Focus Graphite Files Lac Knife Graphite Project Feasibility Study Technical Report

Weighs lower-cost options for tandem financing of mine/plant and purification facilities for high value "battery grade" graphite production

OTTAWA, ONTARIO -- (Marketwired) -- 08/08/14 -- Focus Graphite Inc. ("Focus" or the "Company") (TSX VENTURE:FMS)(OTCQX:FCSMF)(FRANKFURT:FKC) sole owner of the Lac Knife, Quebec high purity graphite deposit announced today that the Feasibility Report prepared in accordance with National Instrument 43-101and with form 43-101F1 will be filed under the Company's SEDAR profile on Friday August 8th, 2014 at www.sedar.com and on Focus' website (www.focusgraphite.com).

The Feasibility Study was prepared by Met-Chem Canada Inc. with contributions from AGP Mining Consultants, Journeaux Associates and Golder Associates.

Don Baxter, Focus' President and Chief Operating Officer said: "With the Feasibility Study now completed, we continue to de-risk the project by focusing on key, near to mid-term milestones, including: detailed engineering, project financing, and the permitting process.

"In particular," he added, "the Feasibility Study opens the door to another level of available financing.

"We are evaluating options to secure project financing that will enable us to advance the Lac Knife mine and plant construction."

Mr. Baxter said discussions with potential offtake partners are ongoing and will complement the existing 10-year offtake signed in December, 2013.

The highlights of the Feasibility Study, as reported June 25, 2014:


---------------------------------------------------------------------------
Table 1                                                                    
---------------------------------------------------------------------------
Lac Knife Feasibility Results                                              
 (Pre-Tax)                           Base Case    2016 Forecast   Units    
---------------------------------------------------------------------------
Average Price / Tonne of             $1,713       $2,256          US$      
 Concentrate:                                                              
---------------------------------------------------------------------------
Internal Rate of Return (IRR)        30.1         41.8            %        
---------------------------------------------------------------------------
Net Present Value @ 6% Discounted    510          809             $ million
 Cash Flow                                                                 
---------------------------------------------------------------------------
Net Present Value @ 8% Discounted    383          624             $ million
 Cash Flow                                                                 
---------------------------------------------------------------------------
Net Present Value @ 10% Discounted   291          488             $ million
 Cash Flow                                                                 
---------------------------------------------------------------------------
Payback Period                       3.0          2.1             Years    
---------------------------------------------------------------------------
Lac Knife Feasibility Results        Base Case    2016 Forecast   Units    
 (After-Tax)                                                               
---------------------------------------------------------------------------
Internal Rate of Return (IRR)        24.1         32.8            %        
---------------------------------------------------------------------------
Net Present Value @ 6% Discounted    304          476             $ million
 Cash Flow                                                                 
---------------------------------------------------------------------------
Net Present Value @ 8% Discounted    224          364             $ million
 Cash Flow                                                                 
---------------------------------------------------------------------------
Net Present Value @ 10% Discounted   165          280             $ million
 Cash Flow                                                                 
---------------------------------------------------------------------------
Payback Period                       3.2          2.4             Years    
---------------------------------------------------------------------------
All monetary values are in Canadian Dollars ("CDN") except where specified 
 otherwise                                                                 
---------------------------------------------------------------------------

Of note is that average prices used in the financial model do not include value added products produced using the typically lower valued finer natural flake graphite.

Background:

The Feasibility Study was conducted with engineering and estimation methods appropriate to target an accuracy of 15% that is standard and realistic for capital and operating cost estimates for this level of study, that is required prior to detailed engineering, and well beyond the +/- 30% accuracy of a Preliminary Economic Assessment (PEA). Based on an extensive risk review exercise the contingency is 11.5%. Capital Expenditures in Table 2 itemize cost requirements for mine construction, processing plant, power line and all associated infrastructure estimated at $165.55 million.


