Paladin Energy: Financial Report for Year Ended 30 June 2014

PERTH, WESTERN AUSTRALIA -- (Marketwired) -- 08/28/14 -- Paladin Energy Ltd ("Paladin" or "the Company") (TSX: PDN)(ASX: PDN) announces the release of its consolidated Financial Report for the year ended 30 June 2014. The Financial Report is appended to this News Release.

HIGHLIGHTS

OPERATIONS


- LHM produced a record 5.592Mlb U3O8 for the year ended 30 June 2014,
  achieving a 6% improvement on the year ended 30 June 2013.

- KM placed on care and maintenance on 26 May 2014 after production ceased
  and circuit clean-up.

- Combined production for the year ended 30 June 2014 of 7.943Mlb (3,603t)
  U3O8 is a decrease of 4% over the year ended 30 June 2013.

- C1 cost of production(1) continues to fall:

  - Langer Heinrich Mine (LHM) C1 cost of production for the year has
    decreased 4% to US$28.8/lb U3O8 from US$30.0/lb U3O8 in the year ended
    30 June 2013.

  - Kayelekera Mine (KM) C1 cost of production has decreased 16% to
    US$35.9/lb U3O8 from US$42.6/lb U3O8 for the year ended 30 June 2013.

- Revised FY2014 production guidance achieved at the upper end of the range.

SALES AND REVENUE


- Sales revenue totalled US$328.8M for the year from sales of 8.665Mlb U3O8.

- Average realised uranium sales price for the year was US$37.9/lb U3O8,
  compared to the average UxC spot price for the period of US$33.9/lb U3O8.

CORPORATE


- Institutional placement of shares in August 2013 raised US$80.7M.

- Sale of a 25% interest in the Langer Heinrich mining operation in Namibia
  to CNNC Overseas Uranium Holding Limited, a wholly-owned subsidiary of
  CNNC, the leading Chinese nuclear utility, for consideration of US$190M
  (completed 23 July 2014).

- Existing US$110M project finance facility and US$20M working capital
  facility refinanced into a new US$70M syndicated loan facility. Net debt
  repayments totalled US$68.8M (for FY2014).

- A number of cost reduction initiatives completed and, as a result,
  administration, marketing and non-production costs decreased by 45% year-
  on-year and total exploration expenditure decreased by 54%. Additional
  measures are yet to be implemented.

- In addition to the impairments of US$255.7M (after tax) for the December
  half year, which mostly comprised of the US$226.5M (after tax) impairment
  of the Queensland exploration assets, further impairments of US$40.6M have
  been recognised primarily for inventory at LHM due to low uranium prices
  and at KM due to its transition to care and maintenance.

EXPLORATION


- Michelin Project - positive mineral resource update with 25% increase in
  Measured and Indicated Resources.

(1) C1 cost of production = cost of production excluding product distribution costs, sales royalties and depreciation and amortisation before adjustment for impairment. C1 cost, which is non-IFRS information, is a widely used 'industry standard' term.

Results

(References below to 2014 and 2013 are to the equivalent year ended 30 June 2014 and 2013 respectively).


- Safety and Sustainability:

  - The 12-month moving average Lost Time Injury Frequency Rate (LTIFR)
    increased from 1.1 to 3.1. This rate is slightly higher than the West
    Australian metalliferous surface mining average LTIFR of 2.3. For
    FY2014, there were 12 LTI's and 2 fatalities as compared to seven LTI's
    for the previous year.

  - A major health and safety review and action plan is underway. This plan
    includes additional staff and resources in the safety area and intense
    in-house training, which is a major initiative for the next 12-24
    months.

- Production:

  - Combined production of 7.943Mlb U3O8 for the year ended 30 June 2014,
    down 4% on the previous year as a result of KM transitioning to care and
    maintenance.

- Langer Heinrich Mine (LHM):

  - Record production for the year of 5.592Mlb, an increase of 6% over the
    previous year:

    - overall recovery of 87% (FY2013: 86%); and

    - feed grades of 783ppm U3O8 (FY2013: 812ppm).

  - LHM C1 cost of production for the year fell to US$28.8/lb U3O8, down 4%
    from US$30.0/lb U3O8 for the previous year.

  - Production constraint due to water supply experienced during the year
    has now been resolved in a sustainable manner and will be optimised in
    the years ahead.

  - Optimisation strategies have produced improved operating performance
    that will be reflected in FY2015 C1 costs.

  - A thorough review of standard operating procedures is underway, that is
    expected to lead to further improvements in operating performance and
    costs.

