VANCOUVER, BRITISH COLUMBIA -- (Marketwired) -- 08/07/14 -- NGEx Resources Inc. (TSX:NGQ)(NASDAQ OMX:NGQ) ("NGEx" or the "Company") is pleased to announce its operating and financial results for the three and six months ended June 30, 2014 and to provide an update on results of work on its projects to date.

HIGHLIGHTS AND SIGNIFICANT EVENTS

The Company had a very successful second quarter led by excellent results from exploration drilling at Filo del Sol which produced some of the highest grade copper, gold, and silver intercepts to date. The Company also made good progress on the conceptual engineering studies underway at Los Helados. On the corporate front, the Company completed its private placement and a secondary listing of the Company's shares on the Nasdaq OMX Stockholm in Sweden. Highlights from the quarter are listed below.

Los Helados


--  Work continued on evaluating development options for the Los Helados
    project with good progress on evaluation of potential mining methods and
    development of high level processing flow sheets. The scope of this
    ongoing study includes an evaluation of potential mining methods and
    production rates, geotechnical drilling, ongoing metallurgical test
    work, including comminution studies, and development of high level
    processing flow sheets and mass balances. Work is ongoing and a variety
    of potential development scenarios continue to be considered. Good
    progress was also made on baseline environmental studies including the
    installation of weather stations and other monitoring equipment. The
    Company is currently targeting completion of a Preliminary Economic
    Assessment in the fourth quarter of 2014 although the exact timing will
    depend on progress over the next few months.

Josemaria


--  Drilling at Josemaria was completed during the first quarter of 2014 and
    no field work was carried out during the second quarter. Final assay
    results from the 2013/2014 drill program were released on April 24,
    2014. The Company plans to incorporate the results of the 2013/2014
    drill program into an updated resource estimate. The results of this
    year's drilling will be incorporated into an updated resource estimate
    and once the results of ongoing metallurgical test work are received the
    Company intends to complete an updated Technical Report. 

--  Metallurgical test work and baseline environmental programs, including
    review of areas for potential infrastructure continued during the
    quarter. 

Filo del Sol


--  The 2013/2014 drill program was completed during the first quarter of
    2014, and no field work was carried out at Filo del Sol during the
    second quarter On April 10, 2014, the Company announced the results of
    ten additional holes drilled at the Filo del Sol Project which included
    some of the highest copper and silver grades intercepted to date
    including an intercept of 5.80% copper over 22 metres. 

--  On April 30, 2014 the Company announced the results from the final nine
    holes drilled in the first quarter of 2014 at Filo del Sol which
    included an intercept of 7.59% copper over 10 metres and 314.5 g/t
    silver over 12 metres. 

--  The Company is encouraged by the results of this year's exploration
    program at Filo del Sol which is emerging as a potentially significant
    new discovery. The Company is particularly excited about the high
    copper, silver, and gold grades in the manto zone and by the potential
    for a large scale porphyry copper-gold deposit beneath the manto zone.
    The Filo del Sol alteration zone is one of the largest in this part of
    the Andes and drilling to date has tested only a small portion of it.
    Mineralization is open in all directions and at depth the Company
    believes that there is excellent potential to further extend it through
    additional drilling.

--  Now that complete drill results have been received the Company plans to
    start work on an initial resource estimate for the Filo del Sol project.
    This is expected to be completed in the fourth quarter of 2014.

Corporate


--  On June 16, 2014, the Company completed its private placement and sold
    an aggregate of 17,412,935 common shares of the Company for gross
    proceeds of approximately $35 million.

--  On June 19, 2014, the Company completed a secondary listing of its
    common shares and commenced trading in Sweden on NASDAQ OMX Stockholm. 

RESULTS OF OPERATIONS

The Company's net loss for the six months ended June 30, 2014 was $13.7 million or $0.08 per share as compared to a loss of $23.1 million or $0.14 per share for 2013. Net loss from continuing operations for the six months ended June 30, 2014 was $13.7 million or $0.08 per share compared with a net loss from continuing operations of $23.0 million or $0.14 per share for 2013. The decrease in the net loss of $9.4 million is mainly due to a decrease in exploration and project investigation expenditures of $8.3 million resulting from a reduction in drilling activity at Los Helados and Josemaria offset by costs relating to conceptual studies at these properties and the commencement of drilling at Filo del Sol. In addition, the Company recorded a write-down of certain mineral property interests during the six months ended June 30, 2013 of $1.2 million.

Exploration and project investigation expenditures during the first and second quarter of 2014 mainly relate to exploration activity at Filo del Sol and conceptual studies on the Los Helados and Josemaria projects. In the second quarter of 2014, exploration and project investigation expenditures were lower than the same quarter in 2013 given that the Company did not engage in any drilling during the second quarter of 2014. During the second quarter of 2013, the Company incurred field related and drilling expenses at Los Helados and Colmillos. This is offset by costs incurred during the second quarter of 2014 relating to conceptual studies at Los Helados and Josemaria.

