Continental Gold Reports on Second Quarter 2014

TORONTO, ONTARIO -- (Marketwired) -- 08/08/14 -- Continental Gold Limited (TSX:CNL)(OTCQX:CGOOF) ("Continental" or the "Company") is pleased to report the following highlights for the second quarter of 2014 and updates for the Buritica project in Antioquia, Colombia. The Company remains debt-free and well-funded, ending the quarter with US$93.3 million in its treasury.

Second Quarter 2014 Highlights and Subsequent Events

Resource Update

--  On May 13, 2014, the Company announced an updated mineral resource
    estimate for the Buritica project: 

----------------------------------------------------------------------------
 Combined Yaragua and Veta Sur Mineral Resources above a 3 g/t gold cut-off,
                           as at December 31, 2013                          
----------------------------------------------------------------------------
----------------------------------------------------------------------------
                   M                 AuEq                        AuEq       
Category      tonnes Au g/t Ag g/t    g/t   Zn % Au Moz Ag Moz    Moz Zn Mlb
----------------------------------------------------------------------------
Measured        0.99   20.4     48   21.4   0.7%   0.65   1.54   0.68   15.0
----------------------------------------------------------------------------
Indicated       7.41    9.0     29    9.6   0.5%   2.15   6.89   2.29   75.1
----------------------------------------------------------------------------
M & I           8.39   10.4     31   11.0   0.5%   2.80   8.43   2.97   90.1
----------------------------------------------------------------------------
Inferred        16.7    7.8     24    8.2   0.3%    4.2   13.1    4.4    111
----------------------------------------------------------------------------
----------------------------------------------------------------------------
Notes - Reported tonnage and grade figures have been rounded from raw       
estimates to reflect the order of accuracy of the estimate. Minor variations
may occur during the addition of rounded numbers. There have been no        
assumptions made as to metal prices or recoveries in this mineral resource  
estimate other than in gold equivalents that are calculated for AuEq = Au+  
Ag/50. M in Figures and Tables represents millions.                         
----------------------------------------------------------------------------

--  The Company subsequently filed with Canadian securities regulators an
    independent technical report prepared in accordance with National
    Instrument 43-101 entitled "Independent Technical Report and Resource
    Estimate on the Buritica Gold Project 2013" (the "Technical Report"),
    containing the updated mineral resource estimates. The Technical Report,
    dated June 25, 2014, with an effective date of December 31, 2013, was
    prepared for the Company by Andrew J Vigar, BappSc Geo, FAusIMM, MSEG,
    and Martin Recklies, BappSC Geo, MAIG, each of Mining Associates Pty
    Limited. 

Exploration

--  Approximately 12,701 metres of diamond drilling was completed during the
    quarter, for an overall project life total of approximately 243,531
    metres as at June 30, 2014. 
    
--  Underground drilling from the Higabra Valley Tunnel commenced during the
    quarter. Initially, shallowly-inclined drill-holes are planned to
    transect the entire vein system in Yaragua at elevations ranging from
    1,000 - 1,300 metres above sea-level. 
    
--  The Company reported positive drilling results for the Yaragua and Veta
    Sur vein systems. Drilling was successful in extending and infilling
    vein families in the Yaragua and Veta Sur vein systems. Drill results
    included: BUUY270, which intersected 2.2 metres @ 2,615.4 g/t gold and
    388 g/t silver; and BUUY210, which intersected 6.9 metres @ 97.8 g/t
    gold and 238 g/t silver. 
    
--  Drilling at the Laurel vein system was successful at extending the
    potential target dimensions of Laurel to approximately 1,100 metres
    along strike x 1,000 metres vertically. Drill results included:
    BUSY361D01, which intersected 8.3 metres @ 6.1 g/t gold and 23 g/t
    silver; and BUUY258, which intersected 1.45 metres @ 84 g/t gold and 7
    g/t silver. 

Pre-Development

--  The Company advanced underground development of the Higabra Valley
    Tunnel to near completion. The tunnel is intended to serve as the main
    access tunnel from the proposed mine to the processing facilities in the
    Higabra Valley, situated at an average elevation of 1,150 metres above
    sea-level elevation. Advancing rates improved steadily after passing
    through the Tonusco fault (the main regional fault in the area) early in
    the second quarter. 
    
