Click here to close now.




















Welcome!

News Feed Item

Gold Standard Begins Phase 2 Drilling at the Railroad-Pinion Project, Carlin Trend, Nevada

9,100 m of RC Drilling Planned at the Pinion Deposit and the Bald Mountain Target

VANCOUVER, BRITISH COLUMBIA -- (Marketwired) -- 09/04/14 -- Gold Standard Ventures Corp. (TSX VENTURE:GSV)(NYSE MKT:GSV) ("Gold Standard" or the "Company") today announced plans for the Phase 2 exploration program at its 100%-owned/controlled Railroad-Pinion Project in Nevada's Carlin Trend. A budget of $2.5 million has been allocated to complete approximately 9,100 m of RC drilling at the Pinion oxide gold deposit and Bald Mountain oxide gold-copper target. One RC drill is currently drilling at Bald Mountain and a second RC rig will mobilize to Pinion in mid-September. Funding for this program was obtained in the financing which closed on August 19, 2014.

Pinion's first NI 43-101-compliant resource estimate is nearing completion using the data collected during the Phase 1 Pinion program. The estimate is expected to be released later this month.

Key highlights of the Phase 2 program include:

Pinion


--  Complete about 6,300 meters of RC drilling to extend areas of known
    shallow oxide gold mineralization along strike and at depth, and to test
    new targets identified by the Phase 1 program and a new 3D geologic
    model (click the following link for Pinion deposit target map:
    (http://goldstandardv.com/images/pinion-grade-thickness.jpg). Gold
    mineralization at Pinion is very continuous and widespread within a
    highly permeable, silicified, and oxidized collapse breccia which is
    favorably sandwiched between relatively impermeable silty micrite of the
    overlying Mississippian Tripon Pass Formation and thick-bedded
    calcarenite of the underlying Devonian Devil's Gate Formation.

--  Complete a 10 square kilometer soil grid designed to enhance near-
    surface oxide gold targets at Pinion and, follow-up on areas of
    favorable alteration and structure identified by 1:6000 geologic mapping
    west of the known Pinion deposit.

--  Acquire additional lines of CSAMT geophysical data to identify drill
    targets in the footwall of the Bullion Fault Corridor, a major north-
    south striking normal fault that imparts structural controls on gold
    mineralization at Pinion and North Bullion. Gravity data and cross
    section interpretations on the southeastern extent of Pinion indicate
    the likely recurrence of the geological architecture at the North
    Bullion deposit, a target which has not been tested by historic
    drilling. CSAMT has proven accuracy in tracing this fault at North
    Bullion.

--  Complete additional metallurgy.

Bald Mountain


--  Drill five vertical RC holes (about 2,800 meters) to expand the limits
    of known oxide gold and copper mineralization outside from the area of
    historic drilling and RRB13-01, a 2013 core hole that intersected two
    unique and separate zones of oxidized, collapse-breccia hosted
    mineralization (click the following link for a Bald Mountain drill hole
    map: (http://goldstandardv.com/images/bald-mountain-target-map.jpg).
    Intercepts included 56.1m of 1.47 g Au/t immediately above 23.3m of 0.4%
    Cu. Twelve holes in the target currently outline an area approximately
    210 meters north-south by 550 meters east-west containing an oxidized,
    polymetallic system that remains open in all directions.

--  Complete a 14 square kilometer ground magnetic survey over the Bald
    Mountain Au-Cu-Ag target, the Sylvania Ag-Cu-Pb target and the Eocene
    age Bullion Stock. In this geologic setting, marginal to the Bullion
    Stock and within proximal dike swarms, magnetite and pyrrhotite are
    spatially associated with zones of precious and base metal
    mineralization.

Mac Jackson, Gold Standard's Vice President of Exploration stated, "Most of our Phase 2 program is designed to define and expand the oxide mineral zones at the Pinion Deposit and Bald Mountain target, both of which are open in multiple directions. In addition, we will continue to explore the rest of our highly prospective, 115 square kilometer property on the Carlin Trend with Phase 2 soil sampling, ground magnetics, CSAMT and mapping that will help lead to our next new discovery at Railroad."