  - A complete IX resin inventory change has been initiated for the first
    time in the life of the project. This has been done on the basis of
    improved process modelling capability and economic analysis, and will
    lead to reduced C1 costs.

  - The (patent pending) nano-filtration technology developed by Paladin for
    KM will be implemented at LHM in FY2015. This innovation will also
    deliver substantial C1 cost savings.

- Cost Reduction Initiatives:

  - The focus remains on process innovation, where considerable success has
    been achieved to date, and further substantial gains are expected to
    improve unit costs for LHM in the coming year. In particular, leach and
    IX reagents, which represent a high proportion of the current C1 costs,
    offer a significant cost reduction opportunity. The sustained reduction
    in operating costs and improved plant performance demonstrated over the
    past year is a reflection of the proven success of the twin strategies
    of optimisation and innovation.

  - Further cost savings and optimisation initiatives are being implemented
    to reduce corporate costs over FY2015.

  - Target for LHM is C1 cost below US$26/lb by the end of FY2015 and
    US$22/lb in FY2017 (in FY2014 terms).

  - Target for KM on restart is C1 costs below US$30/lb (in FY2014 terms).

- Kayelekera Mine (KM):

  - Production for the year was 2.351Mlb, a decrease of 21% over the year
    ended 30 June 2013, in line with the care and maintenance budget:

    - overall recovery of 86.2% (FY2013: 84.6%); and

    - acid recovery plant (formerly nano-filtration) successfully
      commissioned and continued to improve beyond design criteria.

  - On 7 February 2014, the Company announced that KM would be placed on
    care and maintenance due to falling uranium prices affecting the
    viability of KM and to preserve the remaining ore body. It is expected
    that production will recommence once the uranium price provides a
    sufficient incentive (circa US$75/lb) and a grid power supply is
    available on site to replace the existing diesel generators with lower
    cost hydroelectricity.

  - Placing KM on care and maintenance will improve Paladin's forecast cash
    flow position by US$20M-US$25M in CY2015. Paladin anticipates the
    ongoing cost of maintaining KM on care and maintenance of approximately
    US$16M pa will be funded from proceeds received from the sale of uranium
    oxide on hand and produced during the rundown phase.

  - KM C1 cost of production for the year fell to US$35.9/lb U3O8, down 16%
    from US$42.6/lb U3O8 for the year ended 30 June 2013. Prior to care and
    maintenance, the C1 cost of production for KM had decreased by 17% year-
    on-year from US$39.8/lb in the March 2013 quarter to US$32.9/lb in the
    March 2014 quarter.

  - C1 cost reductions were mainly due to a substantial reduction in acid
    consumption following the commissioning of the acid recovery plant, as
    well as optimising resin-in-pulp and ore blend.

- Profit and Loss:

  - Total sales volume for the year of 8.665Mlb U3O8 reflected a 5% increase
    over sales of 8.253Mlb U3O8 for the year ended 30 June 2013.

  - Sales revenue decreased 19% from US$408.4M in 2013 to US$328.8M for the
    year ended 30 June 2014, as a result of spot price reduction causing a
    23% decrease in realised sales price, partially offset by a 5% increase
    in sales volume. The average realised uranium sales price in the year
    ended 30 June 2014 was US$37.9/lb U3O8 (FY2013: US$49.5/lb U3O8)
    compared to the average UxC spot price for the year of US$33.9/lb U3O8.

  - Gross loss before impairments for the year of US$3.4M, compared to a
    gross profit before impairments in FY2013 of US$55.9M, due primarily to
    lower uranium prices.

  - Care and maintenance resulted in a higher impairment of KM inventory of
    US$40.7M (FY2013: US$30.9M) and lower uranium prices saw an impairment
    of LHM inventory of US$21.0M (FY2013: US$Nil). This was in addition to
    the impairment of Queensland exploration assets at 31 December 2013 of
    US$226.5M after tax. Net loss after tax attributable to members of the
    Group of US$338.4M was recorded for the year.

- Cash Flow:

  - Positive cash flow from operating activities totalled US$10.1M for the
    year after interest payments of US$33.0M and exploration expenditure of
    US$1.7M.

  - Cash outflow from investing activities totalled US$25.3M:

    - plant and equipment acquisitions of US$20.3M, predominantly the new
      tailings facility at LHM and acid recovery plant and tailings pipeline
      at KM; and

    - capitalised exploration expenditure of US$5.8M. Exploration
      expenditure in future periods will be lower.

  - Cash inflow from financing activities of US$26.3M in the year ended 30
    June 2014 is mainly attributable to:

    - the net proceeds received from the share placement of US$78.2M;

    - the US$20M non-refundable deposit received as part of the settlement
      of the sale of a 25% minority interest in Langer Heinrich to CNNC; and

    - net debt repayments of US$68.8M.

