Welcome!

News Feed Item

Foran Chairman Increases Ownership in Company to 13.4%

VANCOUVER, BRITISH COLUMBIA -- (Marketwired) -- 08/01/14 -- Foran Mining Corporation (TSX VENTURE:FOM) ("Foran" or the "Company") wishes to announce that Darren Morcombe, Chairman of the Board of Directors of Foran, has recently increased his share ownership interest to 12.5% of the Company's issued and outstanding common shares ("Shares"), or 13.4% on a diluted basis, via acquisition in the public market.

Mr. Morcombe acquired 500,000 Shares through the facilities of the TSX Venture Exchange at a price of $0.175 per Share. Immediately prior to this purchase, Mr. Morcombe owned 9,888,500 Shares representing 11.9% of the Company's Shares or 12.9% on a diluted basis. As required for the purposes of National Instrument 62-103, Mr. Morcombe has filed an early warning report ("EWR"), completed filings on SEDI and the Company has issued this news release to announce that he has increased his position by more than 2% since the filing of his last EWR on July 12, 2010. As a result of his recent Share purchases, Mr. Morcombe currently owns 10,388,500 Shares. In addition, Mr. Morcombe holds 950,000 stock options, which gives him the right to purchase an additional 950,000 Shares at a weighted average exercise price of $0.88. Including his stock options, Mr. Morcombe has control of 13.4% of the Company on a diluted basis.

Mr. Morcombe has acquired these Shares for investment purposes, and not for the purpose of influencing the control or direction of the Company. However, Mr. Morcombe will review his holdings from time to time and may increase or decrease his position as future circumstances may dictate. The address of Mr. Morcombe is Via Trevano 28, Cannobio, Switzerland 6952. Mr. Morcombe has been Chairman of the Board of Foran since being elected to the Board of Directors in July of 2010.

About Foran Mining

Foran is a diversified exploration and development company with projects in the Flin Flon Mining Belt. McIlvenna Bay, the Company's flagship deposit, is located in east-central Saskatchewan, 65 kilometres west of Flin Flon, Manitoba, is one of the largest undeveloped volcanogenic massive sulphide deposits in Canada.

On March 27, 2013, Foran announced an increased mineral resource estimate for McIlvenna Bay, with indicated resources of 13.9 million tonnes grading 1.96% copper equivalent or 13.19% zinc equivalent (1.28% Cu, 2.67% Zn, 0.49 g/t Au, 17 g/t Ag) and an inferred resource of 11.3 million tonnes grading 2.01% copper equivalent or 13.52% zinc equivalent (1.32% Cu, 2.97% Zn, 0.43 g/t Au, 17 g/t Ag). For additional information, see the Foran news release dated March 27, 2013 or the report entitled "Technical Report on the McIlvenna Bay Project, Saskatchewan, Canada" dated December 9, 2011 at www.sedar.com or www.foranmining.com.

Roger March, VP Project Exploration for Foran and a Qualified Person within the meaning of National Instrument 43-101, has reviewed and approved the technical information in this release.

As at March 31, 2014 Foran had a treasury of $4.4 million in cash and cash equivalents.

Foran trades on the TSX.V under the symbol "FOM".

Neither the TSX-V nor its Regulation Services Provider (as that term is defined in the policies of the TSX-V) accepts responsibility for the adequacy of this release. No stock exchange, securities commission or other regulatory authority has approved or disapproved the information contained herein.

Forward-Looking Statements

This news release contains forward-looking information which is not comprised of historical facts. Forward-looking information involves risks, uncertainties and other factors that could cause actual events, results, performance, prospects and opportunities to differ materially from those expressed or implied by such forward-looking information. Forward looking information in this news release includes, but is not limited to, Foran's objectives, goals or future plans, statements regarding the estimation of mineral resources, exploration results, potential mineralization, exploration and mine development plans, timing of the commencement of operations and estimates of market conditions. Factors that could cause actual results to differ materially from such forward-looking information include, but are not limited to, failure to convert estimated mineral resources to reserves, capital and operating costs varying significantly from estimates, the preliminary nature of metallurgical test results, delays in obtaining or failures to obtain required governmental, environmental or other project approvals, political risks, uncertainties relating to the availability and costs of financing needed in the future, changes in equity markets, inflation, changes in exchange rates, fluctuations in commodity prices, delays in the development of projects and the other risks involved in the mineral exploration and development industry, and those risks set out in Foran's public documents filed on SEDAR. Although Foran believes that the assumptions and factors used in preparing the forward-looking information in this news release are reasonable, undue reliance should not be placed on such information, which only applies as of the date of this news release, and no assurance can be given that such events will occur in the disclosed time frames or at all. Foran disclaims any intention or obligation to update or revise any forward-looking information, whether as a result of new information, future events or otherwise, other than as required by law.

More Stories By Marketwired .

Copyright © 2009 Marketwired. All rights reserved. All the news releases provided by Marketwired are copyrighted. Any forms of copying other than an individual user's personal reference without express written permission is prohibited. Further distribution of these materials is strictly forbidden, including but not limited to, posting, emailing, faxing, archiving in a public database, redistributing via a computer network or in a printed form.

