Click here to close now.



Welcome!

News Feed Item

Golden Star has Continued Exploration Drilling Success at Wassa

TORONTO, ONTARIO -- (Marketwired) -- 07/30/14 -- Golden Star (NYSE MKT: GSS)(TSX: GSC)(GHANA: GSR) today provides an update on exploration activities at its Wassa gold mine in Ghana.

Drilling widths in this press release are estimated true widths in meters ("m") and grades are grams of gold per tonne ("g/t Au").


--  12 holes drilled over 6,615 meters.
--  Step out drilling continues to delineate wide zones of high grade gold
    mineralization, last drill fence intersected:
    --  BSDD315M - 60.2 m grading 3.4 g/t from 490.1m
    --  BSDD315M - 70.5 m grading 5.9 g/t from 742.4 m
    --  BSDD315M - 16.9 m grading 4.4 g/t from 823.0 m
    --  BSDD315M - 9.4 m grading 4.3 g/t from 855.7 m
--  Infill and directional drilling continues to confirm high grade zones
    between existing drill holes
    --  BSDD290BD1 - 45.4 m grading 8.3 g/t
    --  BSDD318 - 15.8 m grading 32.9 g/t
    --  BSDD322 - 51.3 m grading 7.2 g/t
--  All drill results will be included in the Mineral Resource update due
    this quarter along with the Wassa Underground PEA
--  Confirmation and infill drilling ongoing with results to be included in
    a Feasibility Study pending completion of a positive PEA

Sam Coetzer, President and CEO of Golden Star commented:

"Drilling results received this quarter continue to demonstrate the robust nature of the high grade target at Wassa. The combination of the infill drilling proving up the wider zones of high grade beneath the current Wassa open pit and the success of the step out drilling, which remains open to the south, has shown that this deposit has significant untapped potential. These drilling results will be used to update the PEA which the company has already initiated and will be released to the market this quarter."

The Wassa gold mine is in the Western Region of Ghana. It has a carbon-in-leach processing plant with a rated capacity of 2.7 million tonnes per annum. Mining is at one large operating pit, the Wassa Main pit, which is within 500m of the plant.

Drilling below the Wassa Main pit has been ongoing since late 2011. This drilling has been successful in increasing the Wassa life of mine from two years to approximately eleven years.

The current drilling program at Wassa is focused on two goals - approximately 20,000 m of infill drilling of the current resource to further define grades and continuity and step out drilling on 200 meter drill fences to the south to determine the extension of the high grade mineralization below the current Wassa Main pit design.

As at the end of the second quarter 2014, the first phase of infill drilling over 15,400 m has been completed.

Step out Drilling

The step out drill fences have been successful in proving down plunge continuity of the high grade mineralized shoot. The high grade gold mineralization has been delineated over a total strike extent of approximately 1,000 meters extending from beneath the current pits to the last step out drill fence on 19100 to the south where it remains open down plunge. The Company is currently focusing on the completion of the Wassa underground PEA and upon the positive outcome of this study will look at resuming the step out drilling programs.

Step out holes were drilled and assay results received this quarter. Hole BSDD315M which is drilled on section 19100 north intersected several wide zones of significant mineralization including 70 meters grading 5.9 g/t. This wide zone of mineralization was intersected at depth from 742.4 meters and could be a second parallel high grade zone. The possibility that this is a second high grade zone creates additional drilling targets both up and down plunge where deep drilling has not yet been conducted.

Directional drilling on cross section 19500 north was conducted to delineate a 19 meter zone of mineralization which graded 6.9 g/t in BSDD290B. The directional hole BSDD290BD1 targeted the extension of the high grade zone approximately 25 meters up dip. The hole was successful and intersected a wider higher grade zone approximately 30 meters up dip with an estimated true width of 45.4 meters grading 8.3 g/t. The wider zone of higher grade is thought to be associated with the hinge zone of earlier folds, essentially doubling up the thickness of the limbs.

