Welcome!

News Feed Item

Mason Graphite Reports High Grade Intercepts in North-East Extension of Lac Gueret; One Hole Intersected 98m at 29.8% Cg Near Surface, Including 56m at 36.2% Cg

MONTREAL, QUEBEC -- (Marketwired) -- 07/29/14 -- Mason Graphite Inc. ("Mason Graphite" or the "Company") (TSX VENTURE: LLG)(OTCQX: MGPHF) is pleased to report positive assay results from the 2013-2014 drilling program at its Lac Gueret project in northeastern Quebec. The drill program consisted of 97 holes totaling 15,108 metres and was designed to pursue three objectives:


--  to explore for mineral extensions to the North-East and beyond the
    defined resource envelope of the GC Zone (18 holes totaling 2,085
    metres);

--  to explore for mineral continuity within the defined resource envelope
    of the GC Zone (68 holes totaling 11,323 metres); and

--  to conduct exploration drilling on graphite showings on the property
    outside the areas where drilling was conducted in the past (11 holes
    totaling 1,700 metres).

This press release reports assay results from drilling conducted in the North-East extension; the remaining drilling results from other areas noted above will be reported in upcoming communications.

Results Confirm Continuity of N-E Extension in GC Zone

Intercept highlights from the assay results in the North-East extension of the GC Zone, include:


--  Hole LG-459 intersected 73 metres at 28.5% Cg close to surface (9
    metres), including 41 metres at 39.0% Cg;

--  Hole LG-469 intersected 86 metres at 27.8% Cg, including 31 metres at
    42.3% Cg;

--  Hole LG-472 intersected 70 metres at 28.8% Cg close to surface (4
    metres), including 25 metres at 42.0% Cg;

--  Hole LG-489 intersected 66 metres at 30.0% Cg close to surface (4
    metres), including 46 metres at 38.3% Cg;

--  Hole LG-491 intersected 98 metres at 29.8% Cg close to surface (4
    metres), including 56 metres at 36.2% Cg.

"We are very encouraged with the results from the North-East extension. This exploration target is located at the edge of the defined mineral resource, and adjacent to the pit design from the preliminary economic assessment we completed in April 2013. These results confirm mineralization near surface with excellent widths and mineral continuity beyond the current mineral resource boundary." said Benoit Gascon, President and CEO of Mason Graphite.

Table 1 - Most relevant drill results from the NE Extension (18 holes totaling approximately 2,085 metres)



----------------------------------------------------------------------------
----------------------------------------------------------------------------
Section         Drill hole #  From (m)    To (m)    Length(1)(m)        % Cg
----------------------------------------------------------------------------
----------------------------------------------------------------------------
1350                  LG-460         4        41              37        34.0
                            ------------------------------------------------
                       incl.         4        32              28        39.8
            ----------------------------------------------------------------
                      LG-468          No significant mineralization
            ----------------------------------------------------------------
                      LG-469        44       130              86        27.8
                            ------------------------------------------------
                       incl.        54        85              31        42.3
                            ------------------------------------------------
                       incl.       105       130              25        30.1
            ----------------------------------------------------------------
                      LG-488       108       124              16        14.3
                            ------------------------------------------------
                                   129       140              11        21.0
            ----------------------------------------------------------------
                      LG-489         4        70              66        30.0
                            ------------------------------------------------
                       incl.         6        52              46        38.3
                            ------------------------------------------------
                                    89       106              17        17.2
----------------------------------------------------------------------------
1400                  LG-459         9        82              73        28.5
                            ------------------------------------------------
                       incl.         9        50              41        39.0
            ----------------------------------------------------------------
                      LG-466        33       117              84        27.4
                            ------------------------------------------------
                       incl.        57        93              36        36.1
            ----------------------------------------------------------------
                      LG-473        56        77              21        13.8
            ----------------------------------------------------------------
                      LG-477         6        43              37         8.2
                            ------------------------------------------------
                                    49        96              47        20.2
                            ------------------------------------------------
                       incl.        69        90              21        31.7
            ----------------------------------------------------------------
                      LG-490       109       127              18        12.8
            ----------------------------------------------------------------
                      LG-491         4       102              98        29.8
                            ------------------------------------------------
                       incl.        11        67              56        36.2
----------------------------------------------------------------------------
1450                  LG-456        11        74              63        20.1
            ----------------------------------------------------------------
                      LG-472         4        74              70        28.8
                            ------------------------------------------------
                       incl.        27        72              45        38.9
                            ------------------------------------------------
                       incl.        27        52              25        42.0
            ----------------------------------------------------------------
                      LG-478         4        63              59        18.8
                            ------------------------------------------------
                       incl.         4        41              37        23.8
----------------------------------------------------------------------------
1500                  LG-462        48        55               7        16.7
            ----------------------------------------------------------------
                      LG-479          No significant mineralization
            ----------------------------------------------------------------
                      LG-492          No significant mineralization
            ----------------------------------------------------------------
                      LG-493         4        44              40        13.8
----------------------------------------------------------------------------
----------------------------------------------------------------------------

Notes:


1.  Lengths are measured drill intervals - the true thicknesses are not
    known at this stage;
2.  Length figures are rounded to nearest integer for clarity.

