Welcome!

News Feed Item

Peregrine Diamonds Commences 2017 Work Program at Chidliak

VANCOUVER, BRITISH COLUMBIA -- (Marketwired) -- 06/19/17 -- Peregrine Diamonds Ltd. (TSX: PGD) ("Peregrine" or "the Company") is pleased to announce that it has completed final preparations for the 2017 work program at its 100%-owned Chidliak Diamond Project ("Chidliak") near Iqaluit, Nunavut, Canada. Field crew mobilization will commence on June 27, 2017 and core drilling of up to 7,500 metres at the CH-6 kimberlite pipe is expected to commence on July 5, 2017. Drilling at CH-6 will further delineate the kimberlite, with the objective of expanding the high grade CH-6 resource to a depth of 500 metres below surface. Approximately 1,000 metres of HQ-diameter core drilling will be used to gather geotechnical information and to allow completion of further open-pit design and optimization studies. Environmental base line studies also will form part of the 2017 work program and will focus on the collection of additional environmental data within the Chidliak Project area and the proposed transportation corridor between Iqaluit and the project site.

CH-6 OPEN PIT PLUS UNDERGROUND CONCEPT STUDY

As reported on March 6, 2017, the Company engaged JDS Energy & Mining Inc. ("JDS") in December 2016 to complete an internal, concept-level study to define the potential economic uplift that could be realized by developing the CH-6 kimberlite to a depth of 500 metres as a combined open-pit plus underground mining operation. The study clearly demonstrates the benefit of proving up the resource potential at the CH-6 kimberlite pipe below a depth of 260 metres, which is the current bottom of the Inferred Resource in the 2016 Preliminary Economic Assessment ("PEA").

2017 CH-6 WORK PROGRAM

The 2017 work program at Chidliak will focus on three main objectives:


--  Expansion of the current Inferred Resource at CH-6 - through
    approximately 7,500 metres of diamond core drilling to further
    demonstrate geological continuity, establish pipe margin pierce-points
    and obtain spatially representative kimberlite samples for caustic
    fusion diamond analysis. The main objective is to increase the depth of
    a categorized resource from 260 metres to 500 metres. Caustic fusion
    results will be used to model diamond grade and grade distribution of
    the kimberlite to a depth of 500 metres.
--  Refine open-pit geotechnical design parameters - as part of the 2017
    drilling program approximately 1000 metres of oriented HQ-diameter core
    and other geotechnical data required to refine the open-pit parameters,
    particularly the pit slope angles, will be acquired. This data will
    enable assumptions regarding open-pit design to be tested and further
    refined.
--  Advancing permitting - through continued environmental monitoring
    programs of the Chidliak project area and the proposed transportation
    corridor.

The Company expects the microdiamond analyses to be completed in the third quarter of 2017 and anticipates an updated resource estimate for CH-6 to be issued in the fourth quarter. If the resource at depths below 260 metres is of sufficient size and diamond grade, a new Preliminary Economic Assessment outlining a combined open-pit and underground mining operation for CH-6, in addition to an open-pit operation at CH-7, could be completed in the first quarter of 2018. The total cost for the work program is estimated at C$8.5 million.

FINANCING FOR THE 2017 PROGRAM

The Company is in final discussions regarding financing for the 2017 program and management is confident such financing will be obtained. Detailed information will be provided when the terms of the financing are finalized.

To enable the 2017 work program to commence immediately, the Company's Executive Chair, Eric Friedland (the "Lender") has agreed to lend the Company up to C$1,000,000 (the "Loan"). The Loan, which is unsecured, will accrue interest at a rate of 12% per annum, compounded yearly and not in advance. The Loan will be repayable on or before the earlier of September 30, 2017 and two business days after the date on which the Company closes any equity financing by way of issuance of shares. The Loan cannot be converted into, exchanged for, or otherwise modified to create any obligation on the Company to issue, directly or indirectly, any equity or voting securities of the Company or any subsidiary of the Company, for the repayment of either principal or interest on the Loan.

As the Lender is considered a "related party" under Multilateral Instrument 61-101-Protection of Minority Security Holders in Special Transactions ("MI 61-101"), the Loan is considered to be a "related party transaction" within the meaning of MI 61-101. The Company intends to rely on the exemptions from the formal valuation and minority shareholder approval requirements of MI 61-101 contained in section 5.5(a) and 5.7(1)(a) or (b) of MI 61-101 in respect of related party participation in the Loan. The securities of the Company are listed on the Toronto Stock Exchange. The fair market value of the Loan is less than C$2.5 million and neither the fair market value of the Loan, nor the fair market value of the consideration for the Loan, is expected to exceed 25% of the Company's current market capitalization. The Company has received the requisite non-interested directors' approval of the Loan.

