K92 Drilling Significantly Upgrades Predicted Grade and Contained Ounces in First Two Planned Production Stopes

VANCOUVER, BRITISH COLUMBIA -- (Marketwired) -- 11/30/16 -- K92 (TSX VENTURE: KNT)(OTCQB: KNTNF) is pleased to announce the initial results from the ongoing grade control drilling programme at its high grade Kainantu Gold Mine, that is currently in the start-up phase. The results have significantly increased both the predicted grade and contained gold ounces in the first two planned production stopes.

Highlights include:


--  Grade increase from 5.82 gpt Au in original AMDAD Stope Model to 9.21
    gpt Au
--  Combined ounces in the two stope designs increase from 1,550 ozs Au to
    2,390 oz Au
--  Intercepts include 102 gpt Au over 1.1m and 9.21 gpt Au over 0.5m in
    GCDD 002 and 30.19 gpt Au over 2.5m in GCDD 001

In September 2016, K92 Mining Inc. ("K92") commenced a campaign of close spaced underground diamond drilling as part of a comprehensive grade control strategy. This grade control drilling is designed to bring a significantly higher degree of confidence to the production planning and scheduling by drilling out all scheduled production areas underground ahead of actual development on a closed space pattern of approximately 15 metres by 15 metres. This compares with resource drilling which has been carried out of a 50 metre by 50 metre or greater pattern.

The initial grade control drilling intercepts included high grade gold intercepts including 102 grams per tonne gold ("gpt") over 1.1 metres and 9.21 gpt gold over 0.5 metres in diamond drill hole GCDD 002 and 30.19 gpt gold over 2.5 meters in diamond drill hole GCDD001.

The results from this drilling are then used to finalize the various stope and ore development designs and provide updated information on projected production from the areas in terms of tonnage, grade and contained ozs. Table 1 below provides a comparison between the original AMDAD stope design and the new design based on grade control data, using both cut and uncut data. The stopes are situated at the lowest point in the underground which K92 have planned to mine and are also at the southern edge of the known resource that has only been drilled on a 100 metre by 100 metre pattern.

The updated stope designs based on the grade control drilling indicate the projected grade of the combined stopes has increased from 5.82 g/t Au in the original AMDAD stope model to 9.21 g/t (applying a top cut of 70 g/t Au) in the new stope model using the grade control results. The combined ozs in the two stopes has increased from 1,550 ozs Au to 2,390 ozs Au (applying the top cut of 70 g/t Au).


Table 1 Comparison of Grade Control Stope Design versus AMDAD Stope Design -
 tonnage, grade and contained ozs

                                          Grade Control Model
----------------------------------------------------------------------------
Elevation                  Volume  Tonnes Au Cut 70  Au Ozs Au Uncut  Au Ozs
----------------------------------------------------------------------------
1205 -greater than 1220    1,358   3,937      4.17     528     4.95     627
----------------------------------------------------------------------------
1220 -greater than 1235    1,427   4,138     14.01   1,864    16.89   2,247
----------------------------------------------------------------------------
Total                       2,785   8,075      9.21   2,392    11.07   2,874
----------------------------------------------------------------------------

Table 1 Comparison of Grade Control Stope Design versus AMDAD Stope Design -
 tonnage, grade and contained ozs

                                       AMDAD stope Design Model
----------------------------------------------------------------------------
Elevation                        Volume      Tonnes     Au Amdad      Au Ozs
----------------------------------------------------------------------------
1205 -greater than 1220          1,625       4,713         6.05         917
----------------------------------------------------------------------------
1220 -greater than 1235          1,234       3,580         5.53         637
----------------------------------------------------------------------------
Total                             2,859       8,293         5.82       1,553
----------------------------------------------------------------------------

Table 2 and 3 below provides a summary of the results from the first six diamond grade control holes which have been drilled into the first two stope areas it is planned to be mined underground. Table 1 provides a summary of the significant intercepts from the holes, while Table 2 provides details of collar location and hole orientation.