Infill Drilling

The infill drilling results along the strike of the underground target beneath the current Wassa Main pit have demonstrated the continuity of this zone along the plunge of the high grade mineralization. The higher drilling density in the area beneath the current pits has given the company confidence in the continuity of the wider higher grade zones, which in turn adds confidence to the step out drill holes drilled down plunge 400 meters to the south.

The infill drilling programs beneath the current open pit at Wassa continued to return significant widths and grades along the entire strike of the underground target. At the northern end of the zone, BSDD324 was drilled 40 meters down dip of a 32.4 meter zone that graded 3.5 g/t. BSDD324 intersected a 28 meter width that graded 6.9 g/t. Three hundred and twenty five meters south of this, hole BSDD322 intersected 51.3 meters grading 7.2 g/t. This hole was drilled 40 meters up dip of BSDD298A which intersected 58.6 meters grading 4.0 g/t. Another 50 meters to the south BSDD318 intersected 15.8 meters that returned a grade of 32.9 g/t gold. This hole was drilled 50 meters up dip of the 52.9 meter zone drilled in BSDD256 which intersected 4.3g/t. Collectively these intersections demonstrate good continuity of grade and width of mineralization.

Significant results from both infill and step out drilling from the second quarter of this year are summarized in the table below.

Significant Drill Intersections


----------------------------------------------------------------------------
                         E           N        Elev          Azm          Dip
Hole ID                (m)         (m)         (m)  ( degrees )  ( degrees )
----------------------------------------------------------------------------
----------------------------------------------------------------------------
BSDD290BD1           39928       19521         736         71.7        -74.4
BSDD290BD1           39928       19521         736         71.7        -74.4
----------------------------------------------------------------------------
BSDD312              39692       19874        1044         90.0        -65.0
BSDD312              39692       19874        1044         90.0        -65.0
----------------------------------------------------------------------------
BSDD315D1            40018       19100         760         90.0        -76.0
----------------------------------------------------------------------------
BSDD315M             39922       19100        1028         90.7        -71.2
BSDD315M             39922       19100        1028         90.7        -71.2
BSDD315M             39922       19100        1028         90.7        -71.2
BSDD315M             39922       19100        1028         90.7        -71.2
----------------------------------------------------------------------------
BSDD316              39730       19825        1040         90.0        -65.0
----------------------------------------------------------------------------
BSDD317              39762       19751        1037         90.0        -65.0
----------------------------------------------------------------------------
BSDD318              39868       19625        1025         90.0        -72.0
BSDD318              39868       19625        1025         90.0        -72.0
BSDD318              39868       19625        1025         90.0        -72.0
BSDD318              39868       19625        1025         90.0        -72.0
BSDD318              39868       19625        1025         90.0        -72.0
----------------------------------------------------------------------------
BSDD319D1            39916       19497         703         90.0        -85.0
BSDD319D1            39916       19497         703         90.0        -85.0
BSDD319D1            39916       19497         703         90.0        -85.0
----------------------------------------------------------------------------
BSDD319M             39832       19497        1035         90.0        -74.5
BSDD319M             39832       19497        1035         90.0        -74.5
----------------------------------------------------------------------------
BSDD320              39776       19850        1031         90.0        -66.0
----------------------------------------------------------------------------
BSDD321              39848       19650        1030         90.0        -65.0
BSDD321              39848       19650        1030         90.0        -65.0
----------------------------------------------------------------------------
BSDD322              39829       19700        1035         90.0        -61.5
BSDD322              39829       19700        1035         90.0        -61.5
----------------------------------------------------------------------------
BSDD324              39754       20025        1019         90.0        -57.8
BSDD324              39754       20025        1019         90.0        -57.8
----------------------------------------------------------------------------
BSDD326              39755       19975        1021         90.0        -51.7
----------------------------------------------------------------------------
BSDD327B             39845       19575        1031         90.0        -67.8
----------------------------------------------------------------------------