QUALIFIED PERSONS

Dr. Herman Grutter, Peregrine's Vice President, Technical Services, is a Qualified Person and is responsible for the design of the Diamond Resource Development Program at Chidliak. Mr. Alan O'Connor, Peregrine's Program Manager, Chidliak Resource Evaluation, is a Qualified Person and is responsible for the design and conduct of field programs at Chidliak. Dr. Jennifer Pell, Peregrine's Chief Geologist, is a Qualified Person and is responsible for geological characterization and microdiamond sampling of core drilled at Chidliak.

Dr. Grutter, Mr. O'Connor and Dr. Pell have reviewed this release and approve of its contents.

ABOUT PEREGRINE DIAMONDS

Peregrine Diamonds is a TSX-listed diamond exploration and development company with assets located in northern Canada and Botswana.

Peregrine's core asset is its 100 percent-owned, 413,000-hectare Chidliak Project, located 120 kilometres from Iqaluit, the capital of Nunavut where 71 kimberlites have been discovered to date with eight being potentially economic. A Preliminary Economic Assessment ("PEA") of a Phase 1 Diamond Development ("CP1D") has been completed. The PEA highlights that the CP1D represents a robust, high margin, ten-year, open-pit mining project with very attractive economics, including after tax NPV of C$471M, IRR of 29.8% and a two year payback. An Inferred Mineral Resource of 11.39 million carats in 4.64 million tonnes of kimberlite at an average grade of 2.45 carats per tonne has been defined for a portion of the CH-6 kimberlite. In addition, a Target for Further Exploration ("TFFE") of 2.34 to 3.75 million tonnes of kimberlite to a depth of 380 metres below surface has been identified at CH-6. An independent diamond valuation by WWW International Diamond Consultants, of a 1,013 carat parcel of diamonds from CH-6 returned an average market price of US$213 per carat and modeled prices that range from a minimum of US$162 per carat to a high of US$236 per carat, with a base model price of US$188 per carat (all using the February 24, 2014 price book). An Inferred Mineral Resource of 4.23 million carats in 4.99 million tonnes of kimberlite at an average grade of 0.85 carats per tonne has been defined for a portion of the CH-7 kimberlite. In addition, TFFE of 0.90 to 2.36 million tonnes for a depth range of 240-320 metres has been estimated for the CH-7 kimberlite. An independent diamond valuation by WWW International Diamond Consultants, of a 735.75 carat parcel of diamonds from CH-7 returned an average market price of US$100 per carat and modelled prices that ranged from a minimum of US$94 per carat to a high of US$155 per carat, with a base model price of US$114 per carat (all using the February 1, 2016 price book). A TFFE of 1.27 to 3.19 million tonnes to 250 metres depth has been estimated for the CH-44 kimberlite pipe.

Additional details of the Chidliak 2016 PEA are available in a National Instrument ("NI") 43-101 technical report titled "Preliminary Economic Assessment Technical Report on the Chidliak Project, Nunavut, Canada" and dated effective July 7, 2016, available on SEDAR and the Company's website.

The Chidliak 2016 PEA is preliminary in nature and includes Inferred Mineral Resources that are considered too speculative geologically to have the economic considerations applied to them that would enable them to be categorized as Mineral Reserves. Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability. There is no certainty that the PEA will be realized.

The TFFEs identified above are conceptual in nature as there has been insufficient exploration to define a Mineral Resource. It is uncertain whether further exploration will result in any of these tonnages being delineated as Mineral Resources.

Peregrine holds eleven diamond prospecting licenses in Botswana that cover 661,330 hectares.

Peregrine also controls the 8,493-hectare Lac de Gras Project in the Northwest Territories, located approximately 27 kilometres from the Diavik Diamond Mine. The nine-hectare 72.1%-owned DO-27 kimberlite, located at Lac de Gras, hosts an Indicated Mineral Resource of 18.2 million carats of diamonds in 19.5 million tonnes of kimberlite at a grade of 0.94 carats per tonne and it is open at depth.

For information on data verification, exploration information and resource estimation procedures see the NI 43-101 technical reports entitled "Mineral Resource Estimate for the Chidliak Project, Baffin Island, Nunavut" and dated effective June 3, 2016 and "Peregrine Diamonds Limited DO-27 Diamond Project Northwest Territories, Canada NI 43-101 Technical Report" dated August 7, 2008 which are available on SEDAR and the Company's website.