- Cash Position:

  - Cash of US$88.8M at 30 June 2014.

  - On 23 July 2014 - completion of the settlement of the sale of a 25%
    interest in the Langer Heinrich mining operation for consideration of
    US$190M. The sale was subject to a number of conditions precedent, which
    were met in full by 30 June 2014. A US$20M deposit was received in April
    2014 with the balance of US$170M received on 23 July 2014.

- Exploration and Development:

  - Manyingee Project, Western Australia - As announced on 14 January 2014,
    a revised Mineral Resources estimate for the Manyingee Deposit was
    completed. The results include an Indicated Mineral Resource of 15.7Mlb
    U3O8 and an Inferred Mineral Resource of 10.2Mlb U3O8, both at an
    average grade of 850ppm U3O8, using a 250ppm and 0.2m minimum thickness
    cut-off. Compared to the previous Mineral Resource estimate announced in
    1999 (reported at a 300ppm U3O8 cut-off), the updated 2014 Mineral
    Resource estimate shows a minor reduction in contained U3O8 for the
    Indicated portion of the Mineral Resource and an increase in the
    Inferred portion of the Mineral Resource. Despite the change in
    disequilibrium factor used to determine uranium grades, which resulted
    in a reduction in the Indicated Mineral Resource material grade, the
    overall grade of the deposit has increased due to revised geological
    modelling and estimation techniques. The Company is preparing a draft
    permit application for advancement of a Field Leach Trial (FLT) to
    further advance this project. A final application is expected to be
    submitted to Western Australia regulatory officials once completed in
    FY2015.

  - Aurora - Michelin Uranium Project, Canada - As announced on 26 June
    2014, a revised Mineral Resource estimate for the Michelin Deposit (the
    "2014 Mineral Resource Estimate"), was completed. The 2014 Mineral
    Resource Estimate for the Michelin Deposit was successful in converting
    some 13.2Mlb U3O8 of previously Inferred category material into the
    Measured and Indicated categories, as well as adding 3.8Mlb U3O8 for a
    Measured and Indicated Mineral Resource total of 84.1Mlb U3O8. This is
    equivalent to a 25% increase in Measured and Indicated material and a
    36% increase in the grade of the Mineral Resources recoverable using
    open pit mining techniques. Mineral Resources remaining in the Inferred
    category now stand at 22.9Mlb U3O8.

- Production Guidance

  - Revised FY2014 production guidance was achieved at 7.943Mlb U3O8, at the
    upper end of the range of 7.8-8.0Mlb U3O8 advised on 7 February 2014.

  - With KM on care and maintenance, Paladin's guidance for LHM for FY2015
    is 5.4-5.8Mlb U3O8.

- Sales Volumes

  - Uranium sales volumes are expected to fluctuate quarter-on-quarter due
    to the uneven timing of contractual commitments and resultant delivery
    scheduling by customers. Now that production has reached design levels,
    sales, production volumes and inventories are expected to be comparable
    on an annualised basis.

- Langer Heinrich Minority Interest Sale

  - On 20 January 2014, the Company announced that it had signed an
    agreement to sell a 25% interest in LHM to CNNC Overseas Uranium Holding
    Limited, a wholly owned subsidiary of CNNC, the leading Chinese nuclear
    utility, for consideration of US$190M.

  - An offtake component of the agreement will allow CNNC to purchase its
    pro-rata share of product based on the prevailing market spot price at
    the time of sale. There is also an opportunity for Paladin to benefit by
    securing additional long term offtake arrangements with CNNC, at arm's
    length market rates, from Paladin's share of LHM production.

  - On 23 July 2014, the Company completed the settlement of the sale. The
    sale was subject to a number of conditions precedent which were met in
    full by 30 June 2014.

  - Proceeds from the sale will be utilised to repay debt across the
    Company.

  - With this major initiative to joint venture a minority equity stake in
    Langer Heinrich now completed, the door is open to pursue other
    opportunities, utilising the unique platform Paladin has developed in
    the global uranium mining industry, to further consolidate and
    strengthen its balance sheet. This will, in turn, also prepare the
    Company for growth into a major Tier 1 uranium producer.

- Successful Refinancing of Langer Heinrich and Kayelekera Facilities

  - On 17 January 2014, the Company announced it had entered into a project
    finance facility of US$110M and US$20M working capital facility for the
    refinancing of the previous LHM and the KM project finance facilities.