---------------------------------------------------------------------
Table 2                                                              
---------------------------------------------------------------------
Lac Knife Capital Expenditure - Cost Centers            CDN$ millions
---------------------------------------------------------------------
Mine equipment, infrastructure, and pre-stripping       4.21         
---------------------------------------------------------------------
Infrastructure                                          11.62        
---------------------------------------------------------------------
Primary Crushing                                        7.02         
---------------------------------------------------------------------
Concentrator                                            62.24        
---------------------------------------------------------------------
Environmental and Tailings Management                   8.22         
---------------------------------------------------------------------
Additional Infrastructure                               15.4         
---------------------------------------------------------------------
Indirect Costs                                          39.77        
---------------------------------------------------------------------
Contingency (11.5%)                                     17.07        
---------------------------------------------------------------------
Sub Total                                               165.55       
---------------------------------------------------------------------

The company is continuing discussions with vendors to define financing packages for equipment. The company's aim is to reduce up front capital and add to the basket of financing options currently being investigated. Discussions and due diligence continue regarding Supply Chain Financing ("SCF") based on the offtake agreement signed in December, 2013 for a minimum of 50% of Lac Knife's production over the life of a 10-year agreement. SCF is a non-dilutive alternative to equity financing and is less encumbering than traditional debt, or royalty financing.

Future off-take agreements will contain a financial component. This project-financing alternative could include equity and low interest debt as well as a signing bonus to execute an offtake agreement. The various options discussed above have the potential to enhance future project economic evaluation metrics, and the company continues these discussions with several interested parties.

Qualified Persons

The technical information within this news release was approved by Project Leader Mary-Jean Buchanan Eng., and Jeffrey Cassoff Eng., Lead Mining Engineer, and Ewald Pengel P. Eng., Senior Metallurgist, who was responsible for concentrator design, of Met-Chem Canada Inc. all Qualified Persons under NI 43-101 guidelines and independent of the issuer. Pierre Desautels, P.Geo., of AGP Inc. completed the NI- 43-101 Mineral Resource Estimate and is independent of the issuer.

The technical information in this news release was prepared by Mr. Don Baxter, P. Eng., Focus President & Chief Operating Officer, a Qualified Person as defined by NI 43-101 guidelines, who has reviewed and approved the technical content of this news release.

About Focus Graphite

Focus Graphite Inc. is an emerging mining development company with an objective to produce value added products initially for the lithium ion battery market from the Lac Knife graphite deposit located south west of Fermont, Quebec. The Lac Knife project hosts a NI 43-101 compliant Measured and Indicated Mineral Resource Estimate(i) of 9.6 million tonnes grading 14.77% graphitic carbon (Cg) as natural flake graphite with an additional Inferred Mineral Resource Estimate(i) of 3.1 million tonnes grading 13.25% Cg. Focus' goal is to assume an industry leadership position by becoming a low-cost producer of technology-grade graphite. The Feasibility Study filed with SEDAR on August 8, 2014 for the Lac Knife Project indicates the project is economically viable and has the potential to become a low cost graphite producer based on 7.86 million tonnes (429,000 tonnes Proven and 7,428,000 tonnes Probable) of Proven and Probable Reserves grading 15.13 Cg. On May 27, 2014 the Company announced the Potential for High Value Added Sales in the Li-Ion Battery Sector following battery coin cell tests performed on Lac Knife Spherical Graphite ("SPG"). Testing measured the performance metrics and confirmed Focus' capability to tailor lithium ion battery anode grade graphite and value added products to meet the most stringent customer specifications. Focus Graphite is a technology-oriented enterprise with a vision for building long-term, sustainable shareholder value. Focus also holds a significant equity position in graphene applications developer Grafoid Inc.

(i) Mineral resources are not mineral reserves and do not have demonstrated economic viability

Forward Looking Statement

This news release contains "forward-looking information" within the meaning of Canadian securities legislation. All information contained herein that is not clearly historical in nature may constitute forward-looking information. Generally, such forward-looking information can be identified by the use of forward-looking terminology such as "plans", "expects" or "does not expect", "is expected", "budget", "scheduled", "estimates", "forecasts", "intends", "anticipates" or "does not anticipate", or "believes", or variations of such words and phrases or state that certain actions, events or results "may", "could", "would", "might" or "will be taken", "occur" or "be achieved". Forward-looking information is subject to known and unknown risks, uncertainties and other factors that may cause the actual results, level of activity, performance or achievements of the Company to be materially different from those expressed or implied by such forward-looking information, including but not limited to: (i) volatile stock price; (ii) the general global markets and economic conditions; (iii) the possibility of write-downs and impairments; (iv) the risk associated with exploration, development and operation of mineral deposits; (v) the risk associated with establishing title to mineral properties and assets; (vi) the risks associated with entering into joint ventures; (vii) fluctuations in commodity prices; (viii) the risks associated with uninsurable risks arising during the course of exploration, development and production; (ix) competition faced by the resulting issuer in securing experienced personnel and financing; (x) access to adequate infrastructure to support mining, processing, development and exploration activities;