----------------------------------------------------------------------------
                      From          To     Drilled  approx. True  Gold Grade
Hole ID                (m)         (m)   Width (m)     Width (m)         g/t
----------------------------------------------------------------------------
----------------------------------------------------------------------------
BSDD290BD1           158.2       208.1        49.9          45.4         8.3
BSDD290BD1           230.1       245.3        15.2          13.8         4.3
----------------------------------------------------------------------------
BSDD312              394.3       426.9        32.6          31.5         1.5
BSDD312              480.7       492.1        11.4          11.0         3.9
----------------------------------------------------------------------------
BSDD315D1             28.1        31.1         3.0           1.5        15.6
----------------------------------------------------------------------------
BSDD315M             490.1       554.6        64.5          60.2         3.4
BSDD315M             742.4       818.0        75.6          70.5         5.9
BSDD315M             823.0       841.1        18.1          16.9         4.4
BSDD315M             855.7       865.8        10.1           9.4         4.3
----------------------------------------------------------------------------
BSDD316              422.2       436.2        14.0          13.5         3.0
----------------------------------------------------------------------------
BSDD317              400.8       416.8        16.0          15.5         2.8
----------------------------------------------------------------------------
BSDD318              416.2       424.2         8.0           7.4        14.9
BSDD318              430.2       447.2        17.0          15.8        32.9
BSDD318              456.2       468.0        11.8          10.9         5.3
BSDD318              481.0       497.0        16.0          14.8         3.1
BSDD318              503.0       516.0        13.0          12.1         5.2
----------------------------------------------------------------------------
BSDD319D1            191.8       216.0        24.2           8.3         4.0
BSDD319D1            246.9       283.0        36.1          29.6         1.7
BSDD319D1            297.9       318.9        21.0          17.2         3.5
----------------------------------------------------------------------------
BSDD319M             306.6       317.8        11.2          10.2         4.4
BSDD319M             546.2       579.9        33.7          30.7         2.4
----------------------------------------------------------------------------
BSDD320              341.8       363.8        22.0          21.1         4.5
----------------------------------------------------------------------------
BSDD321              418.0       431.0        13.0          12.6         4.7
BSDD321              435.0       470.1        35.1          33.9         4.4
----------------------------------------------------------------------------
BSDD322              426.2       433.5         7.3           7.2         6.8
BSDD322              454.9       507.3        52.4          51.3         7.2
----------------------------------------------------------------------------
BSDD324              325.5       347.4        21.9          21.7         3.4
BSDD324              380.0       408.4        28.4          28.1         6.9
----------------------------------------------------------------------------
BSDD326               88.0       104.5        16.5          13.2         3.9
----------------------------------------------------------------------------
BSDD327B             530.4       546.4        16.0          15.2         4.8
----------------------------------------------------------------------------

The drilling program at Wassa has continued into the third quarter and is focused on confirmation and infill drilling. Pending a positive outcome of the Preliminary Economic Assessment ("PEA") of an underground mine at Wassa, a feasibility study will be undertaken. These results have been incorporated into a resource model update for this study.

Full drill results, plans, and sections from the drilling program are available at www.gsr.com/Operations/Wassa/wassa-main/default.aspx .

Statements Regarding Forward-Looking Information

Some statements contained in this news release are forward-looking statements within the meaning of the Private Securities Litigation Reform Act of 1995 and other applicable securities laws. Such statements include: the viability of expansion at Wassa and the ability to grow the life of mine; the impact of drill results on grades in the Company's upcoming resources model; the Company's expectations regarding its exploration and drilling activities during the remainder of 2013 and the timing thereof; expectations regarding the interpretation of drilling results; the consideration of underground mining at Wassa; the Company's ability to grow the life of mine at Wassa; and the timing for completing a National Instrument 43-101 report. Investors are cautioned that forward-looking statements are inherently uncertain and involve risks and uncertainties. Factors that could cause actual results to differ materially include timing of and unexpected events during exploration; variations in ore grade; variations in relative amounts of refractory, non-refractory and transition ores; technical or permitting issues; fluctuations in gold price and costs; availability of capital and/or external financing on acceptable terms; changes in U.S. and Canadian securities markets; and general economic conditions. There can be no assurance that future developments affecting the Company will be those anticipated by management. Please refer to the discussion of these risks and other factors in the Company's Form 10-K for 2012 and other filings of the Company with the United States Securities and Exchange Commission and the applicable Canadian securities regulatory authorities. The forecasts contained in this press release constitute management's current estimates, as of the date of this press release, with respect to the matters covered thereby. We expect that these estimates will change as new information is received. While we may elect to update these estimates at any time, we do not undertake to update any estimate at any particular time or in response to any particular event.

