

Contacts:
Paramount Gold and Silver Corp.
Glen Van Treek
VP Exploration
866-481-2233

Paramount Gold and Silver Corp.
Chris Theodossiou
Investor Relations
866-481-2233

More Stories By Marketwired .

Copyright © 2009 Marketwired. All rights reserved. All the news releases provided by Marketwired are copyrighted. Any forms of copying other than an individual user's personal reference without express written permission is prohibited. Further distribution of these materials is strictly forbidden, including but not limited to, posting, emailing, faxing, archiving in a public database, redistributing via a computer network or in a printed form.

Latest Stories
When you focus on a journey from up-close, you look at your own technical and cultural history and how you changed it for the benefit of the customer. This was our starting point: too many integration issues, 13 SWP days and very long cycles. It was evident that in this fast-paced industry we could no longer afford this reality. We needed something that would take us beyond reducing the development lifecycles, CI and Agile methodologies. We made a fundamental difference, even changed our culture...
Things are changing so quickly in IoT that it would take a wizard to predict which ecosystem will gain the most traction. In order for IoT to reach its potential, smart devices must be able to work together. Today, there are a slew of interoperability standards being promoted by big names to make this happen: HomeKit, Brillo and Alljoyn. In his session at @ThingsExpo, Adam Justice, vice president and general manager of Grid Connect, will review what happens when smart devices don’t work togethe...
"There's a growing demand from users for things to be faster. When you think about all the transactions or interactions users will have with your product and everything that is between those transactions and interactions - what drives us at Catchpoint Systems is the idea to measure that and to analyze it," explained Leo Vasiliou, Director of Web Performance Engineering at Catchpoint Systems, in this SYS-CON.tv interview at 18th Cloud Expo, held June 7-9, 2016, at the Javits Center in New York Ci...
The 20th International Cloud Expo has announced that its Call for Papers is open. Cloud Expo, to be held June 6-8, 2017, at the Javits Center in New York City, brings together Cloud Computing, Big Data, Internet of Things, DevOps, Containers, Microservices and WebRTC to one location. With cloud computing driving a higher percentage of enterprise IT budgets every year, it becomes increasingly important to plant your flag in this fast-expanding business opportunity. Submit your speaking proposal ...
@DevOpsSummit taking place June 6-8, 2017 at Javits Center, New York City, is co-located with the 20th International Cloud Expo and will feature technical sessions from a rock star conference faculty and the leading industry players in the world. @DevOpsSummit at Cloud Expo New York Call for Papers is now open.
SYS-CON Events announced today that Dataloop.IO, an innovator in cloud IT-monitoring whose products help organizations save time and money, has been named “Bronze Sponsor” of SYS-CON's 20th International Cloud Expo®, which will take place on June 6-8, 2017, at the Javits Center in New York City, NY. Dataloop.IO is an emerging software company on the cutting edge of major IT-infrastructure trends including cloud computing and microservices. The company, founded in the UK but now based in San Fran...
20th Cloud Expo, taking place June 6-8, 2017, at the Javits Center in New York City, NY, will feature technical sessions from a rock star conference faculty and the leading industry players in the world. Cloud computing is now being embraced by a majority of enterprises of all sizes. Yesterday's debate about public vs. private has transformed into the reality of hybrid cloud: a recent survey shows that 74% of enterprises have a hybrid cloud strategy.
In the next five to ten years, millions, if not billions of things will become smarter. This smartness goes beyond connected things in our homes like the fridge, thermostat and fancy lighting, and into heavily regulated industries including aerospace, pharmaceutical/medical devices and energy. “Smartness” will embed itself within individual products that are part of our daily lives. We will engage with smart products - learning from them, informing them, and communicating with them. Smart produc...
Internet of @ThingsExpo, taking place June 6-8, 2017 at the Javits Center in New York City, New York, is co-located with the 20th International Cloud Expo and will feature technical sessions from a rock star conference faculty and the leading industry players in the world. @ThingsExpo New York Call for Papers is now open.
SYS-CON Events announced today that Catchpoint, a leading digital experience intelligence company, has been named “Silver Sponsor” of SYS-CON's 20th International Cloud Expo®, which will take place on June 6-8, 2017, at the Javits Center in New York City, NY. Catchpoint Systems is a leading Digital Performance Analytics company that provides unparalleled insight into your customer-critical services to help you consistently deliver an amazing customer experience. Designed for digital business, C...
Providing the needed data for application development and testing is a huge headache for most organizations. The problems are often the same across companies - speed, quality, cost, and control. Provisioning data can take days or weeks, every time a refresh is required. Using dummy data leads to quality problems. Creating physical copies of large data sets and sending them to distributed teams of developers eats up expensive storage and bandwidth resources. And, all of these copies proliferating...
SYS-CON Events announced today that Catchpoint Systems, Inc., a provider of innovative web and infrastructure monitoring solutions, has been named “Silver Sponsor” of SYS-CON's DevOps Summit at 18th Cloud Expo New York, which will take place June 7-9, 2016, at the Javits Center in New York City, NY. Catchpoint is a leading Digital Performance Analytics company that provides unparalleled insight into customer-critical services to help consistently deliver an amazing customer experience. Designed ...
More and more brands have jumped on the IoT bandwagon. We have an excess of wearables – activity trackers, smartwatches, smart glasses and sneakers, and more that track seemingly endless datapoints. However, most consumers have no idea what “IoT” means. Creating more wearables that track data shouldn't be the aim of brands; delivering meaningful, tangible relevance to their users should be. We're in a period in which the IoT pendulum is still swinging. Initially, it swung toward "smart for smart...
“DevOps is really about the business. The business is under pressure today, competitively in the marketplace to respond to the expectations of the customer. The business is driving IT and the problem is that IT isn't responding fast enough," explained Mark Levy, Senior Product Marketing Manager at Serena Software, in this SYS-CON.tv interview at DevOps Summit, held Nov 4–6, 2014, at the Santa Clara Convention Center in Santa Clara, CA.
WebRTC sits at the intersection between VoIP and the Web. As such, it poses some interesting challenges for those developing services on top of it, but also for those who need to test and monitor these services. In his session at WebRTC Summit, Tsahi Levent-Levi, co-founder of testRTC, reviewed the various challenges posed by WebRTC when it comes to testing and monitoring and on ways to overcome them.