  - On 23 July 2014, the Company announced it had refinanced the existing
    US$110M project finance facility and US$20M working capital facility
    into a new US$70M syndicated loan facility. Proceeds were utilised to
    prepay US$30.8M of the existing facility, taking the outstanding balance
    to US$70M.

  - This new facility will provide significant cash flow benefits and
    further strengthens Paladin's financial position. The annual principal
    repayments will be reduced by US$32M over the first 3.5 years of the
    facility (2014 to 2017 calendar years), from US$18.3M pa to US$9.1M pa
    with the first repayment of US$4.55M not due until December 2014.

The documents comprising the Financial Report for the year ended 30 June 2014, including the Report to Shareholders, Management Discussion and Analysis, Financial Statements and Certifications will be filed with the Company's other documents on Sedar (sedar.com) and on the Company's website (paladinenergy.com.au).

Generally Accepted Accounting Practice

The news release includes non-GAAP performance measures: C1 cost of production, non-cash costs as well as other income and expenses. The Company believes that, in addition to the conventional measures prepared in accordance with GAAP, the Company and certain investors use this information to evaluate the Company's performance and ability to generate cash flow. The additional information provided herein should not be considered in isolation or as a substitute for measures of performance prepared in accordance with GAAP.

Declaration

The information in this announcement that relates to minerals exploration and mineral resources is based on information compiled by David Princep BSc, FAusIMM (CP) who has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity that he is undertaking to qualify as Competent Person as defined in the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (JORC Code). Mr Princep is a full-time employee of Paladin Energy Ltd. Mr. Princep consents to the inclusion of the information in this announcement in the form and context in which it appears. The Mineral Resources for the Manyingee deposit were announced to the ASX on the 14 January 2014, the Mineral Resources for the Michelin Deposit were announced to the ASX on the 26 June 2014 and the information contained within has not materially changed since it was last reported.

Conference Call

Conference Call and Investor Update is scheduled for 06:30 Perth & Hong Kong, Friday 29 August 2014, 18:30 Toronto and 23:30 London, Thursday 28 August 2014. Details are included in a separate news release dated 22 August 2014.

To view the Financial Report please visit the following link: http://media3.marketwire.com/docs/paladin_energy_2014_annual_report.pdf

ACN 061 681 098

Contacts:
Paladin Energy Ltd
John Borshoff
Managing Director/CEO
Tel: +61-8-9381-4366 or Mobile: +61-419-912-571
[email protected]

Paladin Energy Ltd
Craig Barnes
Chief Financial Officer
Tel: +61-8-9381-4366 or Mobile: +61-424- 724-416
[email protected]

Paladin Energy Ltd
Andrew Mirco
Investor Relations Contact
Tel: +61-8-9381-4366 or Mobile: +61-409-087-171
[email protected]

Paladin Energy Ltd
Greg Taylor
Investor Relations Contact
Tel: +1-905-337-7673 or Mobile: +1-416-605-5120 (Toronto)
[email protected]
www.paladinenergy.com.au

More Stories By Marketwired .

Copyright © 2009 Marketwired. All rights reserved. All the news releases provided by Marketwired are copyrighted. Any forms of copying other than an individual user's personal reference without express written permission is prohibited. Further distribution of these materials is strictly forbidden, including but not limited to, posting, emailing, faxing, archiving in a public database, redistributing via a computer network or in a printed form.