Technical Information and Quality Control

The technical contents of this press release have been reviewed and approved by S. Mitchel Wasel, BSc Geology, a Qualified Person pursuant to National Instrument 43-101. Mr. Wasel is Vice President of Exploration for Golden Star and an active member and Registered Chartered Professional of the Australasian Institute of Mining and Metallurgy.

The results for Wassa quoted herein are based on the analysis of saw-split HQ/NQ diamond half core or a three kilogram single stage riffle split of a nominal 25 to 30 kg Reverse Circulation chip sample which has been sampled over nominal one meter intervals (adjusted where necessary for mineralized structures). Sample preparation and analyses have been carried out at SGS Laboratories in Tarkwa using 1,000 gram slurry of sample and tap water which is prepared and subjected to an accelerated cyanide leach (LEACHWELL). The sample is then rolled for twelve hours before being allowed to settle. An aliquot of solution is then taken, gold extracted into Di-iso Butyl Keytone (DiBK), and determined by flame Atomic Absorption Spectrophotometry (AAS). Detection Limit is 0.01 ppm.

All analytical work is subject to a systematic and rigorous Quality Assurance-Quality Control (QA-QC). At least 5% of samples are certified standards and the accuracy of the analysis is confirmed to be acceptable from comparison of the recommended and actual "standards" results. The remaining half core is stored on site for future inspection and detailed logging, to provide valuable information on mineralogy, structure, alteration patterns and the controls on gold mineralization.

Additional information on earlier drilling results and Mineral Reserve and Mineral Resource estimates at Wassa are available in the Company's National Instrument 43-101 compliant Technical Report titled "NI 43-101 Technical Report on Mineral Resources and Mineral Reserves Golden Star Resources Ltd, Wassa Gold Mine, Ghana, Effective Date 31st December 2012".

Cautionary note to U.S. investors

This news release has been prepared in accordance with the requirements of the securities laws in effect in Canada, which differ materially from the requirements of United States securities laws applicable to U.S. companies. The terms "mineral reserve", "proven mineral reserve" and "probable mineral reserve" are Canadian mining terms as defined in accordance with National Instrument 43-101 - Standards of Disclosure for Mineral Projects ("NI 43-101") the Canadian Institute of Mining, Metallurgy and Petroleum. These definitions differ from the definitions of the Securities and Exchange Commission (the "SEC") set forth in Industry Guide 7 under the United States Securities Exchange Act of 1934, as amended (the "Exchange Act"). Under SEC Industry Guide 7 standards, mineralization may not be classified as a "reserve" unless the determination has been made that the mineralization could be economically and legally produced or extracted at the time the reserve determination is made. Among other things, all necessary permits would be required to be in hand or issuance imminent in order to classify mineralized material as reserves under the SEC standards. Under SEC Industry Guide 7 standards, a "final" or "bankable" feasibility study is required to report reserves, the three-year historical average price is used in any reserve or cash flow analysis to designate reserves and the primary environmental analysis or report must be filed with the appropriate governmental authority.

In addition, the terms "mineral resource", "measured mineral resource", "indicated mineral resource" and "inferred mineral resource" are defined in and required to be disclosed by NI 43-101; however, these terms are not defined terms under SEC Industry Guide 7 and are normally not permitted to be used in reports and registration statements filed with the SEC. Investors are cautioned not to assume that any part or all of mineral deposits in these categories will ever be converted into reserves. "Inferred mineral resources" have a great amount of uncertainty as to their existence, and great uncertainty as to their economic and legal feasibility. It cannot be assumed that all or any part of an inferred mineral resource will ever be upgraded to a higher category. Under Canadian rules, estimates of inferred mineral resources may not form the basis of feasibility or pre-feasibility studies, except in rare cases. Investors are cautioned not to assume that all or any part of an inferred mineral resource exists or is economically or legally mineable. Disclosure of "contained ounces" in a resource is permitted disclosure under Canadian regulations; however, the SEC normally only permits issuers to report mineralization that does not constitute "reserves" by SEC Industry Guide 7 standards as in place tonnage and grade without reference to unit measures.

