Click here to close now.




















Welcome!

News Feed Item

Pure Gold Commences Drilling at the Madsen Gold Project

9,000 Metre Diamond Drill Program Underway

VANCOUVER, BRITISH COLUMBIA -- (Marketwired) -- 08/22/14 -- Pure Gold Mining Inc. (TSX VENTURE:PGM) ("Pure Gold" or the "Company") is pleased to announce that drilling has commenced at its 100% owned Madsen Gold Project ("Madsen" or the "Project"), located in the prolific Red Lake gold district of northwest Ontario. The $4.0 million exploration program, which includes 9,000 metres of diamond drilling, is designed to test and expand the current mineral resources(1 ), while concurrently testing for high-grade, 8 Zone-style targets developed through ongoing consolidation and evaluation of the large historic database.

Initial drilling will be focused on near-surface step out drilling around the high-grade mineralization along the 12-km long Madsen Mine Trend. The first target to be drilled is McVeigh Ramp, targeting the projected downward extension of McVeigh. Other targets to be drilled include the Fork Zone, Junction and Point (see news release dated August 7 for more details regarding the targets to be drilled). Russet South, along the 10-km ultramafic target and up dip from 8 Zone, and a number of other high priority targets will be tested later on in the year. All of the drill targets are located on patented ground and are easily accessed.

In addition to drilling, Pure Gold continues to build a conceptual targeting model designed to expand existing targets and identify new targets along the 12 km-long Madsen unconformity and the 10 km-long ultramafic contact within the Project area. Pure Gold's conceptual targeting model incorporates data derived from a geological Footprint Modelling program, a 1,643 line-kilometre helicopter-borne geophysics survey, structural mapping, and a robust geochemical soil and rock sampling program.

ABOUT THE MADSEN GOLD PROJECT

Owned 100% by Pure Gold, Madsen is located in the Red Lake gold district of northwest Ontario and is over 50 square kilometres in size, which makes it the third largest land package in the Red Lake region.

The Project is host to two past-producing mines; existing mine infrastructure, including an operational head frame, a 1,275 metre-deep shaft, and a permitted 500 tonne per day mill; an Indicated mineral resource of 928,000 ounces gold (3.24 million tonnes grading 8.93 g/t gold) and an Inferred mineral resource of 297,000 ounces gold (0.79 million tonnes grading 11.74 g/t gold)(1); and, a number of highly prospective exploration targets in a geological setting analogous to other modern high-grade discoveries in the Red Lake district.

A new interpretation of the role of folded ultramafic contacts and structural controls have resulted in multiple recent discoveries in the Red Lake district, including Goldcorp's High Grade Zone at the Red Lake Mine Complex, the Bruce Channel system at the Cochenour Mine, and the F2 Gold System at Rubicon's Phoenix Mine. The environment and mineralization at Madsen's 8 Zone is similar to other recent high grade discoveries in the district. Recent resampling of historic drilling at the 8 Zone returned 38.26 g/t gold over 7.5 metres (see news release dated July 7, 2014). Pure Gold believes the opportunity exists to apply modern exploration science and a new understanding of the district to achieve similar success along the ultramafic contact at the Madsen Gold Project.

At Madsen, the 10 km-long ultramafic contact is highly prospective for additional high-grade discoveries, and numerous recent discoveries along this contact have only been partially advanced. Pure Gold is pursuing a strategy of exploring for additional near surface high-grade mineralization along the 12 km-long Madsen Mine trend and the 10 km-long ultramafic contact.

(1) See the National Instrument 43-101 technical report entitled "Technical Report for the Madsen Gold Project Red Lake, Ontario, Canada" prepared by SRK Consulting (Canada) Inc. dated effective February 18, 2014. Mineral Resources are not Mineral Reserves and do not have demonstrated economic viability.

Qualified Persons

Darren O'Brien, P.Geo., Vice President, Exploration for the Company, is the designated Qualified Person for this news release within the meaning of National Instrument 43-101 ("NI 43-101") and has reviewed and verified that the technical information contained herein is accurate and approves of the written disclosure of same.

