K92 Drilling Significantly Upgrades Predicted Grade and Contained Ounces in First Two Planned Production Stopes

VANCOUVER, BRITISH COLUMBIA -- (Marketwired) -- 11/30/16 -- K92 (TSX VENTURE: KNT)(OTCQB: KNTNF) is pleased to announce the initial results from the ongoing grade control drilling programme at its high grade Kainantu Gold Mine, that is currently in the start-up phase. The results have significantly increased both the predicted grade and contained gold ounces in the first two planned production stopes.

Highlights include:

--  Grade increase from 5.82 gpt Au in original AMDAD Stope Model to 9.21
    gpt Au
--  Combined ounces in the two stope designs increase from 1,550 ozs Au to
    2,390 oz Au
--  Intercepts include 102 gpt Au over 1.1m and 9.21 gpt Au over 0.5m in
    GCDD 002 and 30.19 gpt Au over 2.5m in GCDD 001

In September 2016, K92 Mining Inc. ("K92") commenced a campaign of close spaced underground diamond drilling as part of a comprehensive grade control strategy. This grade control drilling is designed to bring a significantly higher degree of confidence to the production planning and scheduling by drilling out all scheduled production areas underground ahead of actual development on a closed space pattern of approximately 15 metres by 15 metres. This compares with resource drilling which has been carried out of a 50 metre by 50 metre or greater pattern.

The initial grade control drilling intercepts included high grade gold intercepts including 102 grams per tonne gold ("gpt") over 1.1 metres and 9.21 gpt gold over 0.5 metres in diamond drill hole GCDD 002 and 30.19 gpt gold over 2.5 meters in diamond drill hole GCDD001.

The results from this drilling are then used to finalize the various stope and ore development designs and provide updated information on projected production from the areas in terms of tonnage, grade and contained ozs. Table 1 below provides a comparison between the original AMDAD stope design and the new design based on grade control data, using both cut and uncut data. The stopes are situated at the lowest point in the underground which K92 have planned to mine and are also at the southern edge of the known resource that has only been drilled on a 100 metre by 100 metre pattern.

The updated stope designs based on the grade control drilling indicate the projected grade of the combined stopes has increased from 5.82 g/t Au in the original AMDAD stope model to 9.21 g/t (applying a top cut of 70 g/t Au) in the new stope model using the grade control results. The combined ozs in the two stopes has increased from 1,550 ozs Au to 2,390 ozs Au (applying the top cut of 70 g/t Au).

Table 1 Comparison of Grade Control Stope Design versus AMDAD Stope Design -
 tonnage, grade and contained ozs

                                          Grade Control Model
----------------------------------------------------------------------------
Elevation                  Volume  Tonnes Au Cut 70  Au Ozs Au Uncut  Au Ozs
----------------------------------------------------------------------------
1205 -greater than 1220    1,358   3,937      4.17     528     4.95     627
----------------------------------------------------------------------------
1220 -greater than 1235    1,427   4,138     14.01   1,864    16.89   2,247
----------------------------------------------------------------------------
Total                       2,785   8,075      9.21   2,392    11.07   2,874
----------------------------------------------------------------------------

Table 1 Comparison of Grade Control Stope Design versus AMDAD Stope Design -
 tonnage, grade and contained ozs

                                       AMDAD stope Design Model
----------------------------------------------------------------------------
Elevation                        Volume      Tonnes     Au Amdad      Au Ozs
----------------------------------------------------------------------------
1205 -greater than 1220          1,625       4,713         6.05         917
----------------------------------------------------------------------------
1220 -greater than 1235          1,234       3,580         5.53         637
----------------------------------------------------------------------------
Total                             2,859       8,293         5.82       1,553
----------------------------------------------------------------------------

Table 2 and 3 below provides a summary of the results from the first six diamond grade control holes which have been drilled into the first two stope areas it is planned to be mined underground. Table 1 provides a summary of the significant intercepts from the holes, while Table 2 provides details of collar location and hole orientation.