(xi) the risks associated with changes in the mining regulatory regime governing the resulting issuer; (xii) the risks associated with the various environmental regulations the resulting issuer is subject to; (xiii) risks related to regulatory and permitting delays; (xiv) risks related to potential conflicts of interest; (xv) the reliance on key personnel; (xvi) liquidity risks; (xvii) the risk of potential dilution through the issue of common shares; (xviii) the Company does not anticipate declaring dividends in the near term; (xix) the risk of litigation; and (xx) risk management. Forward-looking information is based on assumptions management believes to be reasonable at the time such statements are made, including but not limited to, continued exploration activities, no material adverse change in metal prices, exploration and development plans proceeding in accordance with plans and such plans achieving their stated expected outcomes, receipt of required regulatory approvals, and such other assumptions and factors as set out herein. Although the Company has attempted to identify important factors that could cause actual results to differ materially from those contained in the forward-looking information, there may be other factors that cause results not to be as anticipated, estimated or intended. There can be no assurance that such forward-looking information will prove to be accurate, as actual results and future events could differ materially from those anticipated in such forward-looking information. Such forward-looking information has been provided for the purpose of assisting investors in understanding the Company's business, operations and exploration plans and may not be appropriate for other purposes. Accordingly, readers should not place undue reliance on forward-looking information. Forward-looking information is made as of the date of this news release, and the Company does not undertake to update such forward-looking information except in accordance with applicable securities laws.

More Stories By Marketwired .

Copyright © 2009 Marketwired. All rights reserved. All the news releases provided by Marketwired are copyrighted. Any forms of copying other than an individual user's personal reference without express written permission is prohibited. Further distribution of these materials is strictly forbidden, including but not limited to, posting, emailing, faxing, archiving in a public database, redistributing via a computer network or in a printed form.