Latest Stories
Internet of @ThingsExpo has announced today that Chris Matthieu has been named tech chair of Internet of @ThingsExpo 2016 Silicon Valley. The 6thInternet of @ThingsExpo will take place on November 1–3, 2016, at the Santa Clara Convention Center in Santa Clara, CA.
Early adopters of IoT viewed it mainly as a different term for machine-to-machine connectivity or M2M. This is understandable since a prerequisite for any IoT solution is the ability to collect and aggregate device data, which is most often presented in a dashboard. The problem is that viewing data in a dashboard requires a human to interpret the results and take manual action, which doesn’t scale to the needs of IoT.
When building large, cloud-based applications that operate at a high scale, it’s important to maintain a high availability and resilience to failures. In order to do that, you must be tolerant of failures, even in light of failures in other areas of your application. “Fly two mistakes high” is an old adage in the radio control airplane hobby. It means, fly high enough so that if you make a mistake, you can continue flying with room to still make mistakes. In his session at 18th Cloud Expo, Lee...
Continuous testing helps bridge the gap between developing quickly and maintaining high quality products. But to implement continuous testing, CTOs must take a strategic approach to building a testing infrastructure and toolset that empowers their team to move fast. Download our guide to laying the groundwork for a scalable continuous testing strategy.
CenturyLink has announced that application server solutions from GENBAND are now available as part of CenturyLink’s Networx contracts. The General Services Administration (GSA)’s Networx program includes the largest telecommunications contract vehicles ever awarded by the federal government. CenturyLink recently secured an extension through spring 2020 of its offerings available to federal government agencies via GSA’s Networx Universal and Enterprise contracts. GENBAND’s EXPERiUS™ Application...
Much of IT terminology is often misused and misapplied. Modernization and transformation are two such terms. They are often used interchangeably even though they mean different things and have very different connotations. Indeed, it is somewhat safe to assume that in IT any transformative effort is likely to also have a modernizing effect, and thus, we can see these as levels of improvement efforts. However, many businesses are being led to believe if they don’t transform now they risk becoming ...
"We provide DevOps solutions. We also partner with some key players in the DevOps space and we use the technology that we partner with to engineer custom solutions for different organizations," stated Himanshu Chhetri, CTO of Addteq, in this SYS-CON.tv interview at DevOps at 18th Cloud Expo, held June 7-9, 2016, at the Javits Center in New York City, NY.
SYS-CON Events announced today the Enterprise IoT Bootcamp, being held November 1-2, 2016, in conjunction with 19th Cloud Expo | @ThingsExpo at the Santa Clara Convention Center in Santa Clara, CA. Combined with real-world scenarios and use cases, the Enterprise IoT Bootcamp is not just based on presentations but with hands-on demos and detailed walkthroughs. We will introduce you to a variety of real world use cases prototyped using Arduino, Raspberry Pi, BeagleBone, Spark, and Intel Edison. Y...
What does it look like when you have access to cloud infrastructure and platform under the same roof? Let’s talk about the different layers of Technology as a Service: who cares, what runs where, and how does it all fit together. In his session at 18th Cloud Expo, Phil Jackson, Lead Technology Evangelist at SoftLayer, an IBM company, spoke about the picture being painted by IBM Cloud and how the tools being crafted can help fill the gaps in your IT infrastructure.
Using new techniques of information modeling, indexing, and processing, new cloud-based systems can support cloud-based workloads previously not possible for high-throughput insurance, banking, and case-based applications. In his session at 18th Cloud Expo, John Newton, CTO, Founder and Chairman of Alfresco, described how to scale cloud-based content management repositories to store, manage, and retrieve billions of documents and related information with fast and linear scalability. He addres...
DevOps at Cloud Expo – being held November 1-3, 2016, at the Santa Clara Convention Center in Santa Clara, CA – announces that its Call for Papers is open. Born out of proven success in agile development, cloud computing, and process automation, DevOps is a macro trend you cannot afford to miss. From showcase success stories from early adopters and web-scale businesses, DevOps is expanding to organizations of all sizes, including the world's largest enterprises – and delivering real results. Am...
Aspose.Total for .NET is the most complete package of all file format APIs for .NET as offered by Aspose. It empowers developers to create, edit, render, print and convert between a wide range of popular document formats within any .NET, C#, ASP.NET and VB.NET applications. Aspose compiles all .NET APIs on a daily basis to ensure that it contains the most up to date versions of each of Aspose .NET APIs. If a new .NET API or a new version of existing APIs is released during the subscription peri...
SYS-CON Events announced today that LeaseWeb USA, a cloud Infrastructure-as-a-Service (IaaS) provider, will exhibit at the 19th International Cloud Expo, which will take place on November 1–3, 2016, at the Santa Clara Convention Center in Santa Clara, CA. LeaseWeb is one of the world's largest hosting brands. The company helps customers define, develop and deploy IT infrastructure tailored to their exact business needs, by combining various kinds cloud solutions.
As companies gain momentum, the need to maintain high quality products can outstrip their development team’s bandwidth for QA. Building out a large QA team (whether in-house or outsourced) can slow down development and significantly increases costs. This eBook takes QA profiles from 5 companies who successfully scaled up production without building a large QA team and includes: What to consider when choosing CI/CD tools How culture and communication can make or break implementation
Adding public cloud resources to an existing application can be a daunting process. The tools that you currently use to manage the software and hardware outside the cloud aren’t always the best tools to efficiently grow into the cloud. All of the major configuration management tools have cloud orchestration plugins that can be leveraged, but there are also cloud-native tools that can dramatically improve the efficiency of managing your application lifecycle. In his session at 18th Cloud Expo, ...