Figure 1 - Lac Gueret project map with drill hole locations is available at this address: http://media3.marketwire.com/docs/959898e_Fig1.pdf

Operational Update and Upcoming Milestones

Mason Graphite has retained the services of Roche Ltee for the calculation of an updated mineral resource estimate including the results from the 2013/2014 drilling program. The updated block model will be used as an input for the upcoming feasibility study for the Lac Gueret project.

Also, in preparation for the upcoming feasibility study, the Company has been working with the metallurgical laboratories, COREM (Quebec City) and URSTM (Rouyn-Noranda), as well as consulting firm Soutex Inc. (Quebec City) for the optimization of the concentration process. A mandate was also awarded to Montreal-based consulting firm Hatch, to conduct trade-off studies and peripheral studies (hydro-geological and geotechnical) required for the development of the feasibility study.

A 100-ton bulk sample was collected at the Lac Gueret property in early July for the upcoming pilot plant test program, which is scheduled to commence this fall in conjunction with the feasibility study.

About Mason Graphite

Mason Graphite is a Canadian mining company focused on the exploration and development of its 100% owned Lac Gueret graphite property, located in northeastern Quebec. The property hosts a National Instrument 43-101 compliant Mineral Resource featuring 50,024,000 tonnes grading 15.6% Cg, including 6,672,000 tonnes grading 32.4% Cg, in the Measured and Indicated categories and 11,861,000 tonnes grading 17.1% Cg, including 2,637,000 tonnes grading 30.5% Cg, in the Inferred category (see press release dated December 5, 2013). Excellent potential exists for further mineral growth. A Preliminary Economic Assessment study was completed on a 7.6Mt mineral resource estimate from July 2012 which features 22 years of production at 27.4% Cg and a pre-tax internal rate of return of 33.7% (see technical report entitled "Technical Report on the Mineral Resources Estimation Update 2013, Lac Gueret Graphite Project, Quebec, Canada" issued on January 17, 2014). The Company's senior management team possesses significant graphite expertise from their experience at Timcal/Imerys, including Benoit Gascon, CPA, CA, who held executive positions for 20 years, including over 6 years as President and CEO; Jean L'Heureux, Eng., Executive Vice-President, Process Development, with over 20 years of experience; and Luc Veilleux, CPA, CA, Chief Financial Officer and Executive Vice-President, with 8 years of experience. Timcal, now owned by Imerys, is one of the largest graphite producers in the world.

Qualified Persons / Quality Control and Assurance

Yves Caron, P. Geo., Mason Graphite's Director of Exploration and Geology and a Qualified Person as defined by National Instrument 43-101, supervised the drill program and has reviewed and approved geological, scientific and technical content of this press release.

Jean L'Heureux, Eng., Mason Graphite's Executive Vice-President Process Development and a Qualified Person as defined by National Instrument 43-101, has reviewed and approved the metallurgical, scientific and technical content of this press release.

Analyses for this drilling campaign were carried out by AGAT Laboratories Ltd. in Mississauga, Ontario, a company independent from Mason Graphite and ISO 17025 certified. A thorough Quality Control and Assurance program (QA/QC) was exercised, with Mason Graphite inserting one blank, one standards and one duplicate every 50 samples. Carbon as graphite ("Cg") assays reported in this press release were obtained by using a LECO instrument following analytical technique ASTM E1915-07A with a detection limit of 0.01% Cg. Drill holes were sampled over an average of 1.5 metre intervals.

Stay Connected:

Twitter: @MasonGraphite

Facebook: /MasonGraphite

For more information about Mason Graphite, visit www.masongraphite.com.