For the above reasons, information contained in this news release and the documents referenced herein containing descriptions of our mineral deposits may not be comparable to similar information made public by U.S. companies subject to the reporting and disclosure requirements under the United States federal securities laws and the rules and regulations thereunder.

Company Profile:

Golden Star Resources (NYSE MKT: GSS)(TSX: GSC)(GHANA: GSR) ("Golden Star" or the "Company") is an established gold mining company that holds a 90% interest in both the Bogoso and Wassa open-pit gold mines in Ghana. The Company also has a 90% interest in the Prestea Underground mine in Ghana. Golden Star has Mineral Reserves of 3.9 million ounces and 6.4 million ounces in Measured and Indicated Mineral Resources. In 2013, Golden Star sold 331,000 ounces of gold and in 2014 the Company expects to produce 260,000 - 280,000 ounces. The Company offers investors leveraged exposure to the gold price in a stable African mining jurisdiction with exploration and development upside potential.

For further information regarding Golden Star's Mineral Reserves and Mineral Resources, see Golden Star's Annual Information Form for the year ended December 31, 2013, available on SEDAR at www.sedar.com.

More Stories By Marketwired .

Copyright © 2009 Marketwired. All rights reserved. All the news releases provided by Marketwired are copyrighted. Any forms of copying other than an individual user's personal reference without express written permission is prohibited. Further distribution of these materials is strictly forbidden, including but not limited to, posting, emailing, faxing, archiving in a public database, redistributing via a computer network or in a printed form.