Table 1 Kainantu Gold Mine - Significant Intercepts from Irumafimpa Grade
 Control

           From          Interval True width  Gold Copper  Silver       Gold
 Hole_id    (m)  To (m)       (m)        (m)   g/t      %     g/t equivalent
----------------------------------------------------------------------------
GCDD0001   31.7    33.1       1.4       1.02  2.19   0.17     4.2       2.49
----------------------------------------------------------------------------
GCDD0001     44    46.5       2.5       1.85 30.19   0.31    6.24      30.72
----------------------------------------------------------------------------
GCDD0001   49.1    50.1         1       0.74   6.1   0.08     1.7       6.24
----------------------------------------------------------------------------
GCDD0002   44.9      46       1.1       0.74   102   0.13    13.1     102.36
----------------------------------------------------------------------------
GCDD0002   47.4    48.9       1.5        0.8  2.97   0.04    18.4       3.27
----------------------------------------------------------------------------
GCDD0002   50.1    50.6       0.5       0.34  9.21   0.02     1.2       9.26
----------------------------------------------------------------------------
GCDD0003    5.6     6.5       0.9       0.58  3.21    2.3    33.7       6.95
----------------------------------------------------------------------------
GCDD0003   51.5    51.7       0.2       0.13  4.37   0.24    17.7       4.94
----------------------------------------------------------------------------
GCDD0003     54    55.1       1.1       0.74  2.76   0.33     6.4       3.31
----------------------------------------------------------------------------
GCDD0004     13    14.2       1.2       0.61  4.39   0.03     5.5        4.5
----------------------------------------------------------------------------
GCDD0004   37.1    40.1         3       1.53  3.24   0.18     7.1       3.59
----------------------------------------------------------------------------
GCDD0005   41.8    43.5       1.7       0.94  2.05   0.14    0.37       2.25
----------------------------------------------------------------------------
GCDD0006     46      47         1        0.9  33.8   0.07     8.4      34.01
Notes
Shaded rows are the intersections which are included in the designed stopes
Gold Equivalent uses Copper price - US$2.50/lb; Silver price US$16/oz and
Gold price of US$1200/oz

Table 2 Kainantu Gold Mine - Collar Locations and Orientation for Irumafimpa
 Grade Control Drilling

                                                          EOH
                                             Collar      depth
  Hole_id         Collar location          orientation    (m)      Lode

              Local    Local                     Local
              north     East      RL      Dip   azimuth
----------------------------------------------------------------------------
  GCDD0001   59561.41  29918.5   1235.22  -0.4    226.38    72  Irumafimpa
----------------------------------------------------------------------------
  GCDD0002    59560.9 29917.89   1234.63   -13    226.56  69.1  Irumafimpa
----------------------------------------------------------------------------
  GCDD0003   59560.95 29917.98   1234.01 -26.4    225.45  73.6  Irumafimpa
----------------------------------------------------------------------------
  GCDD0004   59561.58 29917.28   1235.18  -2.3    239.27  67.1  Irumafimpa
----------------------------------------------------------------------------
  GCDD0005   59561.57 29917.27   1234.54   -15    239.27    72  Irumafimpa
----------------------------------------------------------------------------
  GCDD0006   59656.34 29922.65   1247.42 -25.7    292.22  65.7  Irumafimpa
----------------------------------------------------------------------------

Ian Stalker, K92 Chief Executive Officer and Director, states, "These results are very positive, as the stopes are located at the southern extremity of the resource where data is limited and significantly lower grades were expected. The results, combined with the results from the recently completed Preliminary Economic Assessment ("PEA") on Kora reinforce our belief that this high grade gold system has significant expansion potential. The key focus of the technical team on site is the successful ramp up in our production from the Irumafimpa ore body and these first grade control results certainly indicate we are on track to achieve our targeted design production in the coming quarter."

Recently, K92 Mining announced that initial gold production commenced at the Irumafimpa Gold Deposit and also announced results from a Preliminary Economic Assessment ("PEA") completed at the Kora Gold Deposit, which the company is targeting to bring online in Q1 2018 (key results from the PEA include estimates of 108,000 AuEq ounces per annum of annual production at an all-in sustaining cost of $619/ozAuEq, cash flow of USD $558 million over a 9 year period, an NPV5 of USD $415 million and initial capital costs of USD $13.84 million. See K92 News Release dated October 13, 2016 for the full News Release). The ongoing drill program commenced concurrent with these achievements.