Latest Stories
Extreme Computing is the ability to leverage highly performant infrastructure and software to accelerate Big Data, machine learning, HPC, and Enterprise applications. High IOPS Storage, low-latency networks, in-memory databases, GPUs and other parallel accelerators are being used to achieve faster results and help businesses make better decisions. In his session at 18th Cloud Expo, Michael O'Neill, Strategic Business Development at NVIDIA, focused on some of the unique ways extreme computing is...
"We're bringing out a new application monitoring system to the DevOps space. It manages large enterprise applications that are distributed throughout a node in many enterprises and we manage them as one collective," explained Kevin Barnes, President of eCube Systems, in this SYS-CON.tv interview at DevOps at 18th Cloud Expo, held June 7-9, 2016, at the Javits Center in New York City, NY.
Amazon has gradually rolled out parts of its IoT offerings in the last year, but these are just the tip of the iceberg. In addition to optimizing their back-end AWS offerings, Amazon is laying the ground work to be a major force in IoT – especially in the connected home and office. Amazon is extending its reach by building on its dominant Cloud IoT platform, its Dash Button strategy, recently announced Replenishment Services, the Echo/Alexa voice recognition control platform, the 6-7 strategic...
The best-practices for building IoT applications with Go Code that attendees can use to build their own IoT applications. In his session at @ThingsExpo, Indraneel Mitra, Senior Solutions Architect & Technology Evangelist at Cognizant, provided valuable information and resources for both novice and experienced developers on how to get started with IoT and Golang in a day. He also provided information on how to use Intel Arduino Kit, Go Robotics API and AWS IoT stack to build an application tha...
IoT generates lots of temporal data. But how do you unlock its value? You need to discover patterns that are repeatable in vast quantities of data, understand their meaning, and implement scalable monitoring across multiple data streams in order to monetize the discoveries and insights. Motif discovery and deep learning platforms are emerging to visualize sensor data, to search for patterns and to build application that can monitor real time streams efficiently. In his session at @ThingsExpo, ...
Adding public cloud resources to an existing application can be a daunting process. The tools that you currently use to manage the software and hardware outside the cloud aren’t always the best tools to efficiently grow into the cloud. All of the major configuration management tools have cloud orchestration plugins that can be leveraged, but there are also cloud-native tools that can dramatically improve the efficiency of managing your application lifecycle. In his session at 18th Cloud Expo, ...
Ovum, a leading technology analyst firm, has published an in-depth report, Ovum Decision Matrix: Selecting a DevOps Release Management Solution, 2016–17. The report focuses on the automation aspects of DevOps, Release Management and compares solutions from the leading vendors.
Continuous testing helps bridge the gap between developing quickly and maintaining high quality products. But to implement continuous testing, CTOs must take a strategic approach to building a testing infrastructure and toolset that empowers their team to move fast. Download our guide to laying the groundwork for a scalable continuous testing strategy.
SYS-CON Events announced today that LeaseWeb USA, a cloud Infrastructure-as-a-Service (IaaS) provider, will exhibit at the 19th International Cloud Expo, which will take place on November 1–3, 2016, at the Santa Clara Convention Center in Santa Clara, CA. LeaseWeb is one of the world's largest hosting brands. The company helps customers define, develop and deploy IT infrastructure tailored to their exact business needs, by combining various kinds cloud solutions.
Choosing the right cloud for your workloads is a balancing act that can cost your organization time, money and aggravation - unless you get it right the first time. Economics, speed, performance, accessibility, administrative needs and security all play a vital role in dictating your approach to the cloud. Without knowing the right questions to ask, you could wind up paying for capacity you'll never need or underestimating the resources required to run your applications.
Up until last year, enterprises that were looking into cloud services usually undertook a long-term pilot with one of the large cloud providers, running test and dev workloads in the cloud. With cloud’s transition to mainstream adoption in 2015, and with enterprises migrating more and more workloads into the cloud and in between public and private environments, the single-provider approach must be revisited. In his session at 18th Cloud Expo, Yoav Mor, multi-cloud solution evangelist at Cloudy...
SYS-CON Events announced today that 910Telecom will exhibit at the 19th International Cloud Expo, which will take place on November 1–3, 2016, at the Santa Clara Convention Center in Santa Clara, CA. Housed in the classic Denver Gas & Electric Building, 910 15th St., 910Telecom is a carrier-neutral telecom hotel located in the heart of Denver. Adjacent to CenturyLink, AT&T, and Denver Main, 910Telecom offers connectivity to all major carriers, Internet service providers, Internet backbones and ...
StackIQ has announced the release of Stacki 3.2. Stacki is an easy-to-use Linux server provisioning tool. Stacki 3.2 delivers new capabilities that simplify the automation and integration of site-specific requirements. StackIQ is the commercial entity behind this open source bare metal provisioning tool. Since the release of Stacki in June of 2015, the Stacki core team has been focused on making the Community Edition meet the needs of members of the community, adding features and value, while ...
Big Data, cloud, analytics, contextual information, wearable tech, sensors, mobility, and WebRTC: together, these advances have created a perfect storm of technologies that are disrupting and transforming classic communications models and ecosystems. In his session at @ThingsExpo, Erik Perotti, Senior Manager of New Ventures on Plantronics’ Innovation team, provided an overview of this technological shift, including associated business and consumer communications impacts, and opportunities it ...
SYS-CON Events announced today that Venafi, the Immune System for the Internet™ and the leading provider of Next Generation Trust Protection, will exhibit at @DevOpsSummit at 19th International Cloud Expo, which will take place on November 1–3, 2016, at the Santa Clara Convention Center in Santa Clara, CA. Venafi is the Immune System for the Internet™ that protects the foundation of all cybersecurity – cryptographic keys and digital certificates – so they can’t be misused by bad guys in attacks...