Welcome!

News Feed Item

Platinum Group Metals Files Report on Revised and Updated Mineral Resource Estimate for the Waterberg Joint Venture and Waterberg Extension Projects

VANCOUVER, BRITISH COLUMBIA -- (Marketwired) -- 07/25/14 -- Platinum Group Metals Ltd. (TSX: PTM)(NYSE MKT: PLG) ("Platinum Group" or the "Company") announces that further to its news release dated June 12, 2014 (the "Release") announcing an increase in the estimated Inferred Mineral Resource at the Waterberg Joint Venture and adjacent Waterberg Extension in South Africa, it has today filed the associated National Instrument 43-101 technical report. The report, entitled "Revised and Updated Mineral Resource Estimate for the Waterberg Joint Venture and Waterberg Extension Projects, South Africa (Latitude 23 degrees 22' 01"S, Longitude 28 degrees 49' 42"E)" is dated effective June 12, 2014 and was prepared by Kenneth Lomberg, B.Sc. (Hons) Geology, B. Com., M. Eng. Pr.Sci.Nat. and Alan Goldschmidt, Pr.Sci.Nat., of Coffey Mining (SA) Pty Ltd. supporting the disclosure of the updated inferred mineral resource estimate. The technical report is consistent in all material respects with the inferred mineral resource estimates announced in the Release. A copy of the report can be found at www.sedar.com and on the Company's website.

The previously announced total Inferred resource on the Waterberg Joint Venture and the Waterberg Extension in the "T" and "F" layers are estimated at 29 million ounces 4E, 287 million tonnes grading 3.15 g/t 4E (0.94 g/t Pt, 1.92 g/t Pd, 0.04 g/t Rh, 0.25 g/t Au, 30%, 61%, 1%, 8% respectively).

Exploration at the Waterberg Joint Venture and the Waterberg Extension continues with 24 drill rigs, focused on in-fill drilling with the objective of converting the majority of Waterberg Platinum deposit on the Waterberg Joint Venture to Indicated as well as expanding the open deposit.

Qualified Person, Quality Control and Assurance

The non-independent qualified person for this Press Release is R. Michael Jones P.Eng. He has relevant experience in precious metals and PGM evaluations and has verified the data by reviewing the detailed assay and geological information on the Waterberg deposit and visiting the site and core yard many times since 2011 including in June 2014.

Ken Lomberg of Coffey Mining South Africa Pty Ltd is the independent qualified person for the Mineral Resources on the Waterberg Deposit and he has reviewed the references to resources and ongoing work in this press release. It is planned that Coffey will prepare an update on the Mineral Resource for the prefeasibility study based on the current in-fill drilling.

About the Waterberg Joint Venture and Waterberg Extension

The Japan Oil, Gas and Metals National Corporation ("JOGMEC"), a state owned mining company from Japan, is an active participant in the Waterberg Joint Venture along with Platinum Group Metals Ltd. and South African empowerment partner Mnombo Wethu Consultants (Pty) Ltd. The Waterberg deposit was discovered in late 2011 by the joint venture partners and has grown dramatically over the past few years to be a globally significant deposit. The deposit is near surface and in an independently engineered PEA, a mine design for the Waterberg Joint Venture project area estimates 655,000 ounces of 3E production at steady state to be accessed by ramp declines, utilizing fully mechanized mining methods. See National Instrument 43-101 technical report at www.sedar.com entitled "Waterberg Mineral Project Preliminary Economic Assessment" filed March 13, 2014. (The economic analysis is based on Inferred Resources and is preliminary in nature. Inferred Resources are considered too speculative geologically to have economic considerations applied to them that would enable them to be categorized as Mineral Reserves. There is no certainty that the PEA will be realized).

The Waterberg Extension is owned 87% by Platinum Group Metals directly and indirectly and is located adjacent to the north of the Waterberg Joint Venture within a regional scale set of Prospecting Rights granted to the Company.

About Platinum Group Metals Ltd.

Platinum Group is based in Johannesburg, South Africa and Vancouver, Canada. The Company's business is currently focused on the construction of the WBJV Project 1 (Maseve) platinum mine and the exploration and initial engineering on the newly discovered Waterberg platinum deposit. The Waterberg discovery was made by the Company stemming from a successful scientific exploration focus in the Company's founding origins.

On behalf of the Board of Platinum Group Metals Ltd.

R. Michael Jones, President and CEO

Disclosure

The Toronto Stock Exchange and the NYSE MKT LLC have not reviewed and do not accept responsibility for the accuracy or adequacy of this news release, which has been prepared by management.