The net loss from continuing operations was $1.6 million lower for the second quarter ended June 30, 2014 compared to the same period in 2013. This is mainly due to a decrease of $1.1 million of exploration and project investigation expenditures as explained above. In addition, the Company recorded a write down of certain mineral property interests during the second quarter of 2013 of $1.2 million. This is off-set by a foreign exchange loss during the second quarter of 2014 as a result of movements in the U.S. dollar to Canadian dollar exchange rate.

The Company's business is driven by seasonal trends through increased exploration activity during the summer months in South America as well as the achievement of project milestones such as the achievement of various technical, environmental, socio-economic and legal objectives, including obtaining the necessary permits, preparation of engineering designs, as well as receipt of financings to fund these objectives.

LIQUIDITY AND CAPITAL RESOURCES

At June 30, 2014, the Company had cash and working capital of $34.8 million and $34.2 million, respectively, as compared to cash and working capital of $21.3 million and $14.2 million, respectively, at December 31, 2013. The increase in cash and working capital is primarily a result of the completion of a private placement whereby the Company sold an aggregate of 17,412,935 common shares of the Company for gross proceeds of approximately $35 million. This is offset by exploration and general and administration expenses incurred during the period.

Net cash used in operating activities was $19.0 million for the six months ended June 30, 2014 and consisted primarily of the loss from operations of $13.7 million, which included exploration and project investigation expenditures and conceptual studies work of $10.5 million and was adjusted for the impact of non-cash items and changes in non-cash working capital.

Cash flow from financing activities was $33.4 million, which comprised of net proceeds from the private placement completed during the period and proceeds from the exercise of stock options.

Net cash used in investing activities was $0.4 million, which consisted primarily of expenditures relating to mineral property option payments.

As the Company is an exploration company and has no sources of revenue, the Company expects that it will operate at a loss for the foreseeable future.

The Company anticipates that its current financial position will provide sufficient working capital to fund its share of planned exploration and project investigation expenditures, which are discretionary, and corporate expenses for the next twelve months. As the Company is an exploration company and has no sources of revenue, additional funding from equity financing, joint ventures or disposition of mineral properties and investments may be required to fund further exploration and corporate expenses.

There can be no assurance that such financing will be available to the Company in the amount required at any time or for any period or, if available, that it can be obtained on terms satisfactory to the Company.

OUTLOOK

The Company's efforts are focused on large scale copper-gold-silver targets that demonstrate the potential for world class discoveries and exploration opportunities in the region. The Company is focused on its South American copper-gold projects including its very significant Los Helados project in Chile as well as the Josemaria and Filo del Sol projects in Argentina. In addition, the Company continues to evaluate opportunities elsewhere in Chile and Argentina.

The 2013/2014 exploration drill programs at Josemaria and Filo del Sol are now complete and all exploration data has been received. The Company plans to start work on an initial resource estimate for the Filo del Sol project and an updated resource estimate for the Josemaria project. The Filo del Sol resource estimate is expected to be completed during the fourth quarter of 2014. Finalization of the Josemaria resource estimate is dependent on the completion on the current second phase of metallurgical testwork which is anticipated in the first quarter of 2015.

The Company continues to advance the engineering studies at Los Helados to assess possible development options in addition to completing the metallurgical test work program at Josemaria. Baseline work in support of the environmental programs at both properties will progress.

About NGEx

NGEx is a Canadian mineral exploration company with exploration projects in Chile, Argentina, and Canada. The Company's shares are listed on the Toronto Stock Exchange and NASDAQ OMX Stockholm under the symbol "NGQ". The Company's focus is on advancing its South American projects which include several large copper-gold systems including the Josemaria, Los Helados, and Filo del Sol projects, located on a land package that the Company holds in Chile's Region III and adjacent San Juan Province, Argentina. Los Helados and Filo del Sol are part of a joint venture in which the Company holds 60% and Pan Pacific Copper Co., Ltd. holds 40%. Josemaria is part of a joint venture in which the Company holds 60% and Japan Oil, Gas, and Metals National Corporation (JOGMEC) owns 40%. In addition, the Company holds an extensive portfolio of 100% owned early stage exploration projects located in Chile and Argentina. It also owns a 100% interest in the GJ copper and gold project located in British Columbia Canada. The GJ project is optioned to Teck Resources who are earning up to a 75% interest.