ABOUT PURE GOLD

Our mandate is pure and simple. To dream big. To colour outside the lines. To use smart science and creativity to unlock the next multi-million-ounce gold discovery at the Madsen Gold Project in Red Lake, Ontario. And become Canada's next iconic gold company. Additional information about the Company and its activities may be found on the Company's website at www.puregoldmining.ca and under the Company's profile at www.sedar.com.

ON BEHALF OF THE BOARD

Darin Labrenz, President & CEO

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Certain statements made and information contained in this news release and elsewhere constitutes "forward-looking information" within the meaning of Canadian securities legislation. Any statements that express or involve discussions with respect to predictions, expectations, beliefs, plans, projections, objectives, assumptions or future events or performance are not statements of historical fact and may constitute forward-looking statements. Such forward-looking statements are based on certain assumptions and are subject to risks and uncertainties which could cause actual events or results to differ from those reflected in the forward-looking statements. Such factors include, but are not limited to, fluctuations in the price of gold and other commodities, continued exploration success, risks and uncertainties relating to the interpretation of drill results and the estimation of mineral resources and reserves, the geology, grade and continuity of mineral deposits, the possibility that future exploration and development results will not be consistent with the Company's expectations, changes in government legislation, taxation, controls, regulations and political or economic developments in Canada, risks associated with mining or development activities, the speculative nature of exploration and development, including the risk of obtaining necessary licenses and other risks and uncertainties including those described under Risk Factors in each management discussion and analysis and in the Company's annual information form which are available under the Company's profile at www.sedar.com. Many of these uncertainties and contingencies can affect the Company's actual performance and could cause actual performance to differ materially from those expressed or implied in any forward-looking statements made by, or on behalf of, the Company. Readers are cautioned that forward-looking statements are not guarantees of future performance. There can be no assurance that such statements will prove to be accurate and actual results and future events could differ materially from those acknowledged in such statements. The Company disclaims any intention or obligation to update or revise any forward-looking statements whether as a result of new information, future events or otherwise, except to the extent required by applicable laws. Accordingly, readers are advised not to place undue reliance on forward-looking statements. The Company does not undertake to update any forward-looking statement that may be made from time to time by the Company or on its behalf, except in accordance with applicable securities laws.

More Stories By Marketwired .

Copyright © 2009 Marketwired. All rights reserved. All the news releases provided by Marketwired are copyrighted. Any forms of copying other than an individual user's personal reference without express written permission is prohibited. Further distribution of these materials is strictly forbidden, including but not limited to, posting, emailing, faxing, archiving in a public database, redistributing via a computer network or in a printed form.