--  On May 12, 2014, the Company announced the signing of formalization sub-
    contracts with five of eight small-scale mining associations, paving the
    way for the implementation of legal and responsible small-scale mining
    operations at the Buritica project. The remaining formalization sub-
    contracts were executed subsequent to May 12, 2014. 
    
--  Underground development from the Veta Sur Ramp resumed and, on June 4,
    2014, the Company announced plans to develop a 400-metre cross-cut off
    of the Veta Sur Ramp transecting the entire Veta Sur vein package.
    Development work of this cross-cut began early in the third quarter. 
    
--  The Company announced that it had commenced a Preliminary Economic
    Assessment ("PEA") on the Buritica project to be completed in Q4 2014.
    The PEA will be the first economic study for Buritica to determine the
    potential mining and processing parameters and associated capital
    expenditures and operating costs for the project. The PEA is intended to
    be a preliminary step and is an addition to, and not a replacement,
    substitute or proxy for the previously-announced Pre-Feasibility Study
    ("PFS"), which the Company still plans to complete in the second half of
    2015. 
    
--  Many of the pre-development activities at the Buritica project continued
    throughout the second quarter, including advancing the following studies
    which will form the foundation of the PEA and PFS: civil, metallurgical,
    hydrological, geotechnical, water management and electrical studies. 

Corporate

--  On April 4, 2014, Robert W. Allen, founding Chairman and director,
    announced his retirement from the Board of Directors (the "Board"). 
    
--  Concurrently with the retirement of Mr. Allen, Leon Teicher was named
    the Company's new non-executive Chairman and Gustavo Koch, Executive
    Vice-President of the Company, was appointed to the Board as an
    executive director. 
    
--  Jaime Gutierrez resigned from the Board, effective June 4, 2014. 
    
--  On July 30, 2014, the Company announced the appointment of Dr. Claudia
    Jimenez to the Board. 
    
--  On June 17, 2014, the Company announced the following additions to its
    management team: Andres Osorio Anaya; Vice-President and General
    Manager; Mauricio Carrillo; Vice-President, Project Development; and
    Julian Gonzales; Vice-President, Sustainability. 

About Continental

Continental Gold Limited is an advanced-stage exploration and development company with an extensive portfolio of 100%-owned gold projects in Colombia. Spearheaded by a team with over 40 years of exploration and mining experience in Colombia, the Company is focused on advancing its high-grade Buritica gold project to production.

In August 2012, Continental achieved an important milestone, receiving formal approval for the modification of its existing Environmental Impact Assessment. The amendment allows the Company to build a six-kilometre switchback road and begin underground development by constructing a one-kilometre access tunnel. With a goal of being the newest hard rock gold producer in Colombia, Continental has achieved major advances with the access tunnel, which is providing access for underground drilling and will eventually be used for commercial production. A Phase V drill program is underway at the Buritica project to further delineate the mineral resources and drill new target zones identified within its concessions.

For additional technical information on the Buritica project, please refer to the Technical Report, which is available on SEDAR at www.sedar.com, on the OTCQX at www.otcmarkets.com and on the Company website at www.continentalgold.com.

Additional details on the Buritica project and the rest of Continental's suite of exploration properties are available at www.continentalgold.com.

The scientific and technical information contained in this press release has been reviewed and approved by Mark Moseley-Williams, President and Chief Operating Officer of the Company, who is a qualified person within the meaning of National Instrument 43-101 -Standards of Disclosure for Mineral Projects.

Forward-Looking Statements

This press release contains or refers to forward-looking information under Canadian securities legislation, including statements regarding the estimation of mineral resources, exploration results, potential mineralization, the anticipated completion of a PEA and PFS, and exploration and mine development plans, and is based on current expectations that involve a number of business risks and uncertainties. Forward-looking statements are subject to significant risks and uncertainties, and other factors that could cause actual results to differ materially from expected results. Readers should not place undue reliance on forward-looking statements. Factors that could cause actual results to differ materially from any forward-looking statement include, but are not limited to, failure to convert estimated mineral resources to reserves, capital and operating costs varying significantly from estimates, the preliminary nature of metallurgical test results, delays in obtaining or failures to obtain required governmental, environmental or other project approvals, political risks, uncertainties relating to the availability and costs of financing needed in the future, changes in equity markets, inflation, changes in exchange rates, fluctuations in commodity prices, delays in the development of projects and the other risks involved in the mineral exploration and development industry forward-looking statements are subject to significant risks and uncertainties, and other factors that could cause actual results to differ materially from expected results. These forward-looking statements are made as of the date hereof and the Company assumes no responsibility to update them or revise them to reflect new events or circumstances other than as required by law.