Andrew Kohler, BSc, Geo, a qualified person under the meaning of Canadian National Instrument 43-101, has reviewed and is responsible for the technical content of this news release.

On behalf of the company,

Ian Stalker, Chief Executive Officer and Director

CAUTIONARY STATEMENT REGARDING FORWARD-LOOKING INFORMATION: This news release includes certain "forward-looking statements" under applicable Canadian securities legislation. Forward-looking statements are necessarily based upon a number of estimates and assumptions that, while considered reasonable, are subject to known and unknown risks, uncertainties, and other factors which may cause the actual results and future events to differ materially from those expressed or implied by such forward-looking statements. All statements that address future plans, activities, events or developments that the Company believes, expects or anticipates will or may occur are forward-looking information, including statements regarding potential ongoing production which may or may not occur and the generation of further production assessment work at deposits, which may or may not occur. The Preliminary Economic Assessment ("PEA") is preliminary in nature and includes inferred mineral resources that are considered too speculative geologically to have the economic considerations applied to them that would enable them to be categorized as mineral reserves, and there is no certainty that the PEA will be realized. Forward-looking statements and information contained herein are based on certain factors and assumptions regarding, among other things, the market price of the Company's securities, metal prices, taxation, the estimation, timing and amount of future exploration and development, capital and operating costs, the availability of financing, the receipt of regulatory approvals, environmental risks, title disputes, failure of plant, equipment or processes to operate as anticipated, accidents, labour disputes, claims and limitations on insurance coverage and other risks of the mining industry, changes in national and local government regulation of mining operations, and regulations and other matters. There can be no assurance that such statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking statements. The Company disclaims any intention or obligation to update or revise any forward-looking statements, whether as a result of new information, future events or otherwise, except as required by law.

Contacts:
K92 Mining Inc.
Ian Stalker
Chief Executive Officer and Director
(604) 687-7130
(604) 608-9110 (FAX)

More Stories By Marketwired .

Copyright © 2009 Marketwired. All rights reserved. All the news releases provided by Marketwired are copyrighted. Any forms of copying other than an individual user's personal reference without express written permission is prohibited. Further distribution of these materials is strictly forbidden, including but not limited to, posting, emailing, faxing, archiving in a public database, redistributing via a computer network or in a printed form.