Latest Stories
Learn how to solve the problem of keeping files in sync between multiple Docker containers. In his session at 16th Cloud Expo, Aaron Brongersma, Senior Infrastructure Engineer at Modulus, discussed using rsync, GlusterFS, EBS and Bit Torrent Sync. He broke down the tools that are needed to help create a seamless user experience. In the end, can we have an environment where we can easily move Docker containers, servers, and volumes without impacting our applications? He shared his results so yo...
Palerra, the cloud security automation company, announced enhanced support for Amazon AWS, allowing IT security and DevOps teams to automate activity and configuration monitoring, anomaly detection, and orchestrated remediation, thereby meeting compliance mandates within complex infrastructure deployments. "Monitoring and threat detection for AWS is a non-trivial task. While Amazon's flexible environment facilitates successful DevOps implementations, it adds another layer, which can become a ...
With SaaS use rampant across organizations, how can IT departments track company data and maintain security? More and more departments are commissioning their own solutions and bypassing IT. A cloud environment is amorphous and powerful, allowing you to set up solutions for all of your user needs: document sharing and collaboration, mobile access, e-mail, even industry-specific applications. In his session at 16th Cloud Expo, Shawn Mills, President and a founder of Green House Data, discussed h...
The Software Defined Data Center (SDDC), which enables organizations to seamlessly run in a hybrid cloud model (public + private cloud), is here to stay. IDC estimates that the software-defined networking market will be valued at $3.7 billion by 2016. Security is a key component and benefit of the SDDC, and offers an opportunity to build security 'from the ground up' and weave it into the environment from day one. In his session at 16th Cloud Expo, Reuven Harrison, CTO and Co-Founder of Tufin,...
SYS-CON Events announced today that MobiDev, a software development company, will exhibit at the 17th International Cloud Expo®, which will take place November 3–5, 2015, at the Santa Clara Convention Center in Santa Clara, CA. MobiDev is a software development company with representative offices in Atlanta (US), Sheffield (UK) and Würzburg (Germany); and development centers in Ukraine. Since 2009 it has grown from a small group of passionate engineers and business managers to a full-scale mobi...
There are many considerations when moving applications from on-premise to cloud. It is critical to understand the benefits and also challenges of this migration. A successful migration will result in lower Total Cost of Ownership, yet offer the same or higher level of robustness. In his session at 15th Cloud Expo, Michael Meiner, an Engineering Director at Oracle, Corporation, analyzed a range of cloud offerings (IaaS, PaaS, SaaS) and discussed the benefits/challenges of migrating to each offe...
Chuck Piluso presented a study of cloud adoption trends and the power and flexibility of IBM Power and Pureflex cloud solutions. Prior to Secure Infrastructure and Services, Mr. Piluso founded North American Telecommunication Corporation, a facilities-based Competitive Local Exchange Carrier licensed by the Public Service Commission in 10 states, serving as the company's chairman and president from 1997 to 2000. Between 1990 and 1997, Mr. Piluso served as chairman & founder of International Te...
Mobile, social, Big Data, and cloud have fundamentally changed the way we live. “Anytime, anywhere” access to data and information is no longer a luxury; it’s a requirement, in both our personal and professional lives. For IT organizations, this means pressure has never been greater to deliver meaningful services to the business and customers.
In a recent research, analyst firm IDC found that the average cost of a critical application failure is $500,000 to $1 million per hour and the average total cost of unplanned application downtime is $1.25 billion to $2.5 billion per year for Fortune 1000 companies. In addition to the findings on the cost of the downtime, the research also highlighted best practices for development, testing, application support, infrastructure, and operations teams.
In their session at 17th Cloud Expo, Hal Schwartz, CEO of Secure Infrastructure & Services (SIAS), and Chuck Paolillo, CTO of Secure Infrastructure & Services (SIAS), provide a study of cloud adoption trends and the power and flexibility of IBM Power and Pureflex cloud solutions. In his role as CEO of Secure Infrastructure & Services (SIAS), Hal Schwartz provides leadership and direction for the company.
Puppet Labs has announced the next major update to its flagship product: Puppet Enterprise 2015.2. This release includes new features providing DevOps teams with clarity, simplicity and additional management capabilities, including an all-new user interface, an interactive graph for visualizing infrastructure code, a new unified agent and broader infrastructure support.
For IoT to grow as quickly as analyst firms’ project, a lot is going to fall on developers to quickly bring applications to market. But the lack of a standard development platform threatens to slow growth and make application development more time consuming and costly, much like we’ve seen in the mobile space. In his session at @ThingsExpo, Mike Weiner, Product Manager of the Omega DevCloud with KORE Telematics Inc., discussed the evolving requirements for developers as IoT matures and conducte...
Container technology is sending shock waves through the world of cloud computing. Heralded as the 'next big thing,' containers provide software owners a consistent way to package their software and dependencies while infrastructure operators benefit from a standard way to deploy and run them. Containers present new challenges for tracking usage due to their dynamic nature. They can also be deployed to bare metal, virtual machines and various cloud platforms. How do software owners track the usag...
Explosive growth in connected devices. Enormous amounts of data for collection and analysis. Critical use of data for split-second decision making and actionable information. All three are factors in making the Internet of Things a reality. Yet, any one factor would have an IT organization pondering its infrastructure strategy. How should your organization enhance its IT framework to enable an Internet of Things implementation? In his session at @ThingsExpo, James Kirkland, Red Hat's Chief Arch...
Providing the needed data for application development and testing is a huge headache for most organizations. The problems are often the same across companies - speed, quality, cost, and control. Provisioning data can take days or weeks, every time a refresh is required. Using dummy data leads to quality problems. Creating physical copies of large data sets and sending them to distributed teams of developers eats up expensive storage and bandwidth resources. And, all of these copies proliferating...