Differences in Reporting of Resource Estimates

This press release was prepared in accordance with Canadian standards, which differ in some respects from United States standards. In particular, and without limiting the generality of the foregoing, the terms "inferred mineral resources," "indicated mineral resources," "measured mineral resources" and "mineral resources" used or referenced in this press release are Canadian mining terms as defined in accordance with National Instrument 43-101 - Standards of Disclosure for Mineral Projects under the guidelines set out in the Canadian Institute of Mining, Metallurgy and Petroleum (the "CIM") Standards on Mineral Resources and Mineral Reserves (the "CIM Standards"). The CIM Standards differ significantly from standards in the United States. While the terms "mineral resource," "measured mineral resources," "indicated mineral resources," and "inferred mineral resources" are recognized and required by Canadian regulations, they are not defined terms under standards in the United States. "Inferred mineral resources" have a great amount of uncertainty as to their existence, and great uncertainty as to their economic and legal feasibility. It cannot be assumed that all or any part of an inferred mineral resource will ever be upgraded to a higher category. Under Canadian securities laws, estimates of inferred mineral resources may not form the basis of feasibility or other economic studies. Readers are cautioned not to assume that all or any part of measured or indicated mineral resources will ever be converted into reserves. Readers are also cautioned not to assume that all or any part of an inferred mineral resource exists, or is economically or legally mineable. Disclosure of "contained ounces" in a resource is permitted disclosure under Canadian regulations; however, United States companies are only permitted to report mineralization that does not constitute "reserves" by standards in the United States as in place tonnage and grade without reference to unit measures. Accordingly, information regarding resources contained or referenced in this press release containing descriptions of our mineral deposits may not be comparable to similar information made public by United States companies.

Contacts:
Continental Gold Limited
+1.416.583.5610
[email protected]
www.continentalgold.com

More Stories By Marketwired .

Copyright © 2009 Marketwired. All rights reserved. All the news releases provided by Marketwired are copyrighted. Any forms of copying other than an individual user's personal reference without express written permission is prohibited. Further distribution of these materials is strictly forbidden, including but not limited to, posting, emailing, faxing, archiving in a public database, redistributing via a computer network or in a printed form.