Cautionary Statements

This press release contains "forward-looking information" within the meaning of Canadian securities legislation. All information contained herein that is not clearly historical in nature may constitute forward-looking information. Generally, such forward-looking information can be identified by the use of forward-looking terminology such as "plans", "expects" or "does not expect", "is expected", "budget", "scheduled", "estimates", "forecasts", "intends", "anticipates" or "does not anticipate", or "believes", or variations of such words and phrases or state that certain actions, events or results "may", "could", "would", "might" or "will be taken", "occur" or "be achieved". Forward-looking information is subject to known and unknown risks, uncertainties and other factors that may cause the actual results, level of activity, performance or achievements of the Company to be materially different from those expressed or implied by such forward-looking information, including but not limited to: (i) volatile stock price; (ii) the general global markets and economic conditions; (iii) the possibility of write-downs and impairments; (iv) the risk associated with exploration, development and operations of mineral deposits; (v) the risk associated with establishing title to mineral properties and assets; (vi) the risks associated with entering into joint ventures; (vii) fluctuations in commodity prices; (viii) the risks associated with uninsurable risks arising during the course of exploration, development and production; (ix) competition faced by the resulting issuer in securing experienced personnel and financing; (x) access to adequate infrastructure to support mining, processing, development and exploration activities; (xi) the risks associated with changes in the mining regulatory regime governing the resulting issuer; (xii) the risks associated with the various environmental regulations the resulting issuer is subject to; (xiii) risks related to regulatory and permitting delays; (xiv) risks related to potential conflicts of interest; (xv) the reliance on key personnel; (xvi) liquidity risks; (xvii) the risk of potential dilution through the issue of common shares; (xviii) the Company does not anticipate declaring dividends in the near term; (xix) the risk of litigation; and (xx) risk management.

Forward-looking information is based on assumptions management believes to be reasonable at the time such statements are made, including but not limited to, continued exploration activities, no material adverse change in metal prices, exploration and development plans proceeding in accordance with plans and such plans achieving their stated expected outcomes, receipt of required regulatory approvals, and such other assumptions and factors as set out herein. Although the Company has attempted to identify important factors that could cause actual results to differ materially from those contained in the forward-looking information, there may be other factors that cause results not to be as anticipated, estimated or intended. There can be no assurance that such forward-looking information will prove to be accurate, as actual results and future events could differ materially from those anticipated in such forward-looking information. Such forward-looking information has been provided for the purpose of assisting investors in understanding the Company's business, operations and exploration plans and may not be appropriate for other purposes. Accordingly, readers should not place undue reliance on forward-looking information. Forward-looking information is made as of the date of this press release, and the Company does not undertake to update such forward-looking information except in accordance with applicable securities laws.

Mineral resources that are not mineral reserves do not have demonstrated economic viability. The estimate of mineral resources may be materially affected by environmental, permitting, legal, title, taxation, sociopolitical, marketing, or other relevant issues.

The quantity and grade of reported inferred mineral resources in this news release are uncertain in nature and there has been insufficient exploration to define these inferred mineral resources as indicated or measured mineral resources and it is uncertain if further exploration will result in upgrading them to indicated or measured mineral resources.

The PEA is preliminary in nature and includes Inferred Mineral Resources, which are considered too geologically speculative to have mining and economic considerations applied to them that would enable them to be categorized as mineral reserves. Mineral resources that are not mineral reserves do not have demonstrated economic viability. There is no certainty that the reserves development, production, and economic forecasts on which the PEA is based will be realized.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

More Stories By Marketwired .

Copyright © 2009 Marketwired. All rights reserved. All the news releases provided by Marketwired are copyrighted. Any forms of copying other than an individual user's personal reference without express written permission is prohibited. Further distribution of these materials is strictly forbidden, including but not limited to, posting, emailing, faxing, archiving in a public database, redistributing via a computer network or in a printed form.