For further information, please visit www.pdiam.com.

FORWARD-LOOKING STATEMENTS

This news release contains forward-looking statements within the meaning of Canadian securities legislation. All statements, other than statements of historical fact, that address activities, events or developments that the Company believes, expects or anticipates will or may occur in the future including, without limitation, statements relating to future management of the Company, proposed exploration and development programs, funding availability, anticipated exploration results, grade of diamonds and tonnage of material, resource estimates, anticipated diamond valuations and future exploration and operating plans are forward-looking statements. These forward-looking statements reflect the current expectations or beliefs of the Company based on information currently available to the Company.

Forward-looking statements are made based upon certain assumptions by the Company and other important factors that, if untrue, could cause the actual results, performances or achievements of the Company to be materially different from future results, performances or achievements expressed or implied by such statements. Such statements and information are based on numerous assumptions regarding present and future business strategies and the environment in which the Company will operate in the future, including the availability and continuation of experienced leadership for the Company, the price of diamonds, anticipated costs and ability to achieve goals. Certain important factors that could cause actual results, performances or achievements to differ materially from those in the forward-looking statements include, but are not limited to: receipt of regulatory approvals; anticipated timelines for community consultations and the impact of those consultations on the regulatory approval process; market prices for rough diamonds and the potential impact on the Chidliak Project; and future exploration plans and objectives.

Forward-looking statements are subject to a number of risks and uncertainties that may cause the actual results of the Company to differ materially from those discussed in the forward-looking statements and, even if such actual results are realized or substantially realized, there can be no assurance that they will have the expected consequences to, or effects on, the Company. Factors that could cause actual results or events to differ materially from current expectations include, among other things, uncertainties relating to continuity and availability of executive management, availability and cost of funds, timing and content of work programs, results of exploration activities, interpretation of drilling results and other geological data, risks relating to variations in the diamond grade and kimberlite lithologies; variations in rates of recovery and breakage; variations in diamond valuations and future diamond prices; the state of world diamond markets, reliability of mineral property titles, changes to regulations affecting the Company's activities, delays in obtaining or failure to obtain required project approvals, operational and infrastructure risk and other risks involved in the diamond exploration and development business. Any forward-looking statement speaks only as of the date on which it is made and, except as may be required by applicable securities laws, the Company disclaims any intent or obligation to update any forward-looking statement, whether as a result of new information, future events or results or otherwise. Although the Company believes that the assumptions inherent in the forward-looking statements are reasonable, forward-looking statements are not guarantees of future performance and accordingly undue reliance should not be put on such statements due to their inherent uncertainty.

More Stories By Marketwired .

Copyright © 2009 Marketwired. All rights reserved. All the news releases provided by Marketwired are copyrighted. Any forms of copying other than an individual user's personal reference without express written permission is prohibited. Further distribution of these materials is strictly forbidden, including but not limited to, posting, emailing, faxing, archiving in a public database, redistributing via a computer network or in a printed form.