Latest Stories
SYS-CON Events announced today that Daiya Industry will exhibit at the Japan External Trade Organization (JETRO) Pavilion at SYS-CON's 21st International Cloud Expo®, which will take place on Oct 31 – Nov 2, 2017, at the Santa Clara Convention Center in Santa Clara, CA. Daiya Industry specializes in orthotic support systems and assistive devices with pneumatic artificial muscles in order to contribute to an extended healthy life expectancy. For more information, please visit https://www.daiyak...
SYS-CON Events announced today that Fusic will exhibit at the Japan External Trade Organization (JETRO) Pavilion at SYS-CON's 21st International Cloud Expo®, which will take place on Oct 31 – Nov 2, 2017, at the Santa Clara Convention Center in Santa Clara, CA. Fusic Co. provides mocks as virtual IoT devices. You can customize mocks, and get any amount of data at any time in your test. For more information, visit https://fusic.co.jp/english/.
SYS-CON Events announced today that Keisoku Research Consultant Co. will exhibit at the Japan External Trade Organization (JETRO) Pavilion at SYS-CON's 21st International Cloud Expo®, which will take place on Oct 31 – Nov 2, 2017, at the Santa Clara Convention Center in Santa Clara, CA. Keisoku Research Consultant, Co. offers research and consulting in a wide range of civil engineering-related fields from information construction to preservation of cultural properties. For more information, vi...
SYS-CON Events announced today that MIRAI Inc. will exhibit at the Japan External Trade Organization (JETRO) Pavilion at SYS-CON's 21st International Cloud Expo®, which will take place on Oct 31 – Nov 2, 2017, at the Santa Clara Convention Center in Santa Clara, CA. MIRAI Inc. are IT consultants from the public sector whose mission is to solve social issues by technology and innovation and to create a meaningful future for people.
SYS-CON Events announced today that Interface Corporation will exhibit at the Japan External Trade Organization (JETRO) Pavilion at SYS-CON's 21st International Cloud Expo®, which will take place on Oct 31 – Nov 2, 2017, at the Santa Clara Convention Center in Santa Clara, CA. Interface Corporation is a company developing, manufacturing and marketing high quality and wide variety of industrial computers and interface modules such as PCIs and PCI express. For more information, visit http://www.i...
Today companies are looking to achieve cloud-first digital agility to reduce time-to-market, optimize utilization of resources, and rapidly deliver disruptive business solutions. However, leveraging the benefits of cloud deployments can be complicated for companies with extensive legacy computing environments. In his session at 21st Cloud Expo, Craig Sproule, founder and CEO of Metavine, will outline the challenges enterprises face in migrating legacy solutions to the cloud. He will also prese...
SYS-CON Events announced today that Ryobi Systems will exhibit at the Japan External Trade Organization (JETRO) Pavilion at SYS-CON's 21st International Cloud Expo®, which will take place on Oct 31 – Nov 2, 2017, at the Santa Clara Convention Center in Santa Clara, CA. Ryobi Systems Co., Ltd., as an information service company, specialized in business support for local governments and medical industry. We are challenging to achive the precision farming with AI. For more information, visit http:...
SYS-CON Events announced today that Enroute Lab will exhibit at the Japan External Trade Organization (JETRO) Pavilion at SYS-CON's 21st International Cloud Expo®, which will take place on Oct 31 – Nov 2, 2017, at the Santa Clara Convention Center in Santa Clara, CA. Enroute Lab is an industrial design, research and development company of unmanned robotic vehicle system. For more information, please visit http://elab.co.jp/.
Elon Musk is among the notable industry figures who worries about the power of AI to destroy rather than help society. Mark Zuckerberg, on the other hand, embraces all that is going on. AI is most powerful when deployed across the vast networks being built for Internets of Things in the manufacturing, transportation and logistics, retail, healthcare, government and other sectors. Is AI transforming IoT for the good or the bad? Do we need to worry about its potential destructive power? Or will we...
SYS-CON Events announced today that Nihon Micron will exhibit at the Japan External Trade Organization (JETRO) Pavilion at SYS-CON's 21st International Cloud Expo®, which will take place on Oct 31 – Nov 2, 2017, at the Santa Clara Convention Center in Santa Clara, CA. Nihon Micron Co., Ltd. strives for technological innovation to establish high-density, high-precision processing technology for providing printed circuit board and metal mount RFID tags used for communication devices. For more inf...
SYS-CON Events announced today that mruby Forum will exhibit at the Japan External Trade Organization (JETRO) Pavilion at SYS-CON's 21st International Cloud Expo®, which will take place on Oct 31 – Nov 2, 2017, at the Santa Clara Convention Center in Santa Clara, CA. mruby is the lightweight implementation of the Ruby language. We introduce mruby and the mruby IoT framework that enhances development productivity. For more information, visit http://forum.mruby.org/.
In his session at @ThingsExpo, Greg Gorman is the Director, IoT Developer Ecosystem, Watson IoT, will provide a short tutorial on Node-RED, a Node.js-based programming tool for wiring together hardware devices, APIs and online services in new and interesting ways. It provides a browser-based editor that makes it easy to wire together flows using a wide range of nodes in the palette that can be deployed to its runtime in a single-click. There is a large library of contributed nodes that help so...
DevOps at Cloud Expo – being held October 31 - November 2, 2017, at the Santa Clara Convention Center in Santa Clara, CA – announces that its Call for Papers is open. Born out of proven success in agile development, cloud computing, and process automation, DevOps is a macro trend you cannot afford to miss. From showcase success stories from early adopters and web-scale businesses, DevOps is expanding to organizations of all sizes, including the world's largest enterprises – and delivering real r...
With major technology companies and startups seriously embracing Cloud strategies, now is the perfect time to attend 21st Cloud Expo October 31 - November 2, 2017, at the Santa Clara Convention Center, CA, and June 12-14, 2018, at the Javits Center in New York City, NY, and learn what is going on, contribute to the discussions, and ensure that your enterprise is on the right path to Digital Transformation.
Your clients expect transactions to never fail, cloud access to be fast and always on, and their data to be protected - no exceptions. Hear about how Secure Service Container (SSC), an IBM-exclusive open technology, enables secure building and hosting of next-generation applications, both cloud and on-premises. SSC protects the full stack from external and insider threats, allows automatic encryption of data in-flight and at-rest, and is tamper-resistant during installation and runtime – with no...