This press release contains forward-looking information within the meaning of Canadian securities laws and forward-looking statements within the meaning of U.S. securities laws ("forward-looking statements"). Forward-looking statements are typically identified by words such as: believe, expect, anticipate, intend, estimate, plans, postulate and similar expressions, or are those, which, by their nature, refer to future events. All statements that are not statements of historical fact are forward-looking statements. Forward-looking statements in this press release include, without limitation, statements regarding the completion of the WBJV Project 1 mine (Maseve), the Company's ability to secure further financing, the Company's plans with respect to future exploration at Waterberg, development and production on the Company's projects including mine construction at WBJV Project 1 mine (Maseve), and all technical details of the Waterberg PEA. Although the Company believes the forward-looking statements in this press release are reasonable, it can give no assurance that the expectations and assumptions in such statements will prove to be correct. The Company cautions investors that any forward-looking statements by the Company are not guarantees of future results or performance, and that actual results may differ materially from those in forward looking statements as a result of various factors, including, but not limited to, variations in market conditions; the nature, quality and quantity of any mineral deposits that may be located; metal prices; other prices and costs; currency exchange rates; the Company's ability to obtain any necessary permits, consents or authorizations required for its activities; the Company's ability to access further funding and produce minerals from its properties successfully or profitably, to continue its projected growth, or to be fully able to implement its business strategies and other risk factors described in the Company's Form 40-F annual report, annual information form and other filings with the SEC and Canadian securities regulators, which may be viewed at www.sec.gov and www.sedar.com, respectively.

Cautionary Note to U.S. Investors Regarding Estimates of Inferred Mineral Resources

The disclosure in this press release regarding mineral properties was prepared in accordance with Canadian National Instrument 43-101 ("NI 43-101"), which differ significantly from the mineral reserve disclosure requirements of the U.S. Securities and Exchange Commission ("SEC") set out in Industry Guide 7. Under NI 43-101, companies are permitted and required to disclose "mineral resources", which are not "reserves". U.S. companies subject to the disclosure requirements of the SEC are not normally permitted to disclose mineralization unless they constitute "reserves" by U.S. standards in documents filed with the SEC. Investors are specifically cautioned not to assume that any part or all of "measured mineral resources", "indicated mineral resources" or "inferred mineral resources" will ever be converted into SEC defined mineral reserves. "Inferred mineral resources" have a great amount of uncertainty as to their existence, and great uncertainty as to their economic and legal feasibility. It cannot be assumed that all or any part of an "inferred mineral resource" exist or will ever be upgraded to a higher category. Under Canadian rules, estimates of "inferred mineral resources" may not form the basis of a feasibility study or prefeasibility studies, except in rare cases. In addition, the definitions of "reserves" and related terms under NI 43-101 and the SEC's Industry Guide 7 differ significantly. Accordingly, any "reserves" disclosed in this press release may not constitute "reserves" under SEC standards. Under SEC standards, mineralization may not be classified as a "reserve" unless the determination has been made that the mineralization could be economically and legally produced or extracted at the time the reserve determination is made. Among other things, all necessary permits would be required to be in hand or issuance imminent in order to classify mineralized material as reserves under the SEC standards. Further, while NI 43-101 permits companies to disclose the economic projections contained in preliminary economic analyses and pre-feasibility studies, which are not based on "reserves", U.S. companies are not normally permitted to include such economic projections in their SEC filings prior to the establishment of reserves under SEC standards. For the above reasons, statements contained in this press release that describes mineral reserve and resource estimates or that describes the results of preliminary economic analyses or pre-feasibility studies are not comparable to similar information made public by U.S. companies subject to the reporting and disclosure requirements of the SEC.

Contacts:
Platinum Group Metals Ltd.
R. Michael Jones
President
(604) 899-5450 / Toll Free: (866) 899-5450

Platinum Group Metals Ltd.
Kris Begic
VP, Corporate Development
(604) 899-5450 / Toll Free: (866) 899-5450

More Stories By Marketwired .

Copyright © 2009 Marketwired. All rights reserved. All the news releases provided by Marketwired are copyrighted. Any forms of copying other than an individual user's personal reference without express written permission is prohibited. Further distribution of these materials is strictly forbidden, including but not limited to, posting, emailing, faxing, archiving in a public database, redistributing via a computer network or in a printed form.