Latest Stories
Today we can collect lots and lots of performance data. We build beautiful dashboards and even have fancy query languages to access and transform the data. Still performance data is a secret language only a couple of people understand. The more business becomes digital the more stakeholders are interested in this data including how it relates to business. Some of these people have never used a monitoring tool before. They have a question on their mind like “How is my application doing” but no id...
Actian Corporation has announced the latest version of the Actian Vector in Hadoop (VectorH) database, generally available at the end of July. VectorH is based on the same query engine that powers Actian Vector, which recently doubled the TPC-H benchmark record for non-clustered systems at the 3000GB scale factor (see tpc.org/3323). The ability to easily ingest information from different data sources and rapidly develop queries to make better business decisions is becoming increasingly importan...
The 19th International Cloud Expo has announced that its Call for Papers is open. Cloud Expo, to be held November 1-3, 2016, at the Santa Clara Convention Center in Santa Clara, CA, brings together Cloud Computing, Big Data, Internet of Things, DevOps, Digital Transformation, Microservices and WebRTC to one location. With cloud computing driving a higher percentage of enterprise IT budgets every year, it becomes increasingly important to plant your flag in this fast-expanding business opportuni...
Qosmos has announced new milestones in the detection of encrypted traffic and in protocol signature coverage. Qosmos latest software can accurately classify traffic encrypted with SSL/TLS (e.g., Google, Facebook, WhatsApp), P2P traffic (e.g., BitTorrent, MuTorrent, Vuze), and Skype, while preserving the privacy of communication content. These new classification techniques mean that traffic optimization, policy enforcement, and user experience are largely unaffected by encryption. In respect wit...
Deploying applications in hybrid cloud environments is hard work. Your team spends most of the time maintaining your infrastructure, configuring dev/test and production environments, and deploying applications across environments – which can be both time consuming and error prone. But what if you could automate provisioning and deployment to deliver error free environments faster? What could you do with your free time?
SYS-CON Events announced today that Hitrons Solutions will exhibit at the 19th International Cloud Expo, which will take place on November 1–3, 2016, at the Santa Clara Convention Center in Santa Clara, CA. Hitrons Solutions Inc. is distributor in the North American market for unique products and services of small and medium-size businesses, including cloud services and solutions, SEO marketing platforms, and mobile applications.
Smart Cities are here to stay, but for their promise to be delivered, the data they produce must not be put in new siloes. In his session at @ThingsExpo, Mathias Herberts, Co-founder and CTO of Cityzen Data, will deep dive into best practices that will ensure a successful smart city journey.
SYS-CON Events announced today that 910Telecom will exhibit at the 19th International Cloud Expo, which will take place on November 1–3, 2016, at the Santa Clara Convention Center in Santa Clara, CA. Housed in the classic Denver Gas & Electric Building, 910 15th St., 910Telecom is a carrier-neutral telecom hotel located in the heart of Denver. Adjacent to CenturyLink, AT&T, and Denver Main, 910Telecom offers connectivity to all major carriers, Internet service providers, Internet backbones and ...
SYS-CON Events announced today that eCube Systems, a leading provider of middleware modernization, integration, and management solutions, will exhibit at @DevOpsSummit at 19th International Cloud Expo, which will take place on November 1–3, 2016, at the Santa Clara Convention Center in Santa Clara, CA. eCube Systems offers a family of middleware evolution products and services that maximize return on technology investment by leveraging existing technical equity to meet evolving business needs. ...
DevOps at Cloud Expo – being held November 1-3, 2016, at the Santa Clara Convention Center in Santa Clara, CA – announces that its Call for Papers is open. Born out of proven success in agile development, cloud computing, and process automation, DevOps is a macro trend you cannot afford to miss. From showcase success stories from early adopters and web-scale businesses, DevOps is expanding to organizations of all sizes, including the world's largest enterprises – and delivering real results. Am...
Pulzze Systems was happy to participate in such a premier event and thankful to be receiving the winning investment and global network support from G-Startup Worldwide. It is an exciting time for Pulzze to showcase the effectiveness of innovative technologies and enable them to make the world smarter and better. The reputable contest is held to identify promising startups around the globe that are assured to change the world through their innovative products and disruptive technologies. There w...
Internet of @ThingsExpo, taking place November 1-3, 2016, at the Santa Clara Convention Center in Santa Clara, CA, is co-located with 19th Cloud Expo and will feature technical sessions from a rock star conference faculty and the leading industry players in the world. The Internet of Things (IoT) is the most profound change in personal and enterprise IT since the creation of the Worldwide Web more than 20 years ago. All major researchers estimate there will be tens of billions devices - comp...
DevOps at Cloud Expo, taking place Nov 1-3, 2016, at the Santa Clara Convention Center in Santa Clara, CA, is co-located with 19th Cloud Expo and will feature technical sessions from a rock star conference faculty and the leading industry players in the world. The widespread success of cloud computing is driving the DevOps revolution in enterprise IT. Now as never before, development teams must communicate and collaborate in a dynamic, 24/7/365 environment. There is no time to wait for long dev...
SYS-CON Events announced today that StarNet Communications will exhibit at the 19th International Cloud Expo, which will take place on November 1–3, 2016, at the Santa Clara Convention Center in Santa Clara, CA. StarNet Communications’ FastX is the industry first cloud-based remote X Windows emulator. Using standard Web browsers (FireFox, Chrome, Safari, etc.) users from around the world gain highly secure access to applications and data hosted on Linux-based servers in a central data center. ...
Traditional on-premises data centers have long been the domain of modern data platforms like Apache Hadoop, meaning companies who build their business on public cloud were challenged to run Big Data processing and analytics at scale. But recent advancements in Hadoop performance, security, and most importantly cloud-native integrations, are giving organizations the ability to truly gain value from all their data. In his session at 19th Cloud Expo, David Tishgart, Director of Product Marketing ...