Sampling Methodology, Chain of Custody, Quality Control and Quality Assurance:

All sampling was conducted under the supervision of the Company's project geologists and the chain of custody from the drill to the sample preparation facility was continuously monitored. Core was cut at the Company's facility in Elko, NV and one half was sent to the lab for analysis and the other half retained in the original core box. A blank, quarter core duplicate or certified reference material was inserted approximately every tenth sample. The samples are delivered to ALS Minerals preparation facility in Elko, NV. The samples are crushed and pulverized and sample pulps are shipped to ALS Minerals certified laboratory in Vancouver. Pulps are digested and analyzed for gold using fire assay fusion and an atomic absorption spectroscopy (AAS) finish on a 30 gram split. All other elements are determined by ICP analysis. Data verification of the analytical results includes a statistical analysis of the duplicates, standards and blanks that must pass certain parameters for acceptance to insure accurate and verifiable results.

The scientific and technical content and interpretations contained in this news release have been reviewed, verified and approved by Steven R. Koehler, Gold Standard's Manager of Projects, BSc. Geology and CPG-10216, a Qualified Person as defined by NI 43-101, Standards of Disclosure for Mineral Projects.

ABOUT GOLD STANDARD VENTURES - Gold Standard is an advanced stage gold exploration company focused on district scale discoveries in Nevada. The Company's flagship project, the Railroad-Pinion Gold Project, is located within the prolific Carlin Trend. The recent Pinion gold deposit acquisition offers Gold Standard a potential near-term development option and further consolidates the Company's premier land package in the Carlin Trend. Gold Standard is moving towards building NI 43-101 compliant gold resources at both the near surface, oxide-gold Pinion deposit and the classic Carlin style, North Bullion gold deposit in 2014.

Neither the TSXV nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) nor the NYSE MKT accepts responsibility for the adequacy or accuracy of this news release.

CAUTIONARY NOTE REGARDING FORWARD-LOOKING STATEMENTS

This news release contains forward-looking statements, which relate to future events or future performance and reflect management's current expectations and assumptions. Such forward-looking statements reflect management's current beliefs and are based on assumptions made by and information currently available to the Company. All statements, other than statements of historical fact, included herein including, without limitation, statements about our proposed exploration programs are forward looking statements. By their nature, forward-looking statements involve known and unknown risks, uncertainties and other factors which may cause our actual results, performance or achievements, or other future events, to be materially different from any future results, performance or achievements expressed or implied by such forward-looking statements. Risk factors affecting the Company include, among others: the results from our exploration programs, global financial conditions and volatility of capital markets, uncertainty regarding the availability of additional capital, fluctuations in commodity prices; title matters; and the additional risks identified in our filings with Canadian securities regulators on SEDAR in Canada (available at www.sedar.com) and with the SEC on EDGAR (available at www.sec.gov/edgar.shtml). These forward-looking statements are made as of the date hereof and, except as required under applicable securities legislation, the Company does not assume any obligation to update or revise them to reflect new events or circumstances.

On behalf of the Board of Directors of Gold Standard,

Jonathan Awde, President and Director

More Stories By Marketwired .

Copyright © 2009 Marketwired. All rights reserved. All the news releases provided by Marketwired are copyrighted. Any forms of copying other than an individual user's personal reference without express written permission is prohibited. Further distribution of these materials is strictly forbidden, including but not limited to, posting, emailing, faxing, archiving in a public database, redistributing via a computer network or in a printed form.

Latest Stories
Learn how to solve the problem of keeping files in sync between multiple Docker containers. In his session at 16th Cloud Expo, Aaron Brongersma, Senior Infrastructure Engineer at Modulus, discussed using rsync, GlusterFS, EBS and Bit Torrent Sync. He broke down the tools that are needed to help create a seamless user experience. In the end, can we have an environment where we can easily move Docker containers, servers, and volumes without impacting our applications? He shared his results so yo...
Palerra, the cloud security automation company, announced enhanced support for Amazon AWS, allowing IT security and DevOps teams to automate activity and configuration monitoring, anomaly detection, and orchestrated remediation, thereby meeting compliance mandates within complex infrastructure deployments. "Monitoring and threat detection for AWS is a non-trivial task. While Amazon's flexible environment facilitates successful DevOps implementations, it adds another layer, which can become a ...
With SaaS use rampant across organizations, how can IT departments track company data and maintain security? More and more departments are commissioning their own solutions and bypassing IT. A cloud environment is amorphous and powerful, allowing you to set up solutions for all of your user needs: document sharing and collaboration, mobile access, e-mail, even industry-specific applications. In his session at 16th Cloud Expo, Shawn Mills, President and a founder of Green House Data, discussed h...
The Software Defined Data Center (SDDC), which enables organizations to seamlessly run in a hybrid cloud model (public + private cloud), is here to stay. IDC estimates that the software-defined networking market will be valued at $3.7 billion by 2016. Security is a key component and benefit of the SDDC, and offers an opportunity to build security 'from the ground up' and weave it into the environment from day one. In his session at 16th Cloud Expo, Reuven Harrison, CTO and Co-Founder of Tufin,...
There are many considerations when moving applications from on-premise to cloud. It is critical to understand the benefits and also challenges of this migration. A successful migration will result in lower Total Cost of Ownership, yet offer the same or higher level of robustness. In his session at 15th Cloud Expo, Michael Meiner, an Engineering Director at Oracle, Corporation, analyzed a range of cloud offerings (IaaS, PaaS, SaaS) and discussed the benefits/challenges of migrating to each offe...
SYS-CON Events announced today that MobiDev, a software development company, will exhibit at the 17th International Cloud Expo®, which will take place November 3–5, 2015, at the Santa Clara Convention Center in Santa Clara, CA. MobiDev is a software development company with representative offices in Atlanta (US), Sheffield (UK) and Würzburg (Germany); and development centers in Ukraine. Since 2009 it has grown from a small group of passionate engineers and business managers to a full-scale mobi...
Chuck Piluso presented a study of cloud adoption trends and the power and flexibility of IBM Power and Pureflex cloud solutions. Prior to Secure Infrastructure and Services, Mr. Piluso founded North American Telecommunication Corporation, a facilities-based Competitive Local Exchange Carrier licensed by the Public Service Commission in 10 states, serving as the company's chairman and president from 1997 to 2000. Between 1990 and 1997, Mr. Piluso served as chairman & founder of International Te...
Mobile, social, Big Data, and cloud have fundamentally changed the way we live. “Anytime, anywhere” access to data and information is no longer a luxury; it’s a requirement, in both our personal and professional lives. For IT organizations, this means pressure has never been greater to deliver meaningful services to the business and customers.
In a recent research, analyst firm IDC found that the average cost of a critical application failure is $500,000 to $1 million per hour and the average total cost of unplanned application downtime is $1.25 billion to $2.5 billion per year for Fortune 1000 companies. In addition to the findings on the cost of the downtime, the research also highlighted best practices for development, testing, application support, infrastructure, and operations teams.
In their session at 17th Cloud Expo, Hal Schwartz, CEO of Secure Infrastructure & Services (SIAS), and Chuck Paolillo, CTO of Secure Infrastructure & Services (SIAS), provide a study of cloud adoption trends and the power and flexibility of IBM Power and Pureflex cloud solutions. In his role as CEO of Secure Infrastructure & Services (SIAS), Hal Schwartz provides leadership and direction for the company.
Puppet Labs has announced the next major update to its flagship product: Puppet Enterprise 2015.2. This release includes new features providing DevOps teams with clarity, simplicity and additional management capabilities, including an all-new user interface, an interactive graph for visualizing infrastructure code, a new unified agent and broader infrastructure support.
For IoT to grow as quickly as analyst firms’ project, a lot is going to fall on developers to quickly bring applications to market. But the lack of a standard development platform threatens to slow growth and make application development more time consuming and costly, much like we’ve seen in the mobile space. In his session at @ThingsExpo, Mike Weiner, Product Manager of the Omega DevCloud with KORE Telematics Inc., discussed the evolving requirements for developers as IoT matures and conducte...
Container technology is sending shock waves through the world of cloud computing. Heralded as the 'next big thing,' containers provide software owners a consistent way to package their software and dependencies while infrastructure operators benefit from a standard way to deploy and run them. Containers present new challenges for tracking usage due to their dynamic nature. They can also be deployed to bare metal, virtual machines and various cloud platforms. How do software owners track the usag...
Explosive growth in connected devices. Enormous amounts of data for collection and analysis. Critical use of data for split-second decision making and actionable information. All three are factors in making the Internet of Things a reality. Yet, any one factor would have an IT organization pondering its infrastructure strategy. How should your organization enhance its IT framework to enable an Internet of Things implementation? In his session at @ThingsExpo, James Kirkland, Red Hat's Chief Arch...
Providing the needed data for application development and testing is a huge headache for most organizations. The problems are often the same across companies - speed, quality, cost, and control. Provisioning data can take days or weeks, every time a refresh is required. Using dummy data leads to quality problems. Creating physical copies of large data sets and sending them to distributed teams of developers eats up expensive storage and bandwidth resources. And, all of these copies proliferating...