On behalf of the board

Wojtek Wodzicki, President and CEO

Qualified Person

The disclosure of scientific and technical information in this news release regarding NGEx's projects, has been reviewed and approved by Mr. Bob Carmichael, B.A.Sc, P.Eng., Vice President, Exploration for the Company, who is a Qualified Person in accordance with the requirements of National Instrument 43-101. For a description of the quality assurance program and quality control measures applied by NGEx, please see NGEx's Annual Information Form dated March 31, 2014 available at http://www.sedar.com.

Additional Information

NGEx's consolidated financial statements for the year ended December 31, 2013 and related management's discussion and analysis are available on NGEx's website at www.ngexresources.com or under its profile on SEDAR at www.sedar.com.

Cautionary Note Regarding Forward-Looking Information

This news release contains "forward-looking information" within the meaning of applicable Canadian securities legislation, concerning the business, operations and financial performance and condition of NGEx Resources Inc. Forward-looking information includes, but is not limited to, statements with respect to the timing and nature of any potential development scenarios, estimation of commodity prices, mineral resources, costs, the success of exploration activities, permitting time lines, currency exchange rate fluctuations, requirements for additional capital, government regulation of mining activities, environmental risks, unanticipated reclamation expenses, title disputes or claims and limitations on insurance coverage. Generally, this forward-looking information can be identified by the use of forward-looking terminology such as "plans", "expects" or "does not expect", "is expected", "budget", "scheduled", "estimates", "forecasts", "intends", "anticipates" or "does not anticipate", or "believes", or variations of such words and phrases or state that certain actions, events or results "may", "could", "would", "might" or "will be taken", "occur" or "be achieved" or the negative connotations thereof. All such forward-looking information is based on the opinions and estimates of the relevant management as of the date such statements are made and are subject to important risk factors and uncertainties, many of which are beyond the Company's ability to control or predict.

Forward-looking information is necessarily based on estimates and assumptions that are inherently subject to known and unknown risks, uncertainties and other factors that may cause the actual results, level of activity, performance or achievements of the Company to be materially different from those expressed or implied by such forward-looking information, including but not limited to: risks and uncertainties relating to, among other things, changes in commodity prices, currency fluctuation, financing, unanticipated resource grades, infrastructure, results of exploration activities, cost overruns, availability of materials and equipment, timeliness of government approvals, taxation, political risk and related economic risk and unanticipated environmental impact on operations as well as other risks and uncertainties described under "Risks Factors" in the Company's Annual Information Form available under the Company's profile at www.sedar.com and the Company's website.

Although the Company has attempted to identify important factors that would cause actual results to differ materially from those contained in forward-looking information, there may be other factors that cause results not to be as anticipated, estimated, or intended. There can be no assurance that such statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. All of the forward-looking information contained in this document is qualified by these cautionary statements. Readers should not place undue reliance on forward-looking information.

Forward-looking information is provided for the purpose of providing information about management's current expectations and plans and allowing investors and other to get a better understanding of the Company's operating environment. These factors are not, and should not be construed as being, exhaustive. Statements relating to "mineral resources" are deemed to be forward-looking information, as they involve the implied assessment, based on certain estimates and assumptions that the mineral resources described can be profitably produced in the future. The forward-looking information contained in this press release is expressly qualified by this cautionary statement. The Company expressly disclaims any intention or obligation to update or revise any forward-looking information whether as a result of new information, events or otherwise, except in accordance with applicable securities laws.

More Stories By Marketwired .

Copyright © 2009 Marketwired. All rights reserved. All the news releases provided by Marketwired are copyrighted. Any forms of copying other than an individual user's personal reference without express written permission is prohibited. Further distribution of these materials is strictly forbidden, including but not limited to, posting, emailing, faxing, archiving in a public database, redistributing via a computer network or in a printed form.