Latest Stories
Artificial intelligence, machine learning, neural networks. We’re in the midst of a wave of excitement around AI such as hasn’t been seen for a few decades. But those previous periods of inflated expectations led to troughs of disappointment. Will this time be different? Most likely. Applications of AI such as predictive analytics are already decreasing costs and improving reliability of industrial machinery. Furthermore, the funding and research going into AI now comes from a wide range of com...
In this presentation, Striim CTO and founder Steve Wilkes will discuss practical strategies for counteracting fraud and cyberattacks by leveraging real-time streaming analytics. In his session at @ThingsExpo, Steve Wilkes, Founder and Chief Technology Officer at Striim, will provide a detailed look into leveraging streaming data management to correlate events in real time, and identify potential breaches across IoT and non-IoT systems throughout the enterprise. Strategies for processing massive ...
SYS-CON Events announced today that GrapeUp, the leading provider of rapid product development at the speed of business, will exhibit at SYS-CON's 21st International Cloud Expo®, which will take place October 31-November 2, 2017, at the Santa Clara Convention Center in Santa Clara, CA. Grape Up is a software company, specialized in cloud native application development and professional services related to Cloud Foundry PaaS. With five expert teams that operate in various sectors of the market acr...
SYS-CON Events announced today that Ayehu will exhibit at SYS-CON's 21st International Cloud Expo®, which will take place on October 31 - November 2, 2017 at the Santa Clara Convention Center in Santa Clara California. Ayehu provides IT Process Automation & Orchestration solutions for IT and Security professionals to identify and resolve critical incidents and enable rapid containment, eradication, and recovery from cyber security breaches. Ayehu provides customers greater control over IT infras...
Internet of @ThingsExpo, taking place October 31 - November 2, 2017, at the Santa Clara Convention Center in Santa Clara, CA, is co-located with 21st Cloud Expo and will feature technical sessions from a rock star conference faculty and the leading industry players in the world. The Internet of Things (IoT) is the most profound change in personal and enterprise IT since the creation of the Worldwide Web more than 20 years ago. All major researchers estimate there will be tens of billions devic...
You know you need the cloud, but you’re hesitant to simply dump everything at Amazon since you know that not all workloads are suitable for cloud. You know that you want the kind of ease of use and scalability that you get with public cloud, but your applications are architected in a way that makes the public cloud a non-starter. You’re looking at private cloud solutions based on hyperconverged infrastructure, but you’re concerned with the limits inherent in those technologies.
SYS-CON Events announced today that MobiDev, a client-oriented software development company, will exhibit at SYS-CON's 21st International Cloud Expo®, which will take place October 31-November 2, 2017, at the Santa Clara Convention Center in Santa Clara, CA. MobiDev is a software company that develops and delivers turn-key mobile apps, websites, web services, and complex software systems for startups and enterprises. Since 2009 it has grown from a small group of passionate engineers and business...
Today we can collect lots and lots of performance data. We build beautiful dashboards and even have fancy query languages to access and transform the data. Still performance data is a secret language only a couple of people understand. The more business becomes digital the more stakeholders are interested in this data including how it relates to business. Some of these people have never used a monitoring tool before. They have a question on their mind like “How is my application doing” but no id...
What's the role of an IT self-service portal when you get to continuous delivery and Infrastructure as Code? This general session showed how to create the continuous delivery culture and eight accelerators for leading the change. Don Demcsak is a DevOps and Cloud Native Modernization Principal for Dell EMC based out of New Jersey. He is a former, long time, Microsoft Most Valuable Professional, specializing in building and architecting Application Delivery Pipelines for hybrid legacy, and cloud ...
With major technology companies and startups seriously embracing Cloud strategies, now is the perfect time to attend 21st Cloud Expo October 31 - November 2, 2017, at the Santa Clara Convention Center, CA, and June 12-14, 2018, at the Javits Center in New York City, NY, and learn what is going on, contribute to the discussions, and ensure that your enterprise is on the right path to Digital Transformation.
Join us at Cloud Expo June 6-8 to find out how to securely connect your cloud app to any cloud or on-premises data source – without complex firewall changes. More users are demanding access to on-premises data from their cloud applications. It’s no longer a “nice-to-have” but an important differentiator that drives competitive advantages. It’s the new “must have” in the hybrid era. Users want capabilities that give them a unified view of the data to get closer to customers and grow business. The...
21st International Cloud Expo, taking place October 31 - November 2, 2017, at the Santa Clara Convention Center in Santa Clara, CA, will feature technical sessions from a rock star conference faculty and the leading industry players in the world. Cloud computing is now being embraced by a majority of enterprises of all sizes. Yesterday's debate about public vs. private has transformed into the reality of hybrid cloud: a recent survey shows that 74% of enterprises have a hybrid cloud strategy. Me...
"We focus on composable infrastructure. Composable infrastructure has been named by companies like Gartner as the evolution of the IT infrastructure where everything is now driven by software," explained Bruno Andrade, CEO and Founder of HTBase, in this SYS-CON.tv interview at 20th Cloud Expo, held June 6-8, 2017, at the Javits Center in New York City, NY.
SYS-CON Events announced today that Cloud Academy named "Bronze Sponsor" of 21st International Cloud Expo which will take place October 31 - November 2, 2017 at the Santa Clara Convention Center in Santa Clara, CA. Cloud Academy is the industry’s most innovative, vendor-neutral cloud technology training platform. Cloud Academy provides continuous learning solutions for individuals and enterprise teams for Amazon Web Services, Microsoft Azure, Google Cloud Platform, and the most popular cloud com...
"We are a monitoring company. We work with Salesforce, BBC, and quite a few other big logos. We basically provide monitoring for them, structure for their cloud services and we fit into the DevOps world" explained David Gildeh, Co-founder and CEO of Outlyer, in this SYS-CON.tv interview at DevOps Summit at 20th Cloud Expo, held June 6-8, 2017, at the Javits Center in New York City, NY.