Latest Stories
SYS-CON Events announced today that Enzu will exhibit at SYS-CON's 21st Int\ernational Cloud Expo®, which will take place October 31-November 2, 2017, at the Santa Clara Convention Center in Santa Clara, CA. Enzu’s mission is to be the leading provider of enterprise cloud solutions worldwide. Enzu enables online businesses to use its IT infrastructure to their competitive advantage. By offering a suite of proven hosting and management services, Enzu wants companies to focus on the core of their ...
You know you need the cloud, but you’re hesitant to simply dump everything at Amazon since you know that not all workloads are suitable for cloud. You know that you want the kind of ease of use and scalability that you get with public cloud, but your applications are architected in a way that makes the public cloud a non-starter. You’re looking at private cloud solutions based on hyperconverged infrastructure, but you’re concerned with the limits inherent in those technologies.
"Tintri focuses on the Ops side of the DevOps, which basically is pushing more and more of the accessibility of the infrastructure to the developers and trying to get behind the scenes," explained Dhiraj Sehgal of Tintri in this SYS-CON.tv interview at 20th Cloud Expo, held June 6-8, 2017, at the Javits Center in New York City, NY.
Both SaaS vendors and SaaS buyers are going “all-in” to hyperscale IaaS platforms such as AWS, which is disrupting the SaaS value proposition. Why should the enterprise SaaS consumer pay for the SaaS service if their data is resident in adjacent AWS S3 buckets? If both SaaS sellers and buyers are using the same cloud tools, automation and pay-per-transaction model offered by IaaS platforms, then why not host the “shrink-wrapped” software in the customers’ cloud? Further, serverless computing, cl...
You know you need the cloud, but you’re hesitant to simply dump everything at Amazon since you know that not all workloads are suitable for cloud. You know that you want the kind of ease of use and scalability that you get with public cloud, but your applications are architected in a way that makes the public cloud a non-starter. You’re looking at private cloud solutions based on hyperconverged infrastructure, but you’re concerned with the limits inherent in those technologies.
Automation is enabling enterprises to design, deploy, and manage more complex, hybrid cloud environments. Yet the people who manage these environments must be trained in and understanding these environments better than ever before. A new era of analytics and cognitive computing is adding intelligence, but also more complexity, to these cloud environments. How smart is your cloud? How smart should it be? In this power panel at 20th Cloud Expo, moderated by Conference Chair Roger Strukhoff, paneli...
In his session at @ThingsExpo, Eric Lachapelle, CEO of the Professional Evaluation and Certification Board (PECB), provided an overview of various initiatives to certify the security of connected devices and future trends in ensuring public trust of IoT. Eric Lachapelle is the Chief Executive Officer of the Professional Evaluation and Certification Board (PECB), an international certification body. His role is to help companies and individuals to achieve professional, accredited and worldwide re...
Today we can collect lots and lots of performance data. We build beautiful dashboards and even have fancy query languages to access and transform the data. Still performance data is a secret language only a couple of people understand. The more business becomes digital the more stakeholders are interested in this data including how it relates to business. Some of these people have never used a monitoring tool before. They have a question on their mind like “How is my application doing” but no id...
IoT solutions exploit operational data generated by Internet-connected smart “things” for the purpose of gaining operational insight and producing “better outcomes” (for example, create new business models, eliminate unscheduled maintenance, etc.). The explosive proliferation of IoT solutions will result in an exponential growth in the volume of IoT data, precipitating significant Information Governance issues: who owns the IoT data, what are the rights/duties of IoT solutions adopters towards t...
It is ironic, but perhaps not unexpected, that many organizations who want the benefits of using an Agile approach to deliver software use a waterfall approach to adopting Agile practices: they form plans, they set milestones, and they measure progress by how many teams they have engaged. Old habits die hard, but like most waterfall software projects, most waterfall-style Agile adoption efforts fail to produce the results desired. The problem is that to get the results they want, they have to ch...
With the introduction of IoT and Smart Living in every aspect of our lives, one question has become relevant: What are the security implications? To answer this, first we have to look and explore the security models of the technologies that IoT is founded upon. In his session at @ThingsExpo, Nevi Kaja, a Research Engineer at Ford Motor Company, discussed some of the security challenges of the IoT infrastructure and related how these aspects impact Smart Living. The material was delivered interac...
The current age of digital transformation means that IT organizations must adapt their toolset to cover all digital experiences, beyond just the end users’. Today’s businesses can no longer focus solely on the digital interactions they manage with employees or customers; they must now contend with non-traditional factors. Whether it's the power of brand to make or break a company, the need to monitor across all locations 24/7, or the ability to proactively resolve issues, companies must adapt to...
Wooed by the promise of faster innovation, lower TCO, and greater agility, businesses of every shape and size have embraced the cloud at every layer of the IT stack – from apps to file sharing to infrastructure. The typical organization currently uses more than a dozen sanctioned cloud apps and will shift more than half of all workloads to the cloud by 2018. Such cloud investments have delivered measurable benefits. But they’ve also resulted in some unintended side-effects: complexity and risk. ...
With major technology companies and startups seriously embracing Cloud strategies, now is the perfect time to attend 21st Cloud Expo October 31 - November 2, 2017, at the Santa Clara Convention Center, CA, and June 12-14, 2018, at the Javits Center in New York City, NY, and learn what is going on, contribute to the discussions, and ensure that your enterprise is on the right path to Digital Transformation.
In 2014, Amazon announced a new form of compute called Lambda. We didn't know it at the time, but this represented a fundamental shift in what we expect from cloud computing. Now, all of the major cloud computing vendors want to take part in this disruptive technology. In his session at 20th Cloud Expo, Doug Vanderweide, an instructor at Linux Academy, discussed why major players like AWS, Microsoft Azure, IBM Bluemix, and Google Cloud Platform are all trying to sidestep VMs and containers wit...