Latest Stories
Learn how to solve the problem of keeping files in sync between multiple Docker containers. In his session at 16th Cloud Expo, Aaron Brongersma, Senior Infrastructure Engineer at Modulus, discussed using rsync, GlusterFS, EBS and Bit Torrent Sync. He broke down the tools that are needed to help create a seamless user experience. In the end, can we have an environment where we can easily move Docker containers, servers, and volumes without impacting our applications? He shared his results so yo...
Palerra, the cloud security automation company, announced enhanced support for Amazon AWS, allowing IT security and DevOps teams to automate activity and configuration monitoring, anomaly detection, and orchestrated remediation, thereby meeting compliance mandates within complex infrastructure deployments. "Monitoring and threat detection for AWS is a non-trivial task. While Amazon's flexible environment facilitates successful DevOps implementations, it adds another layer, which can become a ...
With SaaS use rampant across organizations, how can IT departments track company data and maintain security? More and more departments are commissioning their own solutions and bypassing IT. A cloud environment is amorphous and powerful, allowing you to set up solutions for all of your user needs: document sharing and collaboration, mobile access, e-mail, even industry-specific applications. In his session at 16th Cloud Expo, Shawn Mills, President and a founder of Green House Data, discussed h...
The Software Defined Data Center (SDDC), which enables organizations to seamlessly run in a hybrid cloud model (public + private cloud), is here to stay. IDC estimates that the software-defined networking market will be valued at $3.7 billion by 2016. Security is a key component and benefit of the SDDC, and offers an opportunity to build security 'from the ground up' and weave it into the environment from day one. In his session at 16th Cloud Expo, Reuven Harrison, CTO and Co-Founder of Tufin,...
SYS-CON Events announced today that MobiDev, a software development company, will exhibit at the 17th International Cloud Expo®, which will take place November 3–5, 2015, at the Santa Clara Convention Center in Santa Clara, CA. MobiDev is a software development company with representative offices in Atlanta (US), Sheffield (UK) and Würzburg (Germany); and development centers in Ukraine. Since 2009 it has grown from a small group of passionate engineers and business managers to a full-scale mobi...
There are many considerations when moving applications from on-premise to cloud. It is critical to understand the benefits and also challenges of this migration. A successful migration will result in lower Total Cost of Ownership, yet offer the same or higher level of robustness. In his session at 15th Cloud Expo, Michael Meiner, an Engineering Director at Oracle, Corporation, analyzed a range of cloud offerings (IaaS, PaaS, SaaS) and discussed the benefits/challenges of migrating to each offe...
Chuck Piluso presented a study of cloud adoption trends and the power and flexibility of IBM Power and Pureflex cloud solutions. Prior to Secure Infrastructure and Services, Mr. Piluso founded North American Telecommunication Corporation, a facilities-based Competitive Local Exchange Carrier licensed by the Public Service Commission in 10 states, serving as the company's chairman and president from 1997 to 2000. Between 1990 and 1997, Mr. Piluso served as chairman & founder of International Te...
Mobile, social, Big Data, and cloud have fundamentally changed the way we live. “Anytime, anywhere” access to data and information is no longer a luxury; it’s a requirement, in both our personal and professional lives. For IT organizations, this means pressure has never been greater to deliver meaningful services to the business and customers.
In a recent research, analyst firm IDC found that the average cost of a critical application failure is $500,000 to $1 million per hour and the average total cost of unplanned application downtime is $1.25 billion to $2.5 billion per year for Fortune 1000 companies. In addition to the findings on the cost of the downtime, the research also highlighted best practices for development, testing, application support, infrastructure, and operations teams.
In their session at 17th Cloud Expo, Hal Schwartz, CEO of Secure Infrastructure & Services (SIAS), and Chuck Paolillo, CTO of Secure Infrastructure & Services (SIAS), provide a study of cloud adoption trends and the power and flexibility of IBM Power and Pureflex cloud solutions. In his role as CEO of Secure Infrastructure & Services (SIAS), Hal Schwartz provides leadership and direction for the company.
Puppet Labs has announced the next major update to its flagship product: Puppet Enterprise 2015.2. This release includes new features providing DevOps teams with clarity, simplicity and additional management capabilities, including an all-new user interface, an interactive graph for visualizing infrastructure code, a new unified agent and broader infrastructure support.
For IoT to grow as quickly as analyst firms’ project, a lot is going to fall on developers to quickly bring applications to market. But the lack of a standard development platform threatens to slow growth and make application development more time consuming and costly, much like we’ve seen in the mobile space. In his session at @ThingsExpo, Mike Weiner, Product Manager of the Omega DevCloud with KORE Telematics Inc., discussed the evolving requirements for developers as IoT matures and conducte...
Container technology is sending shock waves through the world of cloud computing. Heralded as the 'next big thing,' containers provide software owners a consistent way to package their software and dependencies while infrastructure operators benefit from a standard way to deploy and run them. Containers present new challenges for tracking usage due to their dynamic nature. They can also be deployed to bare metal, virtual machines and various cloud platforms. How do software owners track the usag...
Explosive growth in connected devices. Enormous amounts of data for collection and analysis. Critical use of data for split-second decision making and actionable information. All three are factors in making the Internet of Things a reality. Yet, any one factor would have an IT organization pondering its infrastructure strategy. How should your organization enhance its IT framework to enable an Internet of Things implementation? In his session at @ThingsExpo, James Kirkland, Red Hat's Chief Arch...
Providing the needed data for application development and testing is a huge headache for most organizations. The problems are often the same across companies - speed, quality, cost, and control. Provisioning data can take days or weeks, every time a refresh is required. Using dummy data leads to quality problems. Creating physical copies of large data sets and sending them to distributed teams of developers eats up expensive storage and bandwidth resources. And, all of these copies proliferating...