Latest Stories
SYS-CON Events announced today that Commvault, a global leader in enterprise data protection and information management, has been named “Bronze Sponsor” of SYS-CON's 18th International Cloud Expo, which will take place on June 7–9, 2016, at the Javits Center in New York City, NY, and the 19th International Cloud Expo, which will take place on November 1–3, 2016, at the Santa Clara Convention Center in Santa Clara, CA. Commvault is a leading provider of data protection and information management...
SYS-CON Events announced today that AppNeta, the leader in performance insight for business-critical web applications, will exhibit and present at SYS-CON's @DevOpsSummit at Cloud Expo New York, which will take place on June 7-9, 2016, at the Javits Center in New York City, NY. AppNeta is the only application performance monitoring (APM) company to provide solutions for all applications – applications you develop internally, business-critical SaaS applications you use and the networks that deli...
It's easy to assume that your app will run on a fast and reliable network. The reality for your app's users, though, is often a slow, unreliable network with spotty coverage. What happens when the network doesn't work, or when the device is in airplane mode? You get unhappy, frustrated users. An offline-first app is an app that works, without error, when there is no network connection.
Father business cycles and digital consumers are forcing enterprises to respond faster to customer needs and competitive demands. Successful integration of DevOps and Agile development will be key for business success in today’s digital economy. In his session at DevOps Summit, Pradeep Prabhu, Co-Founder & CEO of Cloudmunch, covered the critical practices that enterprises should consider to seamlessly integrate Agile and DevOps processes, barriers to implementing this in the enterprise, and pr...
The cloud promises new levels of agility and cost-savings for Big Data, data warehousing and analytics. But it’s challenging to understand all the options – from IaaS and PaaS to newer services like HaaS (Hadoop as a Service) and BDaaS (Big Data as a Service). In her session at @BigDataExpo at @ThingsExpo, Hannah Smalltree, a director at Cazena, will provide an educational overview of emerging “as-a-service” options for Big Data in the cloud. This is critical background for IT and data profes...
Cognitive Computing is becoming the foundation for a new generation of solutions that have the potential to transform business. Unlike traditional approaches to building solutions, a cognitive computing approach allows the data to help determine the way applications are designed. This contrasts with conventional software development that begins with defining logic based on the current way a business operates. In her session at 18th Cloud Expo, Judith S. Hurwitz, President and CEO of Hurwitz & ...
The principles behind DevOps are not new - for decades people have been automating system administration and decreasing the time to deploy apps and perform other management tasks. However, only recently did we see the tools and the will necessary to share the benefits and power of automation with a wider circle of people. In his session at DevOps Summit, Bernard Sanders, Chief Technology Officer at CloudBolt Software, explored the latest tools including Puppet, Chef, Docker, and CMPs needed to...
One of the bewildering things about DevOps is integrating the massive toolchain including the dozens of new tools that seem to crop up every year. Part of DevOps is Continuous Delivery and having a complex toolchain can add additional integration and setup to your developer environment. In his session at @DevOpsSummit at 18th Cloud Expo, Miko Matsumura, Chief Marketing Officer of Gradle Inc., will discuss which tools to use in a developer stack, how to provision the toolchain to minimize onboa...
As someone who has been dedicated to automation and Application Release Automation (ARA) technology for almost six years now, one of the most common questions I get asked regards Platform-as-a-Service (PaaS). Specifically, people want to know whether release automation is still needed when a PaaS is in place, and why. Isn't that what a PaaS provides? A solution to the deployment and runtime challenges of an application? Why would anyone using a PaaS then need an automation engine with workflow ...
SYS-CON Events announced today that Men & Mice, the leading global provider of DNS, DHCP and IP address management overlay solutions, will exhibit at SYS-CON's 18th International Cloud Expo®, which will take place on June 7-9, 2016, at the Javits Center in New York City, NY. The Men & Mice Suite overlay solution is already known for its powerful application in heterogeneous operating environments, enabling enterprises to scale without fuss. Building on a solid range of diverse platform support,...
SYS-CON Events announced today that VAI, a leading ERP software provider, will exhibit at SYS-CON's 18th International Cloud Expo®, which will take place on June 7-9, 2016, at the Javits Center in New York City, NY. VAI (Vormittag Associates, Inc.) is a leading independent mid-market ERP software developer renowned for its flexible solutions and ability to automate critical business functions for the distribution, manufacturing, specialty retail and service sectors. An IBM Premier Business Part...
SYS-CON Events announced today that Alert Logic, Inc., the leading provider of Security-as-a-Service solutions for the cloud, will exhibit at SYS-CON's 18th International Cloud Expo®, which will take place on June 7-9, 2016, at the Javits Center in New York City, NY. Alert Logic, Inc., provides Security-as-a-Service for on-premises, cloud, and hybrid infrastructures, delivering deep security insight and continuous protection for customers at a lower cost than traditional security solutions. Ful...
Fortunately, meaningful and tangible business cases for IoT are plentiful in a broad array of industries and vertical markets. These range from simple warranty cost reduction for capital intensive assets, to minimizing downtime for vital business tools, to creating feedback loops improving product design, to improving and enhancing enterprise customer experiences. All of these business cases, which will be briefly explored in this session, hinge on cost effectively extracting relevant data from ...
In most cases, it is convenient to have some human interaction with a web (micro-)service, no matter how small it is. A traditional approach would be to create an HTTP interface, where user requests will be dispatched and HTML/CSS pages must be served. This approach is indeed very traditional for a web site, but not really convenient for a web service, which is not intended to be good looking, 24x7 up and running and UX-optimized. Instead, talking to a web service in a chat-bot mode would be muc...
SYS-CON Events announced today that Catchpoint Systems, Inc., a provider of innovative web and infrastructure monitoring solutions, has been named “Silver Sponsor” of SYS-CON's DevOps Summit at 18th Cloud Expo New York, which will take place June 7-9, 2016, at the Javits Center in New York City, NY. Catchpoint is a leading Digital Performance Analytics company that provides unparalleled insight into customer-critical services to help consistently deliver an amazing customer experience. Designed...