Latest Stories
Aspose.Total for .NET is the most complete package of all file format APIs for .NET as offered by Aspose. It empowers developers to create, edit, render, print and convert between a wide range of popular document formats within any .NET, C#, ASP.NET and VB.NET applications. Aspose compiles all .NET APIs on a daily basis to ensure that it contains the most up to date versions of each of Aspose .NET APIs. If a new .NET API or a new version of existing APIs is released during the subscription peri...
Security, data privacy, reliability, and regulatory compliance are critical factors when evaluating whether to move business applications from in-house, client-hosted environments to a cloud platform. Quality assurance plays a vital role in ensuring that the appropriate level of risk assessment, verification, and validation takes place to ensure business continuity during the migration to a new cloud platform.
SYS-CON Events announced today that 910Telecom will exhibit at the 19th International Cloud Expo, which will take place on November 1–3, 2016, at the Santa Clara Convention Center in Santa Clara, CA. Housed in the classic Denver Gas & Electric Building, 910 15th St., 910Telecom is a carrier-neutral telecom hotel located in the heart of Denver. Adjacent to CenturyLink, AT&T, and Denver Main, 910Telecom offers connectivity to all major carriers, Internet service providers, Internet backbones and ...
Ovum, a leading technology analyst firm, has published an in-depth report, Ovum Decision Matrix: Selecting a DevOps Release Management Solution, 2016–17. The report focuses on the automation aspects of DevOps, Release Management and compares solutions from the leading vendors.
Continuous testing helps bridge the gap between developing quickly and maintaining high quality products. But to implement continuous testing, CTOs must take a strategic approach to building a testing infrastructure and toolset that empowers their team to move fast. Download our guide to laying the groundwork for a scalable continuous testing strategy.
Adding public cloud resources to an existing application can be a daunting process. The tools that you currently use to manage the software and hardware outside the cloud aren’t always the best tools to efficiently grow into the cloud. All of the major configuration management tools have cloud orchestration plugins that can be leveraged, but there are also cloud-native tools that can dramatically improve the efficiency of managing your application lifecycle. In his session at 18th Cloud Expo, ...
SYS-CON Events announced today that LeaseWeb USA, a cloud Infrastructure-as-a-Service (IaaS) provider, will exhibit at the 19th International Cloud Expo, which will take place on November 1–3, 2016, at the Santa Clara Convention Center in Santa Clara, CA. LeaseWeb is one of the world's largest hosting brands. The company helps customers define, develop and deploy IT infrastructure tailored to their exact business needs, by combining various kinds cloud solutions.
StackIQ has announced the release of Stacki 3.2. Stacki is an easy-to-use Linux server provisioning tool. Stacki 3.2 delivers new capabilities that simplify the automation and integration of site-specific requirements. StackIQ is the commercial entity behind this open source bare metal provisioning tool. Since the release of Stacki in June of 2015, the Stacki core team has been focused on making the Community Edition meet the needs of members of the community, adding features and value, while ...
Qosmos has announced new milestones in the detection of encrypted traffic and in protocol signature coverage. Qosmos latest software can accurately classify traffic encrypted with SSL/TLS (e.g., Google, Facebook, WhatsApp), P2P traffic (e.g., BitTorrent, MuTorrent, Vuze), and Skype, while preserving the privacy of communication content. These new classification techniques mean that traffic optimization, policy enforcement, and user experience are largely unaffected by encryption. In respect wit...
For basic one-to-one voice or video calling solutions, WebRTC has proven to be a very powerful technology. Although WebRTC’s core functionality is to provide secure, real-time p2p media streaming, leveraging native platform features and server-side components brings up new communication capabilities for web and native mobile applications, allowing for advanced multi-user use cases such as video broadcasting, conferencing, and media recording.
SYS-CON Events announced today the Kubernetes and Google Container Engine Workshop, being held November 3, 2016, in conjunction with @DevOpsSummit at 19th Cloud Expo at the Santa Clara Convention Center in Santa Clara, CA. This workshop led by Sebastian Scheele introduces participants to Kubernetes and Google Container Engine (GKE). Through a combination of instructor-led presentations, demonstrations, and hands-on labs, students learn the key concepts and practices for deploying and maintainin...
SYS-CON Events announced today that Venafi, the Immune System for the Internet™ and the leading provider of Next Generation Trust Protection, will exhibit at @DevOpsSummit at 19th International Cloud Expo, which will take place on November 1–3, 2016, at the Santa Clara Convention Center in Santa Clara, CA. Venafi is the Immune System for the Internet™ that protects the foundation of all cybersecurity – cryptographic keys and digital certificates – so they can’t be misused by bad guys in attacks...
ReadyTalk has expanded the capabilities of the FoxDen collaboration platform announced late last year to include FoxDen Connect, an in-room video collaboration experience that launches with a single touch. With FoxDen Connect, users can now not only engage in HD video conferencing between iOS and Android mobile devices or Chrome browsers, but also set up in-person meeting rooms for video interactions. A host’s mobile device automatically recognizes the presence of a meeting room via beacon tech...
The cloud market growth today is largely in public clouds. While there is a lot of spend in IT departments in virtualization, these aren’t yet translating into a true “cloud” experience within the enterprise. What is stopping the growth of the “private cloud” market? In his general session at 18th Cloud Expo, Nara Rajagopalan, CEO of Accelerite, explored the challenges in deploying, managing, and getting adoption for a private cloud within an enterprise. What are the key differences between wh...
Deploying applications in hybrid cloud environments is hard work. Your team spends most of the time maintaining your infrastructure, configuring dev/test and production environments, and deploying applications across environments – which can be both time consuming and error prone. But what if you could automate provisioning and deployment to deliver error free environments faster? What could you do with your free time?