Latest Stories
"Qosmos has launched L7Viewer, a network traffic analysis tool, so it analyzes all the traffic between the virtual machine and the data center and the virtual machine and the external world," stated Sebastien Synold, Product Line Manager at Qosmos, in this SYS-CON.tv interview at 19th Cloud Expo, held November 1-3, 2016, at the Santa Clara Convention Center in Santa Clara, CA.
"We are a modern development application platform and we have a suite of products that allow you to application release automation, we do version control, and we do application life cycle management," explained Flint Brenton, CEO of CollabNet, in this SYS-CON.tv interview at DevOps at 19th Cloud Expo, held November 1-3, 2016, at the Santa Clara Convention Center in Santa Clara, CA.
The 20th International Cloud Expo has announced that its Call for Papers is open. Cloud Expo, to be held June 6-8, 2017, at the Javits Center in New York City, brings together Cloud Computing, Big Data, Internet of Things, DevOps, Containers, Microservices and WebRTC to one location. With cloud computing driving a higher percentage of enterprise IT budgets every year, it becomes increasingly important to plant your flag in this fast-expanding business opportunity. Submit your speaking proposal ...
You have great SaaS business app ideas. You want to turn your idea quickly into a functional and engaging proof of concept. You need to be able to modify it to meet customers' needs, and you need to deliver a complete and secure SaaS application. How could you achieve all the above and yet avoid unforeseen IT requirements that add unnecessary cost and complexity? You also want your app to be responsive in any device at any time. In his session at 19th Cloud Expo, Mark Allen, General Manager of...
The Internet of Things (IoT) promises to simplify and streamline our lives by automating routine tasks that distract us from our goals. This promise is based on the ubiquitous deployment of smart, connected devices that link everything from industrial control systems to automobiles to refrigerators. Unfortunately, comparatively few of the devices currently deployed have been developed with an eye toward security, and as the DDoS attacks of late October 2016 have demonstrated, this oversight can ...
"ReadyTalk is an audio and web video conferencing provider. We've really come to embrace WebRTC as the platform for our future of technology," explained Dan Cunningham, CTO of ReadyTalk, in this SYS-CON.tv interview at WebRTC Summit at 19th Cloud Expo, held November 1-3, 2016, at the Santa Clara Convention Center in Santa Clara, CA.
Bert Loomis was a visionary. This general session will highlight how Bert Loomis and people like him inspire us to build great things with small inventions. In their general session at 19th Cloud Expo, Harold Hannon, Architect at IBM Bluemix, and Michael O'Neill, Strategic Business Development at Nvidia, discussed the accelerating pace of AI development and how IBM Cloud and NVIDIA are partnering to bring AI capabilities to "every day," on-demand. They also reviewed two "free infrastructure" pr...
Major trends and emerging technologies – from virtual reality and IoT, to Big Data and algorithms – are helping organizations innovate in the digital era. However, to create real business value, IT must think beyond the ‘what’ of digital transformation to the ‘how’ to harness emerging trends, innovation and disruption. Architecture is the key that underpins and ties all these efforts together. In the digital age, it’s important to invest in architecture, extend the enterprise footprint to the cl...
Keeping pace with advancements in software delivery processes and tooling is taxing even for the most proficient organizations. Point tools, platforms, open source and the increasing adoption of private and public cloud services requires strong engineering rigor – all in the face of developer demands to use the tools of choice. As Agile has settled in as a mainstream practice, now DevOps has emerged as the next wave to improve software delivery speed and output. To make DevOps work, organization...
"Dice has been around for the last 20 years. We have been helping tech professionals find new jobs and career opportunities," explained Manish Dixit, VP of Product and Engineering at Dice, in this SYS-CON.tv interview at 19th Cloud Expo, held November 1-3, 2016, at the Santa Clara Convention Center in Santa Clara, CA.
More and more brands have jumped on the IoT bandwagon. We have an excess of wearables – activity trackers, smartwatches, smart glasses and sneakers, and more that track seemingly endless datapoints. However, most consumers have no idea what “IoT” means. Creating more wearables that track data shouldn't be the aim of brands; delivering meaningful, tangible relevance to their users should be. We're in a period in which the IoT pendulum is still swinging. Initially, it swung toward "smart for smar...
Rapid innovation, changing business landscapes, and new IT demands force businesses to make changes quickly. In the eyes of many, containers are at the brink of becoming a pervasive technology in enterprise IT to accelerate application delivery. In this presentation, attendees learned about the: The transformation of IT to a DevOps, microservices, and container-based architecture What are containers and how DevOps practices can operate in a container-based environment A demonstration of how ...
Successful digital transformation requires new organizational competencies and capabilities. Research tells us that the biggest impediment to successful transformation is human; consequently, the biggest enabler is a properly skilled and empowered workforce. In the digital age, new individual and collective competencies are required. In his session at 19th Cloud Expo, Bob Newhouse, CEO and founder of Agilitiv, drew together recent research and lessons learned from emerging and established compa...
Extracting business value from Internet of Things (IoT) data doesn’t happen overnight. There are several requirements that must be satisfied, including IoT device enablement, data analysis, real-time detection of complex events and automated orchestration of actions. Unfortunately, too many companies fall short in achieving their business goals by implementing incomplete solutions or not focusing on tangible use cases. In his general session at @ThingsExpo, Dave McCarthy, Director of Products...
Without a clear strategy for cost control and an architecture designed with cloud services in mind, costs and operational performance can quickly get out of control. To avoid multiple architectural redesigns requires extensive thought and planning. Boundary (now part of BMC) launched a new public-facing multi-tenant high resolution monitoring service on Amazon AWS two years ago, facing challenges and learning best practices in the early days of the new service. In his session at 19th Cloud Exp...