Table 1 Kainantu Gold Mine - Significant Intercepts from Irumafimpa Grade
 Control

           From          Interval True width  Gold Copper  Silver       Gold
 Hole_id    (m)  To (m)       (m)        (m)   g/t      %     g/t equivalent
----------------------------------------------------------------------------
GCDD0001   31.7    33.1       1.4       1.02  2.19   0.17     4.2       2.49
----------------------------------------------------------------------------
GCDD0001     44    46.5       2.5       1.85 30.19   0.31    6.24      30.72
----------------------------------------------------------------------------
GCDD0001   49.1    50.1         1       0.74   6.1   0.08     1.7       6.24
----------------------------------------------------------------------------
GCDD0002   44.9      46       1.1       0.74   102   0.13    13.1     102.36
----------------------------------------------------------------------------
GCDD0002   47.4    48.9       1.5        0.8  2.97   0.04    18.4       3.27
----------------------------------------------------------------------------
GCDD0002   50.1    50.6       0.5       0.34  9.21   0.02     1.2       9.26
----------------------------------------------------------------------------
GCDD0003    5.6     6.5       0.9       0.58  3.21    2.3    33.7       6.95
----------------------------------------------------------------------------
GCDD0003   51.5    51.7       0.2       0.13  4.37   0.24    17.7       4.94
----------------------------------------------------------------------------
GCDD0003     54    55.1       1.1       0.74  2.76   0.33     6.4       3.31
----------------------------------------------------------------------------
GCDD0004     13    14.2       1.2       0.61  4.39   0.03     5.5        4.5
----------------------------------------------------------------------------
GCDD0004   37.1    40.1         3       1.53  3.24   0.18     7.1       3.59
----------------------------------------------------------------------------
GCDD0005   41.8    43.5       1.7       0.94  2.05   0.14    0.37       2.25
----------------------------------------------------------------------------
GCDD0006     46      47         1        0.9  33.8   0.07     8.4      34.01
Notes
Shaded rows are the intersections which are included in the designed stopes
Gold Equivalent uses Copper price - US$2.50/lb; Silver price US$16/oz and
Gold price of US$1200/oz

Table 2 Kainantu Gold Mine - Collar Locations and Orientation for Irumafimpa
 Grade Control Drilling

                                                          EOH
                                             Collar      depth
  Hole_id         Collar location          orientation    (m)      Lode

              Local    Local                     Local
              north     East      RL      Dip   azimuth
----------------------------------------------------------------------------
  GCDD0001   59561.41  29918.5   1235.22  -0.4    226.38    72  Irumafimpa
----------------------------------------------------------------------------
  GCDD0002    59560.9 29917.89   1234.63   -13    226.56  69.1  Irumafimpa
----------------------------------------------------------------------------
  GCDD0003   59560.95 29917.98   1234.01 -26.4    225.45  73.6  Irumafimpa
----------------------------------------------------------------------------
  GCDD0004   59561.58 29917.28   1235.18  -2.3    239.27  67.1  Irumafimpa
----------------------------------------------------------------------------
  GCDD0005   59561.57 29917.27   1234.54   -15    239.27    72  Irumafimpa
----------------------------------------------------------------------------
  GCDD0006   59656.34 29922.65   1247.42 -25.7    292.22  65.7  Irumafimpa
----------------------------------------------------------------------------

Ian Stalker, K92 Chief Executive Officer and Director, states, "These results are very positive, as the stopes are located at the southern extremity of the resource where data is limited and significantly lower grades were expected. The results, combined with the results from the recently completed Preliminary Economic Assessment ("PEA") on Kora reinforce our belief that this high grade gold system has significant expansion potential. The key focus of the technical team on site is the successful ramp up in our production from the Irumafimpa ore body and these first grade control results certainly indicate we are on track to achieve our targeted design production in the coming quarter."

Recently, K92 Mining announced that initial gold production commenced at the Irumafimpa Gold Deposit and also announced results from a Preliminary Economic Assessment ("PEA") completed at the Kora Gold Deposit, which the company is targeting to bring online in Q1 2018 (key results from the PEA include estimates of 108,000 AuEq ounces per annum of annual production at an all-in sustaining cost of $619/ozAuEq, cash flow of USD $558 million over a 9 year period, an NPV5 of USD $415 million and initial capital costs of USD $13.84 million. See K92 News Release dated October 13, 2016 for the full News Release). The ongoing drill program commenced concurrent with these achievements.

Andrew Kohler, BSc, Geo, a qualified person under the meaning of Canadian National Instrument 43-101, has reviewed and is responsible for the technical content of this news release.

On behalf of the company,

Ian Stalker, Chief Executive Officer and Director

CAUTIONARY STATEMENT REGARDING FORWARD-LOOKING INFORMATION: This news release includes certain "forward-looking statements" under applicable Canadian securities legislation. Forward-looking statements are necessarily based upon a number of estimates and assumptions that, while considered reasonable, are subject to known and unknown risks, uncertainties, and other factors which may cause the actual results and future events to differ materially from those expressed or implied by such forward-looking statements. All statements that address future plans, activities, events or developments that the Company believes, expects or anticipates will or may occur are forward-looking information, including statements regarding potential ongoing production which may or may not occur and the generation of further production assessment work at deposits, which may or may not occur. The Preliminary Economic Assessment ("PEA") is preliminary in nature and includes inferred mineral resources that are considered too speculative geologically to have the economic considerations applied to them that would enable them to be categorized as mineral reserves, and there is no certainty that the PEA will be realized. Forward-looking statements and information contained herein are based on certain factors and assumptions regarding, among other things, the market price of the Company's securities, metal prices, taxation, the estimation, timing and amount of future exploration and development, capital and operating costs, the availability of financing, the receipt of regulatory approvals, environmental risks, title disputes, failure of plant, equipment or processes to operate as anticipated, accidents, labour disputes, claims and limitations on insurance coverage and other risks of the mining industry, changes in national and local government regulation of mining operations, and regulations and other matters. There can be no assurance that such statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking statements. The Company disclaims any intention or obligation to update or revise any forward-looking statements, whether as a result of new information, future events or otherwise, except as required by law.

Contacts:
K92 Mining Inc.
Ian Stalker
Chief Executive Officer and Director
(604) 687-7130
(604) 608-9110 (FAX)

More Stories By Marketwired .

Copyright © 2009 Marketwired. All rights reserved. All the news releases provided by Marketwired are copyrighted. Any forms of copying other than an individual user's personal reference without express written permission is prohibited. Further distribution of these materials is strictly forbidden, including but not limited to, posting, emailing, faxing, archiving in a public database, redistributing via a computer network or in a printed form.

Latest Stories
Nordstrom is transforming the way that they do business and the cloud is the key to enabling speed and hyper personalized customer experiences. In his session at 21st Cloud Expo, Ken Schow, VP of Engineering at Nordstrom, discussed some of the key learnings and common pitfalls of large enterprises moving to the cloud. This includes strategies around choosing a cloud provider(s), architecture, and lessons learned. In addition, he covered some of the best practices for structured team migration an...
Digital transformation is about embracing digital technologies into a company's culture to better connect with its customers, automate processes, create better tools, enter new markets, etc. Such a transformation requires continuous orchestration across teams and an environment based on open collaboration and daily experiments. In his session at 21st Cloud Expo, Alex Casalboni, Technical (Cloud) Evangelist at Cloud Academy, explored and discussed the most urgent unsolved challenges to achieve f...
Recently, WebRTC has a lot of eyes from market. The use cases of WebRTC are expanding - video chat, online education, online health care etc. Not only for human-to-human communication, but also IoT use cases such as machine to human use cases can be seen recently. One of the typical use-case is remote camera monitoring. With WebRTC, people can have interoperability and flexibility for deploying monitoring service. However, the benefit of WebRTC for IoT is not only its convenience and interopera...
SYS-CON Events announced today that Synametrics Technologies will exhibit at SYS-CON's 22nd International Cloud Expo®, which will take place on June 5-7, 2018, at the Javits Center in New York, NY. Synametrics Technologies is a privately held company based in Plainsboro, New Jersey that has been providing solutions for the developer community since 1997. Based on the success of its initial product offerings such as WinSQL, Xeams, SynaMan and Syncrify, Synametrics continues to create and hone inn...
"WineSOFT is a software company making proxy server software, which is widely used in the telecommunication industry or the content delivery networks or e-commerce," explained Jonathan Ahn, COO of WineSOFT, in this SYS-CON.tv interview at 21st Cloud Expo, held Oct 31 – Nov 2, 2017, at the Santa Clara Convention Center in Santa Clara, CA.
The dynamic nature of the cloud means that change is a constant when it comes to modern cloud-based infrastructure. Delivering modern applications to end users, therefore, is a constantly shifting challenge. Delivery automation helps IT Ops teams ensure that apps are providing an optimal end user experience over hybrid-cloud and multi-cloud environments, no matter what the current state of the infrastructure is. To employ a delivery automation strategy that reflects your business rules, making r...
There is a huge demand for responsive, real-time mobile and web experiences, but current architectural patterns do not easily accommodate applications that respond to events in real time. Common solutions using message queues or HTTP long-polling quickly lead to resiliency, scalability and development velocity challenges. In his session at 21st Cloud Expo, Ryland Degnan, a Senior Software Engineer on the Netflix Edge Platform team, will discuss how by leveraging a reactive stream-based protocol,...
Modern software design has fundamentally changed how we manage applications, causing many to turn to containers as the new virtual machine for resource management. As container adoption grows beyond stateless applications to stateful workloads, the need for persistent storage is foundational - something customers routinely cite as a top pain point. In his session at @DevOpsSummit at 21st Cloud Expo, Bill Borsari, Head of Systems Engineering at Datera, explored how organizations can reap the bene...
The past few years have brought a sea change in the way applications are architected, developed, and consumed—increasing both the complexity of testing and the business impact of software failures. How can software testing professionals keep pace with modern application delivery, given the trends that impact both architectures (cloud, microservices, and APIs) and processes (DevOps, agile, and continuous delivery)? This is where continuous testing comes in. D
Most technology leaders, contemporary and from the hardware era, are reshaping their businesses to do software. They hope to capture value from emerging technologies such as IoT, SDN, and AI. Ultimately, irrespective of the vertical, it is about deriving value from independent software applications participating in an ecosystem as one comprehensive solution. In his session at @ThingsExpo, Kausik Sridhar, founder and CTO of Pulzze Systems, discussed how given the magnitude of today's application ...
Sanjeev Sharma Joins June 5-7, 2018 @DevOpsSummit at @Cloud Expo New York Faculty. Sanjeev Sharma is an internationally known DevOps and Cloud Transformation thought leader, technology executive, and author. Sanjeev's industry experience includes tenures as CTO, Technical Sales leader, and Cloud Architect leader. As an IBM Distinguished Engineer, Sanjeev is recognized at the highest levels of IBM's core of technical leaders.
Digital Transformation (DX) is not a "one-size-fits all" strategy. Each organization needs to develop its own unique, long-term DX plan. It must do so by realizing that we now live in a data-driven age, and that technologies such as Cloud Computing, Big Data, the IoT, Cognitive Computing, and Blockchain are only tools. In her general session at 21st Cloud Expo, Rebecca Wanta explained how the strategy must focus on DX and include a commitment from top management to create great IT jobs, monitor ...
The 22nd International Cloud Expo | 1st DXWorld Expo has announced that its Call for Papers is open. Cloud Expo | DXWorld Expo, to be held June 5-7, 2018, at the Javits Center in New York, NY, brings together Cloud Computing, Digital Transformation, Big Data, Internet of Things, DevOps, Machine Learning and WebRTC to one location. With cloud computing driving a higher percentage of enterprise IT budgets every year, it becomes increasingly important to plant your flag in this fast-expanding busin...
"Digital transformation - what we knew about it in the past has been redefined. Automation is going to play such a huge role in that because the culture, the technology, and the business operations are being shifted now," stated Brian Boeggeman, VP of Alliances & Partnerships at Ayehu, in this SYS-CON.tv interview at 21st Cloud Expo, held Oct 31 – Nov 2, 2017, at the Santa Clara Convention Center in Santa Clara, CA.
Continuous Delivery makes it possible to exploit findings of cognitive psychology and neuroscience to increase the productivity and happiness of our teams. In his session at 22nd Cloud Expo | DXWorld Expo, Daniel Jones, CTO of EngineerBetter, will answer: How can we improve willpower and decrease technical debt? Is the present bias real? How can we turn it to our advantage? Can you increase a team’s effective IQ? How do DevOps & Product Teams increase